In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or
|
|
- Bertram Mitchell
- 6 years ago
- Views:
Transcription
1 August 2016 Quarterly Summary Report on Approved (A) Project Preparatory Technical Assistance Not Exceeding $5,000,000; (B) Technical Assistance Projects Not Exceeding $225,000; and (C) Technical Assistance Cluster Subprojects (April June 2016) This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011.
2 In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
3 LIST OF TECHNICAL ASSISTANCE PROJECTS Seq. No. TA No. TA Name Amount ($'000) Date Approved (A) PROJECT PREPARATORY TECHNICAL ASSISTANCE NOT EXCEEDING $5,000, AZE Shah Deniz Stage II Investment Plan 1, Apr INO Banten and West Nusa Tenggara Wind Power Development Apr INO Affordable Healthcare Network Study May-16 4 Multipartner Financing Facility for the Highlands 9117-PNG Highway 1, May-16 5 Guangxi Modern Technical and Vocational 9096-PRC Education and Training Development Program Apr-16 6 Guangxi Regional Cooperation and Integration 9120-PRC Promotion Investment Program Jun SRI Capital Market Development Program Apr UZB Power Generation Efficiency Improvement 1, Apr UZB Affordable Rural Housing Program Apr VIE Financial Sector Development and Inclusion Program Apr Improving the Quality of Basic Education in the 9097-REG North Pacific Apr-16 (B) TECHNICAL ASSISTANCE PROJECTS NOT EXCEEDING $225,000 None (C) TECHNICAL ASSISTANCE CLUSTER SUBPROJECTS INO INO INO REG Sustainable Infrastructure Assistance Program - Strengthening Fiscal Risk Management of Accelerated Infrastructure Delivery (Subproject 9) Sustainable Infrastructure Assistance Program - Strengthening Verification in Results-Based Programs in Indonesia's Power Sector (Subproject 8) Sustainable Infrastructure Assistance Program - Improving Multimodal Connectivity to Support Integrated Land and Sea Tollway (Subproject 7) Strengthening Project Preparation Capacity in Asia and the Pacific - Support for Capacity Development, Knowledge and Networking (Subproject 1) 1, May May-16 1, May-16 5, Apr-16
4 2 (A) PROJECT PREPARATORY TECHNICAL ASSISTANCE TA 9106-AZE: Shah Deniz Stage II Investment Plan Executing Agency : Southern Gas Corridor Closed Joint-Stock Company TA Amount ($'000) : 1,000.0 Business Opportunities Listing : 26 April 2016 Date Approved : 19 May 2016 The multitranche financing facility (MFF) will support the government s investment in the Shah Deniz Stage II gas field expansion. It aims to improve Azerbaijan s economy by increasing revenues through the: (i) export of natural gas from the expanded Shah Deniz natural gas production and processing facility, providing the fiscal space to diversify its industry away from oil; and (ii) creation of additional domestic employment. As a new source of gas supply to Europe, it will diversify Europe s energy sources and contribute to the development of a multi-seller, multibuyer market. The investment plan s impact is aligned with: (i) the improved fiscal position of Azerbaijan; (ii) regional integration through increased exports and opening of the European market to Azerbaijan natural gas exports; and (iii) increased foreign direct investment in Azerbaijan. The outcome will be increased volume of natural gas exports. The major outputs are: (i) completed Shah Deniz Stage II (SDII) natural gas production and processing facility; and (ii) increased employment of Azerbaijani nationals. The TA will prepare a feasibility study to process the investment plan and partial credit guarantee and/or loan for tranche 1. TA 9104-INO: Banten and West Nusa Tenggara Wind Power Development Executing Agency : Asian Development Bank TA Amount ($'000) : Business Opportunities Listing : 27 April 2016 Date Approved : 8 April 2016 The TA will support grid integration, and environmental and social studies across three sites. The grid integration studies will investigate the robustness of the grid structure and make specific recommendations for grid upgrade in order to address the instability of electrical output for each site. The environmental and social assessments will include reviews of environmental constraints analyses, as well as biodiversity and socio-economic baseline studies required by the Indonesian government, international best practice and ADB safeguards for wind farm development. The project will ultimately increase the renewable energy capacity in Indonesia to meet the country s rapidly growing demand for power in a more sustainable manner. In addition, the project will contribute to Indonesia s broader initiatives to achieve the national targets of: (i) increasing the use of renewable energy to 23% by 2025; and (ii) reducing greenhouse gas emissions by at least 29% by The project will also demonstrate the viability and sustainability of private sector wind developments in provinces across various grids with different size and demand profiles. TA 9107-INO: Affordable Healthcare Network Study Executing Agency : Asian Development Bank TA Amount ($'000) : Business Opportunities Listing : 4 May 2016
5 3 Date Approved : 3 May 2016 The TA will assist Asia Venture Capital Holdings Private Limited (AVCH, or the Company ) in the development of a new low-cost healthcare business model for the Indonesian mass market. The Company currently owns and operates Indonesia s fifth-largest network of pharmacies under the Viva Generik brand. Founded in 2011, Viva Generik has grown to become one of the fastest growing private operators in Indonesia s healthcare industry. The existing network consists of 153 outlets in 4 provinces serving 4.5 million customers. To supplement its pharmacy business and address unmet demand, the Company is piloting a new business model, in which pharmacy outlets are equipped with physician and medical testing services. The integrated approach, if deployed at scale, could help address critical service gaps in less-developed towns and suburbs in Indonesia. The TA would help the Company develop and assess the new business model, and improve likely success by ensuring that newly hired general practitioners (GP) are trained to a high quality standard. The TA will support: (i) an operational assessment of the Company s GP operations, with a view of identifying and implementing initiatives aimed at improving the quality of health care delivery, including those provided to women and children patients; and (ii) a business model performance review to validate the Company s multi-service approach to private sector healthcare services in less developed urban areas in Indonesia. The review will also identify associated impacts (if any) of Universal Healthcare rollout, and indicate the potential to participate in and improve alignment with the program. The studies will provide crucial information to serve as basis for scaling-up the Company s business. TA 9117-PNG: Multipartner Financing Facility for the Highlands Highway Executing Agency : Asian Development Bank TA Amount ($'000) : 1,500.0 Business Opportunities Listing : 31 March 2016 Date Approved : 13 May 2016 The Highlands Highway was identified as a priority investment in the National Transport Strategy , the government s roadmap for development in the transport sector. The project provides an opportunity to revisit the sector road map and the loan undertakings, focusing on road maintenance and safeguards, based on the current progress. The expected impact is aligned with national strategies to improve access to health, education and standard of living of the people of PNG, increase opportunities for equality and prosperity in rural areas and provide well integrated, safe, financially and environmentally sustainable transport systems. The expected outcome is efficient and safe movement of people, goods and services between the Highlands region and domestic and international markets. The investment and maintenance project is proposed to achieve the following outputs: (i) restored, upgraded and effectively maintained 450 kilometers of 2-lane rural Highlands Highway from Lae Nadzab airport to Kagamuga airport at Mt. Hagen; (ii) increased road safety for pedestrians and vehicle passengers on the Highlands Highway; (iii) improved transport logistics and services in the Highlands region to strengthen value chain for domestic and international trade; and (iv) improved project management and institutional capacity to deliver the project and sustain its benefits. The following due diligence will be carried out under the PPTA for the MFF and its first project: technical, economic and financial, governance, poverty and social, safeguards, and integrity due diligence for proposed cofinanciers.
6 4 TA 9096-PRC: Guangxi Modern Technical and Vocational Education and Training Development Program Executing Agency : Guangxi Education Department TA Amount ($'000) : Business Opportunities Listing : 27 October 2015 Date Approved : 18 April 2016 The program will: (i) promote regional cooperation and integration by expanding formal linkages and exchange programs between Guangxi s technical and vocational education and training (TVET) institutions and those in the Association of Southeast Asian Nations and Pacific region countries, focusing on priority trade and investment sectors; (ii) promote partnerships with industry and national, regional, and international institutions for improving the quality and responsiveness of TVET to Guangxi s priority economic growth sectors; and (iii) focus on poverty reduction, emphasizing development of skills that enhance rural incomes, particularly in the agriculture sector. An impact evaluation will also be conducted by ADB to measure impacts of the reforms on learning and employment outcomes. The TA will support the development of the program. It will: (i) define program scope and design; (ii) undertake assessments to establish program soundness, the expenditure framework and financing, and results; (iii) undertake program system assessments; and (iv) enhance knowledge of the Guangxi Education Department of other TVET programs in similar contexts. Status of Consulting Services : Consultants have been fielded. TA 9120-PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program Executing Agency : Guangxi Government Leading Group for Utilization of Foreign Loans TA Amount ($'000) : Business Opportunities Listing : 10 June 2016 Date Approved : 7 June 2016 The investment program aims to support the efforts of Guangxi Zhuang Autonomous Region (Guangxi) of the People s Republic of China (PRC) for promoting regional cooperation and integration (RCI), particularly with neighboring Viet Nam. Given the nature of RCI, the investment program will cover various sectors and will have impacts not only on Guangxi, but also on the other side of the border. Various subprojects in multiple sectors have been proposed for financing under an MFF. The MFF will help realize economic growth potential for border areas and beyond, in PRC and Viet Nam, and provide efficient transport and trade operations along GMS North-South Economic Corridor. The TA will be needed to design the MFF and properly address the RCI dimension of the investment program. It will: (i) conduct sector reviews to identify key issues to be addressed by the investment program; (ii) identify subprojects in the first tranche of the MFF and help the executing agency (EA) prepare preliminary feasibility studies, which may include technical, financial, economic, and socioeconomic analysis; cost estimates; environmental and social impact assessment; institutional and capacity development plans; and a study for initial benchmark indicators; (iii) conduct pre-implementation work for the investment program; (iv) assist the EA and implementing agencies in assessing preliminary engineering designs and specifications; verifying detailed cost estimates; recommending procurement arrangements and preparing terms of references for procurement consulting services during MFF implementation; (v) suggest key features in contractual agreements or other necessary legal or institutional arrangements
7 5 arrangements; and (vi) contribute to the preparation of the facility administration manual. Status of Consulting Services : Consultants have been fielded. TA 9105-SRI: Capital Market Development Program Executing Agency : Ministry of National Policies and Economic Affairs TA Amount ($'000) : Business Opportunities Listing : 27 April 2016 Date Approved : 20 April 2016 The program aims to enhance the capacity and size of the capital market in Sri Lanka, through a strong legal and regulatory framework. It would combine policy reforms with information and communication technology investments and technical assistance to support reforms that will strengthen capital markets in Sri Lanka. It aims to provide a well-functioning financial system that supports basic capital and investment needs, as well as to align Sri Lanka s longer-term economic objectives with the Capital Market Development Master Plan. The program s outcome will be greater capacity and size of the capital market. The outputs will be: (i) improved legal and regulatory structures; (ii) a developed bond market; (iii) improved financialinstrument tax policies; (iv) an enabling environment for derivatives (including commodities); and (v) developed insurance and pension industries. The TA is necessary to effectively formulate the program, which will support the government s commitment to meaningful capital market reform. Its objective is to identify policy measures to support the development of a robust financial market system in Sri Lanka that is well balanced, sustainable, and resilient; and which is able to effectively intermediate savings to finance investment. Status of Consulting Services : Consultants have been fielded. TA 9099-UZB: Power Generation Efficiency Improvement Executing Agency : Joint-Stock Company Uzbekenergo TA Amount ($'000) : 1,500.0 Business Opportunities Listing : 22 April 2016 Date Approved : 19 April 2016 The ensuing project from this PPTA will construct two units of 450 megawatt (MW) energy efficient combined cycle gas turbines (CCGT) at the Talimarjan Thermal Power Plant located in Kashkadarya region. It will build on the experience gained through Talimarjan Power Project (Phase 1) by further improving the corporate governance and promoting commercialization of the energy sector. The impact is aligned with Uzbekistan s national investment program for The outcome will be increased energy efficient power supply. The project will have two main outputs: (i) increase in installed power generation capacity; and (ii) improved financial management capacity of Talimarjan Thermal Power Plant (TPP). The TA is necessary to: (i) review the technical, economic and financial viability of the project and ascertain the project rationale, scope, cost, schedule, implementation arrangements, risks and mitigation measures; (ii) ensure the compliance with ADB Safeguard Policy Statement (2009) and identify mitigation measures and institutional strengthening; and (iii) assist the project executing agency/implementing agency in advance contracting for the ensuing loan project.
8 6 TA 9108-UZB: Affordable Rural Housing Program Executing Agency : Ministry of Economy TA Amount ($'000) : Business Opportunities Listing : 6 May 2016 Date Approved : 29 April 2016 The program impact is aligned with the national goal of improved quality of life in rural areas of Uzbekistan based on availability of quality housing, related infrastructure, and improved services. The outcome will be increased number of rural population benefiting from affordable housing in line with standards of equity, transparency and quality. The outcome is supported by three outputs: (i) improved quality of application process and construction process; (ii) improved policies and systems for the rural housing sector; and (iii) strengthened national capacities in program management and performance monitoring. The disbursement-linked outcome indicator (DLI 1) focuses on the rural population that live in new quality housing. Output indicators (DLI 2, DLI 3 and DLI 4) focus on mortgage-backed loans for the beneficiaries, minimum share of women among home buyers in the RBL program, and climate change risk mitigation. DLI 5 measures the improvements to ensure sustainability of rural mortgage financing through improved financial management in participating banks. DLIs 6, 7 and 8 focus on improvements in program level systems in engineering, procurement, and management and monitoring of the RBL program and progress. Indicators for prior results ensure that the government finalizes the multi-year housing program with systems to ensure equity in beneficiary selection, upfront improvements in climate change risk mitigation, and efficient procurement systems. The TA will help: (i) the government design the multi-year housing program; (ii) undertake technical assessments to establish program soundness, expenditure and financing, and results; and (iii) undertake program system assessments. Status of Consulting Services : Consultants have been fielded. TA 9101-VIE: Financial Sector Development and Inclusion Program Executing Agency : State Bank of Viet Nam TA Amount ($'000) : Business Opportunities Listing : 28 April 2016 Date Approved : 22 April 2016 To achieve the targets of the Socio-Economic Development Plan (SEDS) , the Government of Viet Nam has established the strategic objective of developing financial markets that provide efficient and inclusive intermediation, and that are safely operated, efficiently managed and effectively supervised. A specific reform agenda has been set out under the SEDS , the bond market development road map and the government s action plan to address deficiencies identified by the Financial Sector Assessment Program. The TA will support the program by developing select areas of the capital market, furthering the government s financial inclusion agenda, and enhancing the capacity of implementing agencies to undertake the proposed reforms. It will: (i) increase financial sector stability; (ii) deepen the nonbank financial sector; and (iii) promote financial inclusion. The TA will also encompass initiatives to achieve measurable reductions in systemic risk through non-performing loan resolution. Sequenced reforms will prioritize the establishment of a more highly developed government debt market to serve as the foundation for a corporate debt market. New initiatives will be introduced to engage the contractual savings sector in this process and eventually provide stable and sophisticated institutional demand for long-term asset classes. The TA will promote financial inclusion by enhancing the role of microfinance and microinsurance, providing
9 7 more inclusive access to the payment system, and introducing agent banking. TA 9097-REG: Improving the Quality of Basic Education in the North Pacific Executing Agency : National Department of Finance and Administration in Federal States of Micronesia (FSM), and the Ministry of Finance in the Republic of Marshall Islands (RMI) TA Amount ($'000) : Business Opportunities Listing : 22 April 2016 Date Approved : 18 April 2016 The project will improve the learning progress of students with a focus on literacy and numeracy in the basic grades, and will strengthen teacher development, and early grade learning assessment. It will develop bilingual teaching and learning resources for literacy and numeracy, improve school governance and management; and increase parent/community involvement in education. It will allow for a more comprehensive and sustained approach required for effective reforms within the sector. Its impact will be improved quality of education in the FSM and RMI. The outcome will be improved student learning in primary education. Project output areas include: (i) better prepared teachers in primary education; (ii) strengthened capacity to use assessment to improve learning; (iii) expanded access and usage of bilingual teaching and learning resources and materials for literacy and numeracy; and (iv) strengthened governance and management of schools, including parent/community engagement. The TA will assist in the preparation of assessments, studies, and due diligence requirements for the ensuing investment project in the basic education sector. It will assess existing challenges and develop a project that is anchored in the FSM and RMI country context, and suitable for ADB and cofinancing with regard to technical, financial/economic, institutional capacity, and safeguards.
10 8 (B) TECHNICAL ASSISTANCE PROJECTS NOT EXCEEDING $225,000 None
11 9 (C) TECHNICAL ASSISTANCE CLUSTER SUBPROJECTS TA 9109-INO: Sustainable Infrastructure Assistance Program - Strengthening Fiscal Risk Management of Accelerated Infrastructure Delivery (Subproject 9) Type of Technical Assistance : Capacity Development Executing Agency : Directorate General of Budget Financing and Risk Management TA Amount ($'000) : 1, Business Opportunities Listing : 18 April 2016 Date Approved : 6 May 2016 The current constraints in fiscal risk management affect the ability of the Ministry of Finance to timely evaluate guarantee requests and adequately manage the fiscal risk of a rapidly growing, more complex and diverse portfolio of infrastructure projects. The lessons learned under a TA on enhancing private sector participation in infrastructure provision (TA 4872-INO) include the need to: (i) have sufficient fiscal space to realize well-intended infrastructure reforms; (ii) have some level of legal and institutional maturity for managing private participation in infrastructure; and (iii) focus capacity building through on-the-job advisory assistance to enable knowledge and skill transfer without distracting the government staff from delivering their work programs. All these lessons have been incorporated in this TA subproject which will synergize with ADB s ongoing policy-based loans on Stepping Up Investment for Growth Acceleration Program and Sustainable and Inclusive Energy Program and associated TAs. The TA will provide capacity building and on-call advisory assistance to the Ministry of Finance's Directorate General on Budget Financing and Risk Management for the timely and efficient evaluation, negotiation, issuance, monitoring, budgeting, financing, and disclosure of government guarantees for infrastructure projects. The impact of the TA will be the increase of fiscally sustainable public and private investments in infrastructure by The outcome will be strengthened government capacity to manage fiscal risks due to the acceleration of infrastructure delivery. TA 9113-INO: Sustainable Infrastructure Assistance Program - Strengthening Verification in Results-Based Programs in Indonesia's Power Sector (Subproject 8) Type of Technical Assistance : Capacity Development Executing Agency : P. T. Perusahaan Listrik Negara TA Amount ($'000) : Business Opportunities Listing : 27 April 2016 Date Approved : 16 May 2016 The TA subproject supports P. T. Perusahaan Listrik Negara s (PLN s) broader program for the strengthening of the Sumatra grid with the results-based lending (RBL) program covering both transmission and distribution. It will support the overall program impact of enhancing the quality of life in Indonesian society, with the sustainable use of electricity acting as a key driver of increased economic activity. The outcome is strengthening the monitoring and evaluation methodologies and capacity of PLN through the assistance of a third party independent verification agent. The TA subproject will be coordinated with the World Bank s program for results (PforR) which complements ADB s RBL and also supports PLN s program to strengthen the Sumatra grid. While the ADB program covers both transmission and distribution, World Bank PforR focuses entirely on distribution. Given the conceptual closeness of the ADB and World Bank programs, the proposed TA on independent evaluation will cover both institutions
12 10 and its implementation will be overseen by ADB. TA 9116-INO: Sustainable Infrastructure Assistance Program - Improving Multimodal Connectivity to Support Integrated Land and Sea Tollway (Subproject 7) Type of Technical Assistance : Capacity Development Executing Agency : National Development Planning Agency (BAPPENAS) TA Amount ($'000) : 1,250.0 Business Opportunities Listing : 12 May 2016 Date Approved : 16 May 2016 The TA will support the strengthening of domestic transport connectivity in Indonesia related to Sea Tollway. The World Bank (WB) is the only other major development agency currently involved in sector planning support and logistics reform especially in major ports. This TA has been discussed with the WB and other development agencies during the scoping exercise between November 2015 and January 2016 and at the BAPPENAS stakeholder meeting on 7 January 2016 to ensure that the TA will complement, but not overlap with other agency maritime sector initiatives. The TA will: (i) complete port and network analysis of cargo movements along the Sea Tollway corridor; (ii) improve policy framework to support implementation of Sea Tollway; and (iii) develop an implementation plan and an investment project pipeline for the Sea Tollway. The impact will be improved implementation of Sea Tollway and hinterland multimodal connectivity policy. The outcome will be enhanced organizational capacity for implementing Sea Tollway. TA 9098-REG: Strengthening Project Preparation Capacity in Asia and the Pacific - Support for Capacity Development, Knowledge and Networking (Subproject 1) Type of Technical Assistance : Capacity Development Executing Agency : Asia Development Bank TA Amount ($'000) : 5,000.0 Business Opportunities Listing : 26 April 2016 Date Approved : 19 April 2016 ADB established the Asia Pacific Project Preparation Facility (AP3F) in October 2014 to provide the additional resources and technical support for the preparation of public private partnerships (PPPs) and developing the enabling environment for PPPs. AP3F s primary objective is to assist developing member country (DMC) governments and their public sector agencies (DMC Agencies) prepare and structure infrastructure projects with private sector participation (including PPP modalities) and bring them to the global market. Subproject 1 will provide ancillary capacity development support to DMCs to continuously improve their skills in project identification, preparation, structuring, and financing of infrastructure PPP projects as well as streamline DMC agencies access to the resources of the AP3F. It will support a range of upstream activities and will give priority to infrastructure projects that: (i) have a positive impact on regional connectivity and support regional economic integration; (ii) take into account climate change and are demonstrably climate-friendly and climate-resilient; and (iii) demonstrate value for money and the potential for replication in the sector, country, and/or region. Subproject 1 resources will be made available to DMC agencies to help assess and build their capacity for integrated infrastructure and strategy planning; capital investment planning and programming;
13 11 financial management; and project management and supervision. It will also include knowledge generation and dissemination on policy, fiscal, and institutional frameworks for sustainable delivery of PPP projects. Status of Consulting Services : Consultants have been fielded.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or
April 2018 Quarterly Summary Report on Approved (A) Transaction Technical Assistance Not Exceeding $5,000,000; (B) Knowledge and Support Technical Assistance Projects Not Exceeding $225,000; and (C) Technical
More informationPROGRAMMING AND MODALITIES
CAPE PRC, Linked Document 4 PROGRAMMING AND MODALITIES A. Country Programming 1. The Asian Development Bank (ADB) and the People s Republic of China (PRC) hold joint country programming missions (CPMs)
More informationMaldives: Strengthening Capacity for Operations Management
Completion Report Project Number: 45416-001 Technical Assistance Number: 8070 July 2018 Maldives: Strengthening Capacity for Operations Management This document is being disclosed to the public in accordance
More informationSupporting Regional Project Development for Association of Southeast Asian Nations Connectivity
Major Change in Technical Assistance Project Number: 46309-001 TA Number: 8240 November 2013 Supporting Regional Project Development for Association of Southeast Asian Nations Connectivity ABBREVIATIONS
More informationPeople s Republic of China: Improving Energy Efficiency, Emission Control, and Compliance Management of the Manufacturing Industry
Technical Assistance Report Project Number: 48005-001 Policy and Advisory Technical Assistance (PATA) October 2014 People s Republic of China: Improving Energy Efficiency, Emission Control, and Compliance
More informationSECTOR ASSESSMENT (SUMMARY): FINANCE (SMALL AND MEDIUM-SIZED ENTERPRISE FINANCE AND LEASING) 1. Sector Performance, Problems, and Opportunities
Second Small and Medium-Sized Enterprise Development Project (RRP BAN 36200) SECTOR ASSESSMENT (SUMMARY): FINANCE (SMALL AND MEDIUM-SIZED ENTERPRISE FINANCE AND LEASING) Sector Road Map 1. Sector Performance,
More informationTechnical Assistance Reforms Improving the Speed, Relevance, and Quality of Technical Assistance Operations
June 2017 Technical Assistance Reforms Improving the Speed, Relevance, and Quality of Technical Assistance Operations This document is being disclosed to the public in accordance with ADB s Public Communications
More information2010/3 Science and technology for development. The Economic and Social Council,
Resolution 2010/3 Science and technology for development The Economic and Social Council, Recalling the 2005 World Summit Outcome, which emphasizes the role of science and technology, including information
More informationThe 26 th APEC Economic Leaders Meeting
The 26 th APEC Economic Leaders Meeting PORT MORESBY, PAPUA NEW GUINEA 18 November 2018 The Chair s Era Kone Statement Harnessing Inclusive Opportunities, Embracing the Digital Future 1. The Statement
More information10 th APEC TRANSPORTATION MINISTERIAL MEETING 7 th October 2017 Port Moresby, Papua New Guinea Ministerial Statement
10 th APEC TRANSPORTATION MINISTERIAL MEETING 7 th October 2017 Port Moresby, Papua New Guinea Ministerial Statement 1. We, the Ministers responsible for transportation, met in Port Moresby, Papua New
More informationMainstreaming Air Quality in Urban Development through South South Twinning
Completion Report Project Number: 46250-001 Technical Assistance Number: 8751 March 2018 Mainstreaming Air Quality in Urban Development through South South Twinning This document is being disclosed to
More informationSTRATEGIC ORIENTATION FOR THE FUTURE OF THE PMR:
STRATEGIC ORIENTATION FOR THE FUTURE OF THE PMR: ALEXANDER LOTSCH, FCPF SECRETARIAT ADRIEN DE BASSOMPIERRE, PMR SECRETARIAT PRICING CARBON AND SHAPING THE NEXT GENERATION OF CARBON MARKETS Context Strategic
More informationAssessing and Monitoring Social Protection Programs in Asia and the Pacific
Completion Report Project Number: 47215-001 Technical Assistance Number: 8677 February 2018 Assessing and Monitoring Social Protection Programs in Asia and the Pacific This document is being disclosed
More informationClimate Change Innovation and Technology Framework 2017
Climate Change Innovation and Technology Framework 2017 Advancing Alberta s environmental performance and diversification through investments in innovation and technology Table of Contents 2 Message from
More informationASEAN: A Growth Centre in the Global Economy
Bank Negara Malaysia Governor Dr. Zeti Akhtar Aziz Speech at the ASEAN SME Conference 2015 It is my pleasure to be here this afternoon to speak at this inaugural ASEAN SME Conference. This conference takes
More informationHigh Level Seminar on the Creative Economy and Copyright as Pathways to Sustainable Development. UN-ESCAP/ WIPO, Bangkok December 6, 2017
High Level Seminar on the Creative Economy and Copyright as Pathways to Sustainable Development UN-ESCAP/ WIPO, Bangkok December 6, 2017 Edna dos Santos-Duisenberg creative.edna@gmail.com Policy Advisor
More informationTraditional & Alternative Business Models for SME Financing in Asia
Traditional & Alternative Business Models for SME Financing in Asia ESCAP Workshop on SME Access to Finance and the Role of Development Banks in Asia and the Pacific and Latin America Session 3 27 September
More informationImplementation of Sustainable Transport for All (Cofinanced by the Government of Austria)
Technical Assistance Report Project Number: 50370-001 Knowledge and Support Technical Assistance (KSTA) November 2017 Implementation of Sustainable Transport for All (Cofinanced by the Government of Austria)
More informationReview of Technical Assistance Special Fund Operations Measures for Improving Effectiveness
ASIAN DEVELOPMENT FUND (ADF) ADF X MIDTERM REVIEW MEETING Review of Technical Assistance Special Fund Operations Measures for Improving Effectiveness October 21 ABBREVIATIONS ADB Asian Development Bank
More informationDRAFT TEXT on. Version 2 of 9 September 13:00 hrs
DRAFT TEXT on SBSTA 48.2 agenda item 5 Development and transfer of technologies: Technology framework under Article 10, paragraph 4, of the Paris Agreement Version 2 of 9 September 13:00 hrs Elements of
More informationInitial draft of the technology framework. Contents. Informal document by the Chair
Subsidiary Body for Scientific and Technological Advice Forty-eighth session Bonn, 30 April to 10 May 2018 15 March 2018 Initial draft of the technology framework Informal document by the Chair Contents
More informationMongolia: Intelligent Transport Systems Development for Mongolia
Technical Assistance Report Project Number: 48082-001 Policy and Advisory Technical Assistance (PATA) July 2016 Mongolia: Intelligent Transport Systems Development for Mongolia (Financed by the Republic
More informationOPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.
OM Section D12/BP Page 1 of 12 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction TECHNICAL ASSISTANCE 1.
More informationMongolia: Strengthening Systems for Promoting Science, Technology, and Innovation
Technical Assistance Report Project Number: 51123-001 Knowledge and Support Technical Assistance (KSTA) September 2017 Mongolia: Strengthening Systems for Promoting Science, Technology, and Innovation
More informationASIAN DEVELOPMENT BANK
ASIAN DEVELOPMENT BANK TAR:OTH 37670 TECHNICAL ASSISTANCE (Financed by the Poverty Reduction Cooperation Fund) FOR MAKING RESOURCE ALLOCATION PRO-POOR AND PARTICIPATORY IN THE PACIFIC June 2004 ABBREVIATIONS
More informationNovember 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS
November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS Note: At the joint meeting of the CTF and SCF Trust Fund Committees held on November 3, 2011, the meeting reviewed the
More informationInfrastructure services for private sector development (P) Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Updated Project Information Document () Report No: 30298 Project Name CROATIA - Croatia
More informationEmerging Transportation Technology Strategic Plan for the St. Louis Region Project Summary June 28, 2017
Emerging Transportation Technology Strategic Plan for the St. Louis Region Project Summary June 28, 2017 Prepared for: East West Gateway Council of Governments Background. Motivation Process to Create
More informationInnovation-Based Economic Development Strategy for Holyoke and the Pioneer Valley
Massachusetts Technology Collaborative John Adams Innovation Institute Innovation-Based Economic Development Strategy for Holyoke and the Pioneer Valley Innovation District Task Force Meeting October 27,
More informationPLAN OF DEVELOPMENT: ASPECT ON THE GOVERNMENTAL POLICY
PLAN OF DEVELOPMENT: ASPECT ON THE GOVERNMENTAL POLICY By: SARYONO HADIWIDJOYO Head Sub Directorate Exploration & Exploitation Development Directorate of Exploration & Exploitation Directorate General
More informationSME Finance: A Priority for G20/GPFI. Natascha Beinker, BMZ Global SME Finance Forum, 2. November 2017
SME Finance: A Priority for G20/GPFI Natascha Beinker, BMZ Global SME Finance Forum, 2. November 2017 Global SME Finance Forum 2017 02 November 2017 Content Global Partnership for Financial Inclusion (GPFI)
More informationNew Development Bank Technical Assistance Policy
New Development Bank Technical Assistance Policy Owner: Operations Division Version: 2016 V1 Approved Date: January 21, 2016 Technical Assistance Policy All rights reserved. Any unauthorized use, duplication
More informationASIAN DEVELOPMENT BANK
ASIAN DEVELOPMENT BANK TAR: OTH 37715 PROPOSED TECHNICAL ASSISTANCE (Cofinanced by the Poverty and Environment Fund) FOR THE POVERTY AND ENVIRONMENT PROGRAM November 2003 ABBREVIATIONS ADB Asian Development
More informationPan-Canadian Trust Framework Overview
Pan-Canadian Trust Framework Overview A collaborative approach to developing a Pan- Canadian Trust Framework Authors: DIACC Trust Framework Expert Committee August 2016 Abstract: The purpose of this document
More informationTechnical Assistance Report. Assessment of Power Sector Reform in Asia and the Pacific
Technical Assistance Report Project Number: 45240 Research and Development Technical Assistance (RDTA) November 2011 Assessment of Power Sector Reform in Asia and the Pacific The views expressed herein
More informationTERMS OF REFERENCE FOR CONSULTANTS
Strengthening Systems for Promoting Science, Technology, and Innovation (KSTA MON 51123) TERMS OF REFERENCE FOR CONSULTANTS 1. The Asian Development Bank (ADB) will engage 77 person-months of consulting
More informationBrief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO
Brief to the Senate Standing Committee on Social Affairs, Science and Technology Dr. Eliot A. Phillipson President and CEO June 14, 2010 Table of Contents Role of the Canada Foundation for Innovation (CFI)...1
More informationHigher Education for Science, Technology and Innovation. Accelerating Africa s Aspirations. Communique. Kigali, Rwanda.
Higher Education for Science, Technology and Innovation Accelerating Africa s Aspirations Communique Kigali, Rwanda March 13, 2014 We, the Governments here represented Ethiopia, Mozambique, Rwanda, Senegal,
More informationAction Policy for Fiscal 2017
January 18, 2017 Japan Textile Federation Action Policy for Fiscal 2017 Japan Textile Federation (JTF) has been working actively by recognizing identity of the textile industry such as the power to support
More informationMSMEs' Competitiveness and Innovation in the Digital Age
2016/ISOM/SYM/014 Session IV MSMEs' Competitiveness and Innovation in the Digital Age Submitted by: NCAPEC Symposium on Priorities for APEC 2017 Ha Noi, Viet Nam 8 December 2016 MSMEs Competitiveness and
More informationWater, Energy and Environment in the scope of the Circular Economy
Water, Energy and Environment in the scope of the Circular Economy Maria da Graça Carvalho 11th SDEWES Conference Lisbon 2016 Contents of the Presentation 1. The Circular Economy 2. The Horizon 2020 Program
More informationScoping Paper for. Horizon 2020 work programme Societal Challenge 4: Smart, Green and Integrated Transport
Scoping Paper for Horizon 2020 work programme 2018-2020 Societal Challenge 4: Smart, Green and Integrated Transport Important Notice: Working Document This scoping paper will guide the preparation of the
More informationInclusively Creative
In Bandung, Indonesia, December 5 th to 7 th 2017, over 100 representatives from the government, civil society, the private sector, think-tanks and academia, international organization as well as a number
More informationNational Innovation System of Mongolia
National Innovation System of Mongolia Academician Enkhtuvshin B. Mongolians are people with rich tradition of knowledge. When the Great Mongolian Empire was established in the heart of Asia, Chinggis
More informationInformal document WP.5 (2016) No. 9
Distr.: General 6 September 2016 English only Economic Commission for Europe Inland Transport Committee Working Party on Transport Trends and Economics Twenty-eight session Geneva, 5 7 September 2016 Item
More informationThe Sustainable Tourism Programme of the 10-Year Framework of Programmes on Sustainable Consumption and Production
The Sustainable Tourism Programme of the 10-Year Framework of Programmes on Sustainable Consumption and Production Generating collective impact Scaling up and replicating Programmatic implementation Helena
More informationAssessing the Implementation of the Small Business Act for Europe SME DEVELOPMENT STRATEGY OF GEORGIA
DRAFT AGENDA Launch event: SME POLICY INDEX: EASTERN PARTNER COUNTRIES 2016 Assessing the Implementation of the Small Business Act for Europe SME DEVELOPMENT STRATEGY OF GEORGIA 2016-2020 22 March 2016
More informationTERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project
Expressway Operations Improvement Project (TRTA SRI 50299) I. Background TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project 1. The
More informationAn Innovative Public Private Approach for a Technology Facilitation Mechanism (TFM)
Summary An Innovative Public Private Approach for a Technology Facilitation Mechanism (TFM) July 31, 2012 In response to paragraph 265 276 of the Rio+20 Outcome Document, this paper outlines an innovative
More informationEconomic and Social Council
United Nations Economic and Social Council Distr.: General 11 February 2013 Original: English Economic Commission for Europe Sixty-fifth session Geneva, 9 11 April 2013 Item 3 of the provisional agenda
More information(EC) ), 11(8) 347/ /2009, (EC)
ENTSOs consistent and interlinked electricity and gas model in accordance with Article 11(8) of Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 21 December 2016
More informationDIRECTION OF SCIENCE, TECHNOLOGY AND INNOVATION POLICY IN THAILAND
DIRECTION OF SCIENCE, TECHNOLOGY AND INNOVATION POLICY IN THAILAND By Mr. Pichet Durongkaveroj Secretary General, National Science Technology and Innovation Policy Office, Thailand 99 I SCIENCE, TECHNOLOGY
More informationAPSEC President s Report
2015/EWG49/008 Agenda Item: 5a APSEC President s Report Purpose: Information Submitted by: APSEC 49 th Energy Working Group Meeting Gyeongju, Korea 22 26 June 2015 Report on APEC Sustainable Energy Center
More informationRole of the World Bank in SME Development
Role of the World Bank in SME Development Ist National SME Conference, May 25, 2016 Lahore Presentation by: Gabi Afram, Program Leader, Equitable Growth, Finance and Institutions, World Bank WB Survey
More informationDraft executive summaries to target groups on industrial energy efficiency and material substitution in carbonintensive
Technology Executive Committee 29 August 2017 Fifteenth meeting Bonn, Germany, 12 15 September 2017 Draft executive summaries to target groups on industrial energy efficiency and material substitution
More informationMINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY
MINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY KENYA MARINE FISHERIES AND SOCIO-ECONOMIC DEVELOPMENT PROJECT (KEMFSED) TERMS OF REFERENCE For an Individual
More informationHorizon 2020 Towards a Common Strategic Framework for EU Research and Innovation Funding
Horizon 2020 Towards a Common Strategic Framework for EU Research and Innovation Funding Rudolf Strohmeier DG Research & Innovation The context: Europe 2020 strategy Objectives of smart, sustainable and
More informationNeeds for Diversified Financing Models for SMEs and the Policy Implications in Asia
Needs for Diversified Financing Models for SMEs and the Policy Implications in Asia ABAC Malaysia - SME Finance Forum Workshop on Innovative Financing for SMMEs Session 1: Moving Into the Mainstream 21
More informationDEPLOYING SPACE SCIENCE AND TECHNOLOGY FOR NATIONAL DEVELOPMENT Prof.R.A. Boroffice, OON TABLE OF CONTENTS
DEPLOYING SPACE SCIENCE AND TECHNOLOGY FOR NATIONAL DEVELOPMENT Prof.R.A. Boroffice, OON TABLE OF CONTENTS 3.1 Introduction 3.2 Space as a Platform for Development 3.2.1 Vision 2020 and Space Technology
More informationBhutan: Adapting to Climate Change through Integrated Water Resources Management
Completion Report Project Number: 46463-002 Technical Assistance Number: 8623 August 2017 Bhutan: Adapting to Climate Change through Integrated Water Resources Management This document is being disclosed
More informationChapter 11 Cooperation, Promotion and Enhancement of Trade Relations
Chapter 11 Cooperation, Promotion and Enhancement of Trade Relations Article 118: General Objective 1. The objective of this Chapter is to establish a framework and mechanisms for present and future development
More informationResearch and Innovation in Science and Technology Project (P121842)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Education Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 11-Dec-2018 ISR35076 Implementing Agencies: Ministry
More informationThe 21 st APEC Small and Medium Enterprises Ministerial Meeting Joint Ministerial Statement. Nanjing, China September 5, 2014
The 21 st APEC Small and Medium Enterprises Ministerial Meeting Joint Ministerial Statement Nanjing, China September 5, 2014 Innovation and Sustainability Introduction 1. We, the APEC Ministers and their
More informationConclusions concerning various issues related to the development of the European Research Area
COUNCIL OF THE EUROPEAN UNION Conclusions concerning various issues related to the development of the European Research Area The Council adopted the following conclusions: "THE COUNCIL OF THE EUROPEAN
More informationThe Policy Content and Process in an SDG Context: Objectives, Instruments, Capabilities and Stages
The Policy Content and Process in an SDG Context: Objectives, Instruments, Capabilities and Stages Ludovico Alcorta UNU-MERIT alcorta@merit.unu.edu www.merit.unu.edu Agenda Formulating STI policy STI policy/instrument
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the project Country: The Socialist Republic of Viet Nam Project: Hoa Lac Science and Technology City Development Project (II) Loan
More informationCommission proposal for Horizon Europe. #HorizonEU THE NEXT EU RESEARCH & INNOVATION PROGRAMME ( )
Commission proposal for Horizon Europe THE NEXT EU RESEARCH & INNOVATION PROGRAMME (2021 2027) #HorizonEU Jürgen Tiedje SPIRE PPP Brokerage Event 14 June 2018 Research and Innovation Horizon Europe is
More informationAPEC Internet and Digital Economy Roadmap
2017/CSOM/006 Agenda Item: 3 APEC Internet and Digital Economy Roadmap Purpose: Consideration Submitted by: AHSGIE Concluding Senior Officials Meeting Da Nang, Viet Nam 6-7 November 2017 INTRODUCTION APEC
More informationNasir, Dao PKM Abdul Partner PwC Legal (Vietnam) Co., Ltd
Nasir, Dao PKM Abdul Partner PwC Legal (Vietnam) Co., Ltd Get in touch Tel. (direct): +84 (8) 3824 0109 nasir.pkm@pwc.com Professional profile Nasir is a partner and the Legal Services Leader in Vietnam.
More informationThey all say it is about the economy. It is more than ratio s, percentages, and growth; it is about the Lives of people
They all say it is about the economy It is more than ratio s, percentages, and growth; it is about the Lives of people Let me share my version of that vision based on the belief that Curaçao Connects Communities
More information10246/10 EV/ek 1 DG C II
COUNCIL OF THE EUROPEAN UNION Brussels, 28 May 2010 10246/10 RECH 203 COMPET 177 OUTCOME OF PROCEEDINGS from: General Secretariat of the Council to: Delegations No. prev. doc.: 9451/10 RECH 173 COMPET
More informationCatherine Pattillo Assistant Director Strategy, Policy and Review Department, IMF. CSO Policy Forum Presentation, April 2016
Catherine Pattillo Assistant Director Strategy, Policy and Review Department, IMF CSO Policy Forum Presentation, April 2016 Addis Agenda Financing for Development (FfD) Follow Up FfD Follow up Forum (FFDF)
More informationU.S. Department of Treasury / USAID. Sustaining and Accelerating the Growth of Renewable Energy Markets in Southeast Asia: Lessons from the Field
U.S. Department of Treasury / USAID Sustaining and Accelerating the Growth of Renewable Energy Markets in Southeast Asia: Lessons from the Field Overview 7 June 2016, Tuesday, 9-10:30am 6 ADB Avenue, Mandaluyong
More informationFY18 CIF Business Plan and Budget (SUMMARY)
Joint CTF-SCF.17/3 May 23, 2017 Joint Meeting of the CTF and SCF Trust Fund Committees Washington, DC June 7, 2017 Agenda Item 3 FY18 CIF Business Plan and Budget (SUMMARY) PROPOSED DECISION The Joint
More informationAddenco ENERGY & COMMODITIES LAW FIRM. AddVANTE. ABOUT ADDENCO Who we are What we do Our clients Our group OUR SERVICES
Addenco ENERGY & COMMODITIES LAW FIRM A FIRM OF GROUP AddVANTE Over 15 of experience providing legal advice on all regulatory, contractual and financial aspects to companies and institutions in the energy
More informationCREDITING-RELATED READINESS ACTIVITIES UNDER THE PMR: UPDATE AND SUGGESTED NEXT STEPS
CREDITING-RELATED READINESS ACTIVITIES UNDER THE PMR: UPDATE AND SUGGESTED NEXT STEPS PMR Note PA12 2015-1 May 15, 2015 1 I. INTRODUCTION 1. The Partnership for Market Readiness (PMR) was established in
More informationGuidelines to Promote National Integrated Circuit Industry Development : Unofficial Translation
Guidelines to Promote National Integrated Circuit Industry Development : Unofficial Translation Ministry of Industry and Information Technology National Development and Reform Commission Ministry of Finance
More informationSIXTH REGIONAL 3R FORUM IN ASIA AND THE PACIFIC, AUGUST 2015, MALE, MALDIVES
Discussion paper issued without formal editing FOR PARTICIPANTS ONLY 13 AUGUST 2015 ENGLISH ONLY UNITED NATIONS CENTRE FOR REGIONAL DEVELOPMENT In collaboration with Ministry of Environment and Energy
More informationDraft Plan of Action Chair's Text Status 3 May 2008
Draft Plan of Action Chair's Text Status 3 May 2008 Explanation by the Chair of the Drafting Group on the Plan of Action of the 'Stakeholder' Column in the attached table Discussed Text - White background
More informationCOSME Financial Perspectives European programmes and funds to foster growth Madrid 30 October/Seville 31 October 2013
COSME 2014-2020 2014-2020 Financial Perspectives European programmes and funds to foster growth Madrid 30 October/Seville 31 October 2013 Vilmos Budavari European Commission DG Enterprise and Industry,
More informationInterim Report on the Heiligendamm Process at the G8 Summit in Hokkaido Toyako 7 to 9 July 2008
Interim Report on the Heiligendamm Process at the G8 Summit in Hokkaido Toyako 7 to 9 July 2008 Prepared by the Steering Committee of the Heiligendamm Process consisting of the personal representatives
More informationORDER OF THE PRESIDENT OF THE PEOPLE'S REPUBLIC OF CHINA
ORDER OF THE PRESIDENT OF THE PEOPLE'S REPUBLIC OF CHINA No. 68 The Law of the People's Republic of China on Promoting the Transformation of Scientific and Technological Achievements, adopted at the 19th
More informationEXECUTIVE SUMMARY. St. Louis Region Emerging Transportation Technology Strategic Plan. June East-West Gateway Council of Governments ICF
EXECUTIVE SUMMARY St. Louis Region Emerging Transportation Technology Strategic Plan June 2017 Prepared for East-West Gateway Council of Governments by ICF Introduction 1 ACKNOWLEDGEMENTS This document
More informationMinistry of Industry. Indonesia s 4 th Industrial Revolution. Making Indonesia 4.0. Benchmarking Implementasi Industri 4.0 A.T.
Ministry of Industry s 4 th Industrial Revolution Making 4.0 Benchmarking Implementasi Industri 4.0 A.T. Kearney Industry 4.0 initiative is the global trend in the manufacturing industry End of 18 th century
More informationRemarks by Mr. Sun Chengyong. Head of Delegation. Ministry of Science and Technology, China. May 15-16, 2017
Remarks by Mr. Sun Chengyong Head of Delegation Ministry of Science and Technology, China the 2 nd Annual Multi-Stakeholder Forum on Science, Technology and Innovation for Sustainable Development May 15-16,
More informationTo Undertake a Rapid Assessment of Fisheries and Aquaculture Information Management System (FIMS) in Kenya
Republic of Kenya MINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY KENYA MARINE FISHERIES AND SOCIO-ECONOMIC DEVELOPMENT PROJECT (KEMFSED) TERMS OF REFERENCE
More informationSupport R&D and Innovation in Portugal 2020
Support R&D and Innovation in Portugal 2020 Director of Regional Policy Unit Conceição Moreno Lisboa, 2014, October, 09 Portugal 2020 Growth based on knowledge and innovation - with priorities in the areas
More informationSMEs Development: Vietnamese Experience
SMEs Development: Vietnamese Experience Presenter: Dr. CAN Van Luc at the Conference on APEC s Post 2020 Agenda: Rising Protectionism, Economic Rebalancing and Diversified Growth Session 2: Micro Competitiveness,
More informationEVCA Strategic Priorities
EVCA Strategic Priorities EVCA Strategic Priorities The following document identifies the strategic priorities for the European Private Equity and Venture Capital Association (EVCA) over the next three
More informationFielding of Consultants 04 September November February July 2004
TECHNICAL ASSISTANCE COMPLETION REPORT Division: AFRM TA No. and Name TA: AFG 3875: Disaster Preparedness and Management Capacity Building Executing Agency: Source of Funding: TASF Department of Disaster
More informationPartnerships for the 2030 Agenda: Role of Science, Technology, and Innovation
Partnerships for the 2030 Agenda: Role of Science, Technology, and Innovation United Nations University October 18, 2018 Tokyo, Japan 0 Mahmoud Mohieldin Senior Vice President @wbg2030 worldbank.org/sdgs
More informationInnovative financing to promote SMEs
Innovative financing to promote SMEs Sameer Goyal Seoul Center for Financial Sector Development Finance and Markets Global Practice The World Bank Group, Republic of Korea Innovation Policy and Creative
More informationAnnotated Chapter Outline
Annotated Chapter Outline Chapter 1: Context, Scope and Approach 1. Context. Access-poverty-economy linkages, need for substantive scale-up, global movement SE4ALL, SDGs, etc. 2. Rationale. Complementary
More informationLatin-American non-state actor dialogue on Article 6 of the Paris Agreement
Latin-American non-state actor dialogue on Article 6 of the Paris Agreement Summary Report Organized by: Regional Collaboration Centre (RCC), Bogota 14 July 2016 Supported by: Background The Latin-American
More informationEIAH Feasibility Study for Investments Platforms in the Outermost Regions
EIAH Feasibility Study for Investments Platforms in the Outermost Regions Meeting with the Canary Islands Advisory Hub Financial Instruments Advisory Services Alain Kauffmann Agenda 1. Introduction 2.
More informationWhat We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012
What We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012 What We Heard Report: The Case for Change 1 Report of What We Heard: The Case for Change Consultation
More informationTechnology and Innovation - A Catalyst for Development
2017/ISOM/SYM/004 Session 1 Technology and Innovation - A Catalyst for Development Submitted by: Papua New Guinea Symposium on APEC 2018 Priorities Port Moresby, Papua New Guinea 5 December 2017 Technology
More informationCAPETANO OIL LIMITED (+233) (+233)
1 CAPETANO OIL LIMITED (+233) 202 027 485 (+233) 209 985 175 www.capetano.com info@capetano.com C90/24 Osu Badu Street, Airport Residential Area, Accra Ghana. 2017 Capetano Oil Limited. All rights reserved.
More informationJOINT CTF-SCF/TFC.15/3 November 2, Joint Meeting of the CTF and SCF Trust Fund Committees Washington, D.C. Monday, November 9, 2015
Joint Meeting of the CTF and SCF Trust Fund Committees Washington, D.C. Monday, November 9, 2015 JOINT CTF-SCF/TFC.15/3 November 2, 2015 Agenda Item 3 CLIMATE INVESTMENT FUNDS: ACCOMPLISHMENTS, TRANSFORMATIONAL
More informationNCRIS Capability 5.7: Population Health and Clinical Data Linkage
NCRIS Capability 5.7: Population Health and Clinical Data Linkage National Collaborative Research Infrastructure Strategy Issues Paper July 2007 Issues Paper Version 1: Population Health and Clinical Data
More information