1 CLOSEOUT REPORT Submitted by the AASHTO TIG Lead States Team for the following technology: Use of Self-Propelled Modular Transporters (SPMTs) to Remove & Install Bridges Lead States Team Members and Agencies: Tom Andres, Chair, Florida DOT Jugesh Kapur, Chair, Washington State DOT David Fish, Rhode Island DOT Hossein Ghara, Louisiana DOTD Jim McMinimee, formerly Utah DOT Keith Waugh, Leware Construction Company Bill Halsband, Sarens Group Bridge Consultant February 2010

2 DISCLAIMER The contents of this report reflect the views of the authors, who are responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official view or policies of the American Association of State Highways and Transportation Officials (AASHTO) or any individual member organization of AASHTO. Where the names of products or manufacturers appear herein, their inclusion is considered essential to the objectives of this report. AASHTO does not endorse products or manufacturers.

3 TABLE OF CONTENTS Page Introduction... 5 Marketing Activities... 6 Hosted Demonstration Workshops... 6 Presentations at Conferences and Meetings... 8 Publications Performance Measurement Transition Plan Reference Materials Technology Transfer Primary On-going Implementation Responsibility Other Planning Efforts for On-going Implementation Specific Future Actions On the Web Lessons Learned Effective Tools and Methods Unique Tools and Methods Ineffective Tools and Methods Final Expenditure Summary Appendix A: Kick-off Meeting Agenda Appendix B: Marketing Analysis Appendix C: Work Plan Appendix D: Performance Measures Appendix E: Communications Plan Appendix F: Budget Appendix G: Marketing Media... 33

4

5 CLOSEOUT REPORT Submitted by the AASHTO TIG Lead States Team for the following technology: Use of Self-Propelled Modular Transporters (SPMTs) to Remove & Install Bridges Introduction The Self-Propelled Modular Transporter (SPMT) Lead State Team (LST) was selected to promote the nationwide implementation of SPMT bridge moves. The use of SPMTs to move bridges is part of a larger effort to accelerate construction and minimize onsite construction time, thereby reducing user impacts. The LST held its kick-off meeting on July 26-27, See Appendix A for the kick-off meeting agenda. Outcomes from the meeting and follow-up conference calls were a market analysis (Appendix B), work plan (Appendix C), performance measures (Appendix D), communications plan (Appendix E), budget (Appendix F), and marketing media (Appendix G). The AASHTO TIG Executive Committee approved the proposed work plan and a budget of $75,000 at its September 27, 2007 meeting. Tasks of the LST have included development and distribution of a brochure, an introductory PowerPoint presentation, a best applications PowerPoint presentation with a number of application animations, website additions and updates, and presentations at various conferences and meetings across the country. This closeout report is divided into five sections: Marketing Activities Performance Measurement Transition Plan Lessons Learned Final Expenditure Summary 5

6 Marketing Activities SPMT Technology offers numerous marketing strengths due to the straightforward, demonstrable, easily comprehendible nature of its value proposition. Saving time, money (in terms of the costs of travel delay), and possibly lives, by removing older structures and replacing them in minutes or hours with new structures constructed offsite is an obvious improvement over conventional methods. The scale of such an operation creates a unique, made for TV moment that, if managed for maximum general public exposure, provides a rare opportunity to demonstrate in real time a transportation agency s use of innovation to maximize gain and minimize pain for highway users. Clever applications of the technology address a variety of structure construction challenges, further enhancing the technology s value. The visual, verifiable nature of SPMT bridge moves allows decision-makers to see beyond perceived cost and other barriers to the myriad benefits of adopting the technology, helping to enhance the potential for accelerating adoption. When a local politician can stand beside a typical taxpayer and share in the experience of awe and fascination generated by an SPMT bridge move in action, a unique opportunity exists, not only to improve a construction process, but also to build enthusiasm and trust between owner agency and taxpayer. See Appendix B for the marketing analysis done for this technology. Hosted Demonstration Workshops Location Utah DOT 4500 South Bridge over I-215E demonstration workshop with site visit, Salt Lake City, Utah * SPMT Live Demonstration at International Bridge Conference (IBC), Pittsburgh, Pennsylvania Utah DOT Lambs Canyon Bridge move informal site visits for State DOT reps, Salt Lake City, Utah Utah DOT East Canyon Bridge move informal site visits for State DOT reps, Salt Lake City, Utah Date Total Attendance 10/27/ /04/2008 > /9-10/ /16-17/2008-6

7 Location Utah DOT 3300 South over I- 215E bridge move informal site visits for State DOT reps, Salt Lake City, Utah Date Total Attendance 08/23/ * See Highways for LIFE (HfL) Final Report entitled Rapid Removal and Replacement of the 4500 South Bridge over I-215 in Salt Lake City, April 2009, at Utah DOT Demonstration Workshop and Site Visits: The LST thanks the HfL Program for sponsoring the 10/27/2007 Utah DOT 4500 South Bridge over I- 215E demonstration workshop with site visit. From the 4500 South Bridge report on the HfL website cited above: On Saturday morning, participants observed the new prefabricated bridge superstructure located near the existing bridge. In addition, they witnessed the SPMT lifting and moving the existing two-span superstructure of the 4500 South Bridge to a demolition area alongside I-215. It took the SPMT two trips (one for each span) to complete the removal of the superstructure. The remaining time on Saturday was spent removing the rubblized materials and preparing the abutments for placement of the new superstructure on Sunday morning. At 1 p.m. Saturday, the workshop portion of the showcase began at a nearby location (see workshop agenda in Appendix B). About 150 participants attended the workshop, which consisted of presentations on the design, construction, removal, and replacement of the bridge by representatives of UDOT, FHWA, the design consultant, and the contractor On Sunday morning, an SPMT was used to lift and move the new superstructure to its final destination. In addition to showcase participants, many members of the public and representatives from local and national news outlets witnessed the bridge move UDOT considered the removal and replacement of the 4500 South Bridge using ABC techniques a great success. By using an SPMT, UDOT was able to remove and replace the 4500 South Bridge in one weekend, reducing construction time, minimizing inconvenience to the traveling public, and improving worker and motorist safety while maintaining normal traffic flow. UDOT undertook an aggressive, comprehensive effort to communicate with residents and businesses near the bridge, keeping them abreast of activities during pre- and post-construction phases of the project. A user satisfaction survey clearly demonstrated the satisfaction of the neighboring residents and businesses with the project approach and final product. 7

8 In general the state representatives in attendance that UDOT talked with were very impressed by the technology, and talked about how they would try to find applicable projects. Records are not available for attendance at UDOT s informal site visits during bridge moves. One source reported that 16 different states had visited at least one of the moves; no records exist for which states, beyond the HfL Final Report on the October 2007 move. IBC Live Demonstration. The live SPMT hardware demonstration at the 2008 International Bridge Conference was a great success. Two units were onsite, one from Barnhart and one from Mammoet. The Barnhart and Mammoet representatives operated the computer-controlled units, and allowed many IBC attendees the opportunity to actually drive the units. Thanks are extended to the International Bridge Conference and Mammoet and Barnhart for supporting this demonstration. Presentations at Conferences and Meetings Conference or Meeting Name, Location Maine Highways for LIFE Project Open House, Bangor, Maine FHWA Seismic ABC Workshop, San Diego, California NSBA World Steel Bridge Symposium, New Orleans, Louisiana TRB Annual Meeting, Washington, DC Missouri DOT Office Meeting, Jefferson City, Missouri FHWA ABC HfL Conference, Baltimore, Maryland Date Presenter Name, Organization 08/13/ /11/ /05/ /13-17/ /26/ /19/2008 Jim McMinimee, UDOT Tom Andres, FDOT Jim McMinimee, UDOT Jim McMinimee, UDOT Jugesh Kapur, WSDOT Jim McMinimee, UDOT 8

9 Conference or Meeting Name, Location AASHTO Standing Committee on Highways (SCOH) Spring Meeting, Branson, Missouri AASHTO Subcommittee on Bridges & Structures Annual Meeting, Omaha, Nebraska FHWA ABC Workshop at International Bridge Conference, Pittsburgh, Pennsylvania Date 05/5-6/ /18-22/ /04/2008 WASHTO-x Video Conference 06/17/2008 National Highway Institute (NHI) Real Solutions Webinar on SPMT bridge moves AASHTO Subcommittee on Construction Annual Meeting, San Antonio, Texas Iowa DOT ABC Workshop, Des Moines, Iowa New Hampshire DOT ABC Seminar, Concord, New Hampshire Idaho DOT Bridge and Public Affairs Offices Meeting, Idaho UDOT ABC Phase II Preliminary Development Workshop, Salt Lake City, Utah 06/25/ /06/ /11-12/ /03/ /08/ /17/2008 Presenter Name, Organization Jim McMinimee, UDOT Jim McMinimee, UDOT General Session) T-4 Construction Jim McMinimee, UDOT Jugesh Kapur, WSDOT Jim McMinimee, UDOT Jim McMinimee, UDOT Jim McMinimee, UDOT Jim McMinimee, UDOT, sponsor 9

10 Conference or Meeting Name, Location WSDOT ABC Workshop, Olympia, Washington PCI National Bridge Conference, Orlando, Florida (co-authored paper) 15 th Annual Caltrans / PCMAC Bridge Seminar, Sacramento, California District DOT Bridge and Project Development Offices Meeting, Washington, DC Georgia Partnership for Transportation Quality (GPTQ) Workshop, Athens, Georgia ABC Session at TRB Annual Meeting, Washington, DC National Concrete Consortium (NCC) Meeting, San Antonio, Texas FHWA/NYSDOT ABC Seminar, Albany, New York ASCE/SEI Structures Congress, Austin, Texas FHWA ABC Workshop at International Bridge Conference, Pittsburgh, Pennsylvania RIDOT ABC/PBES Seminar, Providence, Rhode Island MTDOT ABC/Value Analysis Constructability Workshop, Helena, Montana Date 09/30/ /06/ /15/ /4-5/ /19/ /11/ /01/ /21/ /01/ /16/ /16/ /23/2009 Presenter Name, Organization Jugesh Kapur, WSDOT Jim McMinimee, UDOT Jim McMinimee, UDOT Jim McMinimee, UDOT Jim McMinimee, UDOT 10

11 Conference or Meeting Name, Location University of Buffalo Graduate Course CIE 580, Emerging Technologies in Bridge Engineering, Buffalo, New York SPMT Bridge Moves Session at FHWA Bridge Engineering Conference, Orlando, Florida 6 th US-Taiwan Workshop, Seattle, Washington University of Buffalo Graduate Course CIE 580, Emerging Technologies in Bridge Engineering, Buffalo, New York Date 03/01/ /03/ /01/ /15/2010 Presenter Name, Organization Hossein Ghara, LaDOTD Jim McMinimee, UDOT Hossein Ghara, LaDOTD Presentation attendees are typically awed by how quickly SPMTs can move bridge spans. They also typically express concerns about perceived additional costs for using this technology. Publications (Publications listed should include any production of the lead states team which was distributed to or made available for viewing by prospective users of the technology. Typically these may include brochures, posters, video productions, facts sheets, and similar informational pieces. Workshop announcements and similar invitations do not need to be listed or attached in the appendices.) In addition to the publications listed below, Jim McMinimee was recognized by the Engineering News-Record (ENR) as one of the Top 25 Newsmakers in 2009 for accelerating the pace of bridge construction by using self-propelled modular transporters on Utah projects. Publication Type Total Produced Recipients and Distribution Method AASHTO TIG SPMT Brochure ** ~ 500 Presented at conferences & meetings; posted on AASHTO TIG SPMT website 11

12 Publication Type Total Produced Recipients and Distribution Method Letters to AASHTO Presidents ** 2 Best Application Animations 5 Jim McMinimee hand delivered first letter to Pete Rahn at 2007 AASHTO Annual Meeting & mailed second letter offering a briefing; also mailed letter to Victor Mendez Presented at conferences & meetings; posted on AASHTO TIG SPMT website Utah DOT supplementary animations M.L. Ralls, Accelerated Construction, Roads & Bridges, March 2009, pp J. McMinimee, M.L. Ralls, Accelerated Bridge Construction Designing for Contractors, Editorial, Structures Magazine, September 2009 > Various conferences & meetings Roads & Bridges distribution list Structures Magazine distribution list J. McMinimee, Utah Plays Leading Role in Accelerated Bridge Construction, Innovator, Federal Highway Administration, April/May 2008 J. McMinimee, The ABCs of a Rapid Bridge Replacement in Utah, FOCUS, Federal Highway Administration, December 2007 ** See Appendix G for copies. - Innovator distribution list - FOCUS distribution list Performance Measurement (Describe the degree of success obtained using the performance assessment methods described in the performance measurement section of the approved marketing plan.) The following table compares responses to the initial and after-action technology experience surveys. See also Appendix D. 12

13 While the total numbers of responses for the initial and closeout surveys are similar, of the 52 sent out each time, 28 responded to both, 7 responded to the initial survey only, 8 responded to the final survey only, and 9 did not respond to either survey. Also, the initial vs. after-action responses in some cases contradicted themselves, and in other cases LST members know that the responses are not correct. Therefore, the survey results alone are of limited value. The numbers in parentheses in the table below represent the additional information known to the LST members. Survey Information Initial Survey After-action Survey # of survey recipient organizations # of survey responses received # of agencies claiming limited or no knowledge of this technology # of agencies fairly familiar with technology but have not yet tried it # of agencies currently in the process of trying this technology on experimental basis # of agencies currently using this technology on a routine or standard basis # of agencies who do not believe that this technology will provide substantial benefit # of agencies who have tried this technology and do not plan to use it in the future (7) 4 (13)

14 Transition Plan Reference Materials (Provide a list of the most beneficial reference materials pertinent to this technology.) Reference Publisher URL (if available on web) TIG SPMT website (being transferred to FHWA SPMT website) FHWA SPMT bridge moves website (importing TIG website materials) Prefabricated bridge projects website Manual on Use of SPMTs to Remove & Replace Bridges, June 2007 Case Study of Lewis & Clark Bridge deck replacement with SPMTs UDOT ABC website AASHTO TIG FHWA FHWA FHWA FHWA Utah DOT SelfPropelledModularTransporters.aspx Currently under development cts.cfm cfm :::1:T,V:1991, Technology Transfer (Name and contact information for the primary FHWA office to become the on-going contact for technology transfer for this technology.) Contact Claude Napier Office Name, Location FHWA Resource Center Phone claude.napier@dot.gov 14

15 Primary On-going Implementation Responsibility (Name and contact information for the technical committee/group/association to assume primary responsibility for continuing implementation of this technology.) Contact Committee Name, Organization Phone Shoukry Elnahal Chair, AASHTO Subcommittee on Bridges & Structures Technical Committee for Construction (T-4) Other Planning Efforts for On-going Implementation (Identification of technical committees/groups/associations that have been contacted by the lead states team about assuming a future responsibility involving this technology, and the response received from each organization.) Contact Claude Napier, leader, EDC ABC/PBES Implementation Team Shoukry Elnahal, Chair, AASHTO T-4 Committee Name, Organization FHWA Resource Center AASHTO Subcommittee on Bridges & Structures Technical Committee for Construction, T-4 Responsibility Discussed and Response Moving TIG SPMT website materials to FHWA s new Every Day Counts Accelerated Bridge Construction (ABC) website under the Structural Placement Methods: SPMTs category; Claude has agreed, and the LST has given him the materials for posting Since one of T-4 s charges is ABC, Shoukry was asked to consider, in T-4 committee deliberations, the use of SPMTs to move bridges as one of the ABC tools as appropriate for the site; Shoukry has agreed to include SPMTs as one of the ABC tools in T-4 activity 15

16 Specific Future Actions (If there are specific future implementation activities foreseen as desirable or necessary, list that information here.) Future Activity Moving TIG SPMT website contents to FHWA s new SPMT website Posting SPMT bridge move project examples on the website, including contract documents & specifications Time Frame Currently being done Ongoing activity to post SPMT bridge move projects on FHWA prefabricated bridges website Recommended Organization to Perform FHWA Every Day Counts ABC/PBES Implementation Team FHWA Every Day Counts ABC/PBES Implementation Team On the Web (If a web site has been identified where later information on this technology can best be obtained, list the url.) 1. FHWA Every Day Counts (EDC) new SPMT website (currently under development) 2. FHWA prefabricated bridge projects website: Lessons Learned Effective Tools and Methods (From the viewpoint of your lead states team, which were the most effective marketing tools and methods they used, and why were they believed to be the most effective.) The most effective marketing tool was the demonstrations of the SPMT capabilities. These were effective because they allowed stakeholders to kick the tires and gain comfort with the technology by seeing it in action. Presentations that showed photos, or preferably video, of bridge moves using SPMTs were also effective and a much less expensive way to increase awareness and understanding of the technology. Utah DOT learned that taking their contracting industry (designers and construction contractors) on scanning tours to SPMT projects in other states was a highly effective marketing and implementation tool. 16

17 Partnership with FHWA is critical to the success of implementation of this technology. In addition, the LST would have benefited from partnering more with industry, e.g., Associated General Contractors (AGC) and construction contractors in general. The use of public events during bridge moves gains local support and generates positive media coverage of the moves. It may be difficult to measure the specific impact of these activities, but undoubtedly the opportunity to attract significant positive media coverage and firsthand public exposure for a transportation agency s use of technology that saves time, money and lives add to the impetus for adoption. Unique Tools and Methods (List any particularly creative or unique elements or methods used by your lead states team that other lead states teams should consider using.) Time-lapse videos of SPMT bridge moves was very effective in showing the speed and flexibility that can be achieved onsite using SPMTs for bridge moves. The various application animations were created to provide a visual understanding of the potential ways SPMTs can be used to remove and install bridges. These were presented at conferences and meetings, and also posted on the website. Ineffective Tools and Methods (From the viewpoint of your lead states team, which tools and methods were much less productive than desired, and provide your team s recommendations concerning future use of these methods or activities.) The SPMT TIG Lead State Team (LST) struggled to follow the established work plan because it did not continue to effectively communicate via meetings and conference calls as was done initially. LST members were able to continue their individual SPMT promotion activities, but this was not as effective as would have been possible if the LST had continued to function as a unit. LST members should be selected based on their motivation to implement the technology in their States in conjunction with their expertise in that technology. They must also have their agencies and managers support for working on the LST tasks and their commitment to provide assistance as needed. Also, the initial and after-action surveys were of limited value. Different states responded to each, some responses from states contradicted their other responses, and LST members have information that conflicts with some responses. 17

18 Final Expenditure Summary (Provide an estimate of the final total of expenses (to AASHTO TIG) which were incurred in executing the entire marketing plan.) Expenses for the SPMT Bridge Moves Lead States Team activities, through closeout, total $42,978. See Appendix F. 18

19 Appendix A: Kick-off Meeting Agenda Florida Department of Transportation Burns Building Room 315 (Third Floor) Tallahassee, Florida July 26-27, 2007 AASHTO Coordinator: Monica Worth Facilitator/Moderator: Mary Lou Ralls July 26; 8:00 A.M. to 4:00 P.M. Meeting Overview (8:00 9:00) Welcome (Ananth Prasad, Chief Engineer Florida DOT/AASHTO TIG Chair) Self Introductions (including experience with technology) (Team) Agenda Review and Goals of the Meeting (Thomas Andres, Lead State Team Chair/Worth for AASHTO) Overview of the LST Guidebook (Ralls) Background on Other TIG projects (Worth) Overview of the Marketing Plan Development Process (Worth) Brainstorming (9:00 12:00) Background on use of SPMTs to move bridges (Ralls) (9:00-9:30) o Presentation o TIG survey results Why SPMT, Why Now? (Andres/Worth/Ralls) (9:30-11:00) o Discussion of the benefits of SPMTs (Team) Owners perspective Industry s perspective o Who else wants SPMTs Now? (Team) Potential Partners Why not SPMTs Now? (Andres/Worth/Ralls) (11:00-12:00) o Discussion of barriers to adoption (Team) Owners perspective Industry s perspective 19

20 Lunch (12:00 1:00 p.m.) Marketing Plan Goals /Audience/Message (Worth) (1:00 4:00) General Goals o What are we trying to accomplish? Audience Identification o Who do we need to reach and convince in order to do that? Where do they get their information? (Forums/Info Sources) How do they get their information? (Promotional Tools/Media) Message Development o What do they need to learn to adopt the use of SPMTs to move bridges? High Value Goals & Actions o Focus Session: How can we most meaningfully move the needle on adoption of this technology within 1-3 years? July 27; 8:00 A.M. to 12:00 P.M. Review Day One Marketing Plan Input/Decisions (8:00-8:30) (Andres/Worth/Ralls) Revisions and/or additions Additional Marketing Plan Input (Worth) (8:30 11:30) Develop Performance Measurement Plan Develop Schedule/Milestones, including LST leads Develop First Draft of Budget Meeting Wrap Up/Review (Andres/Ralls) (11:30 12:00) Setup Team meeting schedule o Follow-Up Conference Calls Adjourn 20

21 Appendix B: Marketing Analysis What is the need for this technology? The Federal Highway Administration (FHWA) has identified reducing construction related impacts to the traveling public as a major priority for the nation s highway program. Get in, do it right, get out, and stay out has become a rallying cry for implementing new technologies that accelerate construction, minimize negative impacts on motorists, and improve worker and motorist safety. Self-propelled modular transporter (SPMT) technology addresses each of these critical needs by providing a means of moving whole bridge structures into and out of place on busy roadways in just minutes or hours, while capitalizing on the use of offsite or nearby prefabrication of new structures to improve the quality of the finished product and enhance the safety of workers. The use of SPMTs provides ultimate flexibility and speed in removing old and installing new bridge structures. In short, the use of SPMTs may: Significantly reduce traffic disruption Restore use of existing highways to traffic in significantly less time Improve work-zone safety Improve constructability Lower life cycle costs SPMT technology accomplishes these high value benefits via several avenues. During conventional bridge construction, traffic is typically moved from under the structure during certain types of activity to protect motorist and worker safety. Such tasks, impacts, and methods of moving traffic include: Conventional Bridge Construction Work Operation Duration Traffic Control Method Bridge Demolition 2-3 days Detour Beam Placement 45 minutes per beam Rolling road block or detour Form Placement Varies Lane shifts/closure Deck Concrete Placement 1-2 days per span Lane shifts/closure SPMTs can decrease the duration of traditional construction impacts from days or months to just a few hours. Rapid Demolition: Because SPMT s can support and maneuver large structures, many spans can be freed from their current positions, lowered and moved offsite very rapidly. The impact of removing an entire bridge span can, in some cases, be reduced from a detour lasting several days to a single 45-minute rolling roadblock. Safer and More Efficient Construction: Bridge construction with the aid of an SPMT yields similar benefits. Typically, the construction of a bridge requires multiple traffic interruptions during such activities as beam erection, deck forming, and deck 21

22 concrete placement. These work operations may require lane shifts/closures or rolling road blocks that are often limited to off-peak hours, which disrupts the flow and efficiency of the contractor s work. Placing multiple beams requires multiple closures. SPMT s, on the other hand, have been used to move entire bridge spans into place in a matter of hours. It may even be possible to place a span on shim stacks near its final location using only 45-minute road blocks, with final adjustments made through the use of jacks. Reduced Onsite Construction Time: Using SPMTs to remove and install bridges offers the shortest possible onsite construction time. Near-site fabrication of the bridge span(s) allows for simultaneous construction of both the superstructure and substructure. Disruption to traffic can be decreased from months to just minutes or hours. Less onsite construction time results in improved work-zone safety for construction crews and motorists alike (more than 85% of those killed in work zone accidents are motorists). And, public perception of both an agency and its contractor can be improved when the use of SPMT s demonstrates the deployment of innovative technology to reduce construction time. Improved Quality of Construction: The use of SPMT s allows bridges to be built in the controlled environment of a nearby staging area, allowing the focus to remain solely on construction rather than the need to accommodate traffic. This and a variety of other benefits of the controlled environment leads to improvements in the overall quality of the finished product. Improved Worker and Motorist Safety: SPMT technology allows construction crews to work in a staging area away from traffic, improving the safety of the work environment and reducing the exposure of motorists to a roadway work zone. Significant worker safety benefits are also derived from the ability to work during the day and near ground level throughout the prefabrication process. Increased Contractor and Owner Options: SPMT technology fuels flexibility in choosing staging areas, which can be located well away from the final bridge location, depending upon accessibility. Driving the structure into place eliminates many issues related to overhead height restrictions that impact crane lifting operations, while the supported SPMT loads provide added safety assurance relative to suspended crane loads. Offsite staging allows the contractor to work during the day and extend work hours as needed in a safer environment. Since onsite foundation and substructure work can be performed concurrent with fabrication of the superstructure at a site nearby, great savings in total construction time can be realized. SPMT s can also be used to relocate existing spans onto new foundations to accommodate mainline widening or new interchange configurations. Finally, mom and pop construction companies can use this technology as readily as larger companies because SPMT vendors provide engineering services that assist contractors with issues related to the use of the technology. Project and User Cost Savings: Despite significant mobilization costs, substantial offset savings can be gained through the use of SPMTs. Fewer maintenance-of-traffic setups, shorter hours for law enforcement officers due to fewer rolling roadblocks, time savings from fewer shift changes for construction crews, the elimination of temporarydetour construction and repair of long-term detours on existing roads, the use of smaller owner and contractor crews, reduced onsite time required for owner agency engineering and inspection requirements due to accelerated construction, a vast reduction in the 22

23 myriad user costs associated with construction-related delay, detour, and congestion, and less maintenance and repair costs associated with better long-term performance of the prefabricated structure are among cost savings factors. Contractors realize particular savings, which include lower insurance premiums, increased volume of projects due to the speed of construction and installation, reduced manpower and equipment costs and reduced equipment rental time, among others. Who are the broad target audiences for the LST? Indicate the organizations that may benefit considerably from use of this technology. Agency State Agencies Local Agencies/MPO s/toll Authorities Contractors Consultants (ACEC and state/local) General Public Primary Target Secondary Target Who are the decision makers in the primarily targeted agencies? State Agencies Local Agencies Agency MPO s Toll Authorities Contractors, General and Bridge Consultants, National/Local and Bridge Decision-making Office Secretary Chief Engineer State Bridge/Construction Engineer State Project Manager District Engineer/Chief (proj. owners) Design/Planning/Constr./Bridge Staff State DOT Dist. Engineers Local Agency Chief Engineer Executive Director Executive Director Owner/CEO Project Engineers and Designers 23

24 What information will decision makers want to know to reach a conclusion about trying or adopting this technology? Interest Level Information Critical Desirable State Agencies Secretary/Executive Directors/Chief Engineers 1. Minimize disruption 2. Faster delivery (econ. benefit to State) 3. Scope of successful SPMT use 4. Cost factors/user costs 5. Public opinion re: minimum disruption State Bridge/Construction Engineers/Project Managers All of the above, plus 6. Constructability 7. Technical Detail 8. Contract/Bid Strategies 9. Simplicity of application District Engineers All of the above, plus 10. Best applications guidance Contractors All of the above, plus Cost factors (+ quick estimates available from vendors; useful in bid process Future use/trend Resources available through TIG/LST Simplicity of operation/application Consultants All of the above General Public Less disruption Economic benefits (motorists/business) Decision drivers (Why SPMT?) 24

25 What are actual and perceived barriers to be overcome to do a trial or to adopt this technology as a standard? Barrier Mobilization cost Availability of equipment Effective bid specification language Effective contract language Agency stovepiping between divisons/programs/functions Agency staff orientation, training, and preparation New technology comes to owner agencies late, without adequate detail Bridge engineers require detailed specification, regardless of relative simplicity of SPMT operations. Engineering detail must remain a priority throughout the planning/design/construction process, with SPMT plan addressing all these details. Owner agencies getting involved with means and methods Contractors moving away from means and methods specification toward performance contracting Contractors resist sharing profit with vendor, reducing profit by hiring vendor Contractor issues re: the way prefabrication is planned, from staging to cash flow Materials issues related to definition of prefabrication and cast-in-place; process issues governing these two procedures Room required to stage in a congested environment Size of project (i.e., too small) Contractors are outfitted with traditional crews & equipment that will do the job (cranes, etc.) SPMT is a proprietary product SPMT is more technical than traditional equipment; but this presents fewer barriers than might be perceived. Risk is greater with SPMT Type Actual Perceived 25

26 What marketing opportunities already exist? Opportunity Dates NSBA World Steel Bridge December 4-7, 2007 Symposium, New Orleans, LA Transportation Research Board (TRB) Annual Meeting, January 13-17, 2008 Washington, DC FHWA Accelerated Bridge Construction March 20-21, 2008 Conference/Highways for LIFE, Baltimore, MD NCBC Concrete Bridge May 4-8, 2008 Conference, St. Louis, MO AASHTO Highway Subcommittee on Bridges & Structures Annual May 18-22, 2008 Meeting, Omaha, NE International Bridge Conference, June 2-4, 2008 Pittsburgh, PA 6 th National Seismic Conference on Bridges & Highways, Charleston, July 27-30, 2008 SC PCI National Bridge Conference October 5-8, 2008 Who are our potential partners in marketing this technology? AGC/ARTBA Potential Partner FHWA HQ and Divisions DOTs: Contractors/Consultants Other Associations ACEC National Steel Bridge Alliance (NSBA) National Concrete Bridge Council (NCBC) Possible Supporting Activities Liaison/Intel re: industry realities/outreach to members Technical expertise and stakeholder outreach Case histories and stakeholder outreach Case histories and industry stakeholder outreach Liaison/Intel re: industry realities/outreach to members Liaison/Intel re: industry realities/outreach to members Liaison/Intel re: industry realities/outreach to members 26

27 Appendix C: Work Plan Task # Task Description Outcomes 1 Assist state agencies in achieving two or more SPMT projects continually in the pipeline 1.1 Contact States that did not respond to initial survey for their input. Contact States that responded as needed for clarification. 1.2 Develop marketing materials for all target audiences (brochure, PPT, website content, etc.) Gave numerous presentations. Developed brochure; introductory PowerPoint presentation; best applications PowerPoint presentation with various application animations; various website content 1.3.a 1.3.b Identify pool of target State agencies (by survey response, existing use, existing relationships/knowledge of LST and allies, geography, size of bridge program). Reach out to three States, who have plans to introduce SPMT. Draft letter to initiate contact. Continue outreach to those who want more info. Candidates per survey: DC, NH, WI (have plans to implement); DE, ID, MO, NM, NV, VT, WV (want more info); plus, as needed (per LST intel: CA, FL, GA, IL, LA, OH, OR, NY, PA, RI, UT, WA) Jim McMinimee and Jugesh Kapur visited the Missouri DOT s office in Jefferson City on 2/28/08 to promote the use of SPMTs in Missouri s upcoming and extensive bridge rehabilitation and replacement program. They met with Dennis Heckman, Missouri s State Bridge Engineer and key members of his design and construction staff. Jugesh presented the Lewis and Clark Bride deck replacement project that had been completed successfully with SPMTs in Washington State and answered questions from the audience. In the latter half of 2009, Jugesh Kapur was contacted by Matt Farrar, Idaho s State Bridge Engineer regarding a steel truss rehabilitation project coming up in Idaho. Matt wanted to learn from Washington DOT s successful application of SPMTs in the deck replacement project of the Lewis and Clark steel truss bridge. Jugesh discussed the details with Matt and also shared with him the specifications used by Washington DOT that encouraged use of SPMTs and prompted the 27

28 Task # Task Description Outcomes contractor to accelerate the overall project schedule. 1.4a Convene LST Working Group to address barrier to adoption: Best Applications 1.4b Convene LST Working Group to address barrier to adoption: Bid/Contract Issues 1.5 Reach target agencies with opportunity to receive personalized tech assistance in strengthening State s SPMT program (personal outreach by LST peers and presentations at relevant events) Developed best applications PowerPoint presentation and five application animations; posted on website The team is compiling project-specific contract drawings and specifications and submitting to FHWA for posting on the new FHWA SPMT website See listing of presentations and responses to #1.3 above 1.6 Secure commitment to work with TIG LST toward goal of two or more SPMT projects in pipeline continually 1.7 Assign LST members to work with each State prospect for Task 1, design implementation plans, and launch these partnerships 1.8 Cultivate two incoming AASHTO Presidents for support of TIG SPMT effort, as part of accelerated construction priorities. Prepare a hand-out for possible presentation to Rahn at TRB; Prep web-based briefing for interested States. Invitations to Rahn and John Horsley. LST letter hand-delivered by Jim McMinimee to incoming AASHTO President Pete Rahn at 2007 AASHTO Annual Meeting; second letter mailed to Rahn, offered a briefing; also, letter mailed to Victor Mendez(see Appendix G) 2 Solicit State agencies to tap FHWA Innovative Bridge Research & Deployment (IBRD) funds to compel a first use of SPMT technology 2.1 Identify pool of potential adopters who can be moved to apply for IBRD funds. Candidates per survey: DC, NH, WI (have plans to implement SPMT); DE, ID, MO, NM, NV, VT, WV (want more info on SPMTs); CO, CT, DC, IN, MA, MD, MI, NJ, T, VA, (urban 28

29 Task # Task Description Outcomes populous States) 2.2 Reach target agencies to educate and assist with IBRD process (personal outreach and presentations at relevant events) See listing of presentations and #1.3 above 2.3 Assign LST members to work with potential adopters and implement technical assistance 3 Solicit local agencies/mpos/toll facilities to tap LTAP/TTAP/IBRD/HfL programs to compel a first use of SPMT technology 4 Disseminate information and guidance to Contractors to overcome barriers to SPMT adoption 5 Increase general public awareness of SPMT technology in use by State/local agencies and organizations. 6 Disseminate information and guidance about SPMT technology to consultants. 7 Prepare and Submit Closeout Report 29

30 Appendix D: Performance Measures (List the methods that your lead states team has determined appropriate for measuring performance output and outcome. The first three performance measures are standard for all lead states teams of the AASHTO TIG. See chapters 3, 5, and 6 of the guidebook for additional information about performance measures.) Performance Measure Measurement Method Performance Outcome Number of agencies that have adopted the technology as a requirement, option, or alternate as of the date of the closeout report, relative to the number since initiation of the lead states team. Number of agencies that are planning to adopt the technology as a requirement, option, or alternate as of the date of the closeout report, relative to the number since initiation of the lead states team. Number of agencies that have tried the technology for the first time as of the date of the closeout report, relative to the number since initiation of the lead states team. Number of SPMT programs per State agency: Number of State agencies tapping FHWA IBRD program to compel a first use of SPMT technology Number of Local agencies/mpo s/toll facilities compelling a first Initial and final surveys of all AASHTO agencies. Initial and final surveys of all AASHTO agencies. Initial and final surveys of all AASHTO agencies. 10 States achieve 2 or more SPMT projects continually in the pipeline 5 States applying to IBRD for funds to compel a first use of SPMT 5 local agencies/organizations applying to relevant 8 initial; 9 final 15 initial; 16 final 3 (7)* initial; 4 (13)* final 0 initial; 1 (3)* final

31 Performance Measure Measurement Method Performance Outcome use of SPMT technology (through LTAP/TTAP/IBRD/HfL) assistance programs to compel a first use of SPMT Level of general public awareness of SPMT technology in use by State/Local agencies/organizations. Disseminate information and guidance about SPMT use and trends to contractors to overcome barriers to adoption. 3 press events/incidents of coverage in agencies/organizations working with LST to increase or compel first use of SPMT 4 outreach initiatives (mailings, presentations, trade articles) Very favorable public response to UDOT bridge move events. First move covered nationally by CNN; 22 of UDOT bridge moves covered locally/regionally, generating support from highest levels of UDOT for increase in use of the technology. - - Disseminate information and guidance about SPMT use and trends to consultants to familiarize them with related agency needs and opportunities. 4 outreach initiatives (mailings, presentations, trade articles) * The numbers in parentheses represent the additional information known to the LST members. - 31

32 Appendix E: Communications Plan (A comprehensive listing of transportation agencies, manufacturers, suppliers, and other affected organizations that the team currently plans to communicate with during the marketing effort, including the purpose of the communications Include the office to be contacted when known.) Communication Method(s) Purpose Targets State Agency Secretary /Executive Director Agency Chief Engineer State Bridge /Construction Engineer/s State Project Managers Agency District Engineer /Chief (project owners) State and Local Agency Design /Planning /Constr. /Bridge Staff MPO Executive Director Toll Authority Executive Director Contractor Owner/CEO Consultant Project Engineers and Designers Letter, Brochure Letter, , Brochure, Demo /Workshop /Showcase PPT Presentation, , Brochure, Demo /Workshop /Showcase, Web Content PPT Presentation, , Brochure, Demo /Workshop /Showcase, Web Content PPT Presentation, , Brochure, Demo /Workshop /Showcase, Web Content PPT Presentation, , Brochure, Demo /Workshop /Showcase, Web Content PPT Presentation, , Brochure, Product Demo, Web Content PPT Presentation, , Brochure, Demo /Workshop /Showcase, Web Content PPT Presentation, , Brochure, Demo /Workshop /Showcase, Editorial Content, Web Content PPT Presentation, , Brochure, Demo /Workshop /Showcase, Editorial Content, Web Content Awareness; education; build commitment to spec SPMT and participate in TIG LST technology assistance program Awareness; education, build commitment to spec SPMT and participate in TIG LST technology assistance program; provide resources to colleagues at all relevant levels of agency; provide ongoing technical resources to prepare agency to spec successfully. Awareness, education, build buy-in to spec SPMT and participate in TIG LST technology assistance program; provide ongoing technical resources and training to prepare agency to spec successfully. Awareness, education, build buy-in to spec SPMT and participate in TIG LST technology assistance program; provide ongoing technical resources and training to prepare agency to spec successfully. Awareness, education, build buy-in to spec SPMT and participate in TIG LST technology assistance program; provide ongoing technical resources and training to prepare agency to spec successfully. Awareness, education, build buy-in to spec SPMT and participate in TIG LST technology assistance program; provide ongoing technical resources and training to prepare agency to spec successfully. Awareness; education; build commitment to spec SPMT and participate in TIG LST technology assistance program Awareness; education; build commitment to spec SPMT and participate in TIG LST technology assistance program Awareness; education; build commitment to use and spec SPMT Awareness; education; build commitment to incorporate and spec SPMT in appropriate projects 32

33 Appendix F: Budget (See attached Excel spreadsheet for budget.) Appendix G: Marketing Media 1) Brochure (see attached pdf) 2) PowerPoint Presentations (see attached pdfs): Introduction to SPMT Bridge Moves Best Applications for SPMT Bridge Moves 3) Initial Letter to AASHTO President dated 09/26/2007 (see below) 4) Letter to AASHTO President offering a briefing dated 11/07/2007 (see below) 33

34 Initial Letter to AASHTO President: September 26, 2007 Mr. Pete Rahn, Director Missouri DOT Vice President AASHTO 105 W. Capitol Avenue Jefferson City MO Dear Mr. Rahn: I am writing this letter on behalf of the AASHTO Technology Implementation Group (TIG), Self-Propelled Modular Transporter (SPMT) team. We are hoping to provide you with a possible idea for your platform or areas of emphasis as AASHTO President. Your reputation as an innovator indicates our focus area may be of interest. One of the most exciting, interesting and promising arenas in accelerated construction is the quest to find ways to build structures more quickly. SPMT technology is, very simply, the fastest way to remove and replace structures. Using SPMT technology, Louisiana DOT completed the removal and replacement of a damaged Interstate bridge in less than three hours. Florida DOT used the technology on I-10, removing and replacing a local road over the interstate with only four night-time closures as opposed to months of in-place construction. My agency, Utah DOT, will remove and replace a structure on Urban I-215 over a weekend this fall. SPMTs are large vehicles designed to move entire structures. The usual SPMT process is to build the replacement structure in a staging area close to the project, and to use SPMTs to remove the old structure and bring in the new structure. As you can see from the examples above, this technology is proven to replace bridges extremely rapidly. It is also a visually stunning, media-friendly, and very compelling demonstration of agency innovation at work for highway users an extraordinary process our customers can grasp and appreciate in a matter of seconds. As you may know, the purpose of AASHTO s TIG is to speed deployment of proven technologies through aggressive marketing and education. SPMT s are one of the proven technologies chosen for emphasis and promotion over the next two years. In that time, our team aims to help 10 state agencies reach a point at which two SPMT projects are in the pipeline on a continuous basis, while a new tier of state and local agencies, MPO s and toll facilities develop10 first-time SPMT uses. We hope that you will consider using accelerated construction as part of your messaging, with the timesaving and safety benefits of SPMT as a dramatic example. This letter is purposely concise, but there is much additional information to share. If you are interested, the SPMT TIG will provide more information or give you a briefing. Should you desire to see this technology in action, the TIG and the Utah Department of Transportation invite you to join us for the removal and replacement of a bridge in Salt Lake City Utah on October 27 th and 28 th, Please contact me for more information. 34

35 Thank you and good luck with your tenure as AASHTO President! Sincerely, James McMinimee Director, Project Development Utah Department of Transportation AASHTO SMPT TIG cc: John Njord UDOT Executive Director Carlos Braceras UDOT Deputy Director AASHTO TIG SPMT LST 35

36 Letter to AASHTO President offering a briefing: November 7, 2007 Mr. Pete Rahn, Director Missouri DOT AASHTO President 105 W. Capitol Avenue Jefferson City MO Dear Mr. Rahn: I write to you on behalf of the AASHTO Technology Implementation Group (TIG) Lead States Team (LST) regarding the use of Self-Propelled Modular Transporters (SPMTs) to remove and install bridges. As you are aware, the Utah Department of Transportation (UDOT) recently completed a project to remove and replace a 3 million pound, 172 foot structure in Salt Lake City, Utah over I-215 using SPMTs. The removal and replacement of the structure took place over a single weekend and was an event that captured the minds and imaginations of several thousand in attendance as well as the media. The TIG SPMT LST would like to offer you and your staff a briefing on its national initiative to increase the use of SPMT technology to move bridges. As you know, the purpose of the AASHTO TIG and Lead States Teams is to promote the rapid deployment of new, high-payoff, ready-to-use technologies. We make this offer to you and the Missouri DOT because of your reputation as an innovator and because of your reputation as an implementer of new technologies and ideas. The SPMT LST would like to familiarize you with this technology and ask for your assistance in implementing these proven techniques to reduce onsite construction time from months to days. We would like to propose a 45-minute presentation during the first part of December at the Missouri DOT. The presentation would be made to you and your staff by one or two members from the SPMT LST with the rest of the SPMT LST joining via a web meeting. We understand and appreciate how busy you must be and the SPMT LST would be flexible in regards to any of the proposal, date, etc. If you are interested please tell us what would work for you. Please contact me at (801) , (801) , or jmcminimee@utah.gov. Thank you and I look forward to speaking with you. Sincerely, Jim McMinimee Director, Project Development Utah Department of Transportation AASHTO TIG SMPT 36

Accelerated Bridge Construction (ABC) and the Utah Experience

Accelerated Bridge Construction (ABC) and the Utah Experience Accelerated Bridge Construction (ABC) and the Utah Experience by Kris Peterson, P.E., UDOT Mary Lou Ralls, P.E., Ralls Newman, LLC AASHTO Subcommittee on Construction Annual Meeting Computers and Technology

More information

Clear Roads Overview and Highlights

Clear Roads Overview and Highlights Clear Roads Overview and Highlights AASHTO SCOM / TRB Maintenance Conference July 20, 2015 Des Moines, Iowa Justin Droste, P.E. Roadway Operations Engineer, Michigan DOT Clear Roads Technical Advisory

More information

Clear Roads Overview. National Winter Maintenance Peer Exchange September 12-13, 2017 Pittsburgh, PA

Clear Roads Overview. National Winter Maintenance Peer Exchange September 12-13, 2017 Pittsburgh, PA Clear Roads Overview National Winter Maintenance Peer Exchange September 12-13, 2017 Pittsburgh, PA Overview Clear Roads Winter Highway Operations Pooled Fund, TPF-5(353), is a national research consortium

More information

Automated Machine Guidance An Emerging Technology Whose Time has Come?

Automated Machine Guidance An Emerging Technology Whose Time has Come? Lou Barrett Page 1 Automated Machine Guidance An Emerging Technology Whose Time has Come? Author: Lou Barrett Chairwoman AASHTO TIG AMG Minnesota Department of Transportation MS 688 395 John Ireland Blvd.

More information

NUTC R293. Field Evaluation of Thermographic Bridge Concrete Inspection Techniques. Glenn Washer

NUTC R293. Field Evaluation of Thermographic Bridge Concrete Inspection Techniques. Glenn Washer Field Evaluation of Thermographic Bridge Concrete Inspection Techniques by Glenn Washer NUTC R293 A National University Transportation Center at Missouri University of Science and Technology Disclaimer

More information

James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures

James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures 1 Highlights WisDOT s ABC Development of PBES Piers Road of Development, Implementation, and Institutionalization Lessons Learned

More information

ABC-UTC Progress Report

ABC-UTC Progress Report 1 ABC-UTC 2015 Progress Report This document provides the problem statement, objective and scope of the project, followed by list of tasks and their status A. PROJECT TITLE: An Integrated Project- to Enterprise-Level

More information

State Capitals Directions:

State Capitals Directions: State Capitals Directions: Using the word bank of state capitals below, match the capitals to their state. Hint: Use a map of the United States to help you locate the capitals. State Capitals Albany -

More information

Deep Creek Canyon US Highway 12

Deep Creek Canyon US Highway 12 Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1 Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location

More information

State of the Art Precast, Prestressed Concrete Bridges and Industry Innovations

State of the Art Precast, Prestressed Concrete Bridges and Industry Innovations State of the Art Precast, Prestressed Concrete Bridges and Industry Innovations William N. Nickas, P.E. Managing Director, Transportation Services Precast/Prestressed Concrete Institute Chicago, IL. LEARNING

More information

PLANNING SNAPSHOT 11:

PLANNING SNAPSHOT 11: PLANNING SNAPSHOT 11: CONNECTED AND AUTONOMOUS VEHICLES JULY 2017 Funded through the NCHRP 8-36 Research Series, these snapshots are designed to tell you a little about the current state of a specific

More information

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone Precast Bridge Built in only Eight Days by Peter E. Stamnas and Mark D. Whittemore. New Hampshire Department of Transportation Minimizing construction-related traffic delays and improving workzone safety

More information

EXECUTIVE SUMMARY. St. Louis Region Emerging Transportation Technology Strategic Plan. June East-West Gateway Council of Governments ICF

EXECUTIVE SUMMARY. St. Louis Region Emerging Transportation Technology Strategic Plan. June East-West Gateway Council of Governments ICF EXECUTIVE SUMMARY St. Louis Region Emerging Transportation Technology Strategic Plan June 2017 Prepared for East-West Gateway Council of Governments by ICF Introduction 1 ACKNOWLEDGEMENTS This document

More information

PCI Update on Transportation Activities and elearning Modules for AASHTO Technical Committee T-4 AASHTO SCOBS --- Spokane Washington

PCI Update on Transportation Activities and elearning Modules for AASHTO Technical Committee T-4 AASHTO SCOBS --- Spokane Washington PCI Update on Transportation Activities and elearning Modules for AASHTO Technical Committee T-4 AASHTO SCOBS --- Spokane Washington June 2017 William N. Nickas, P.E. Managing Director, Transportation

More information

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway) I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project

More information

Health Impact Assessment (HIA) & Transportation

Health Impact Assessment (HIA) & Transportation Health Impact Assessment (HIA) & Transportation Keshia Pollack, PhD, MPH Associate Professor, Department of Health Policy & Management Johns Hopkins Bloomberg School of Public Health July 15, 2014 Professional

More information

Controlling Changes Lessons Learned from Waste Management Facilities 8

Controlling Changes Lessons Learned from Waste Management Facilities 8 Controlling Changes Lessons Learned from Waste Management Facilities 8 B. M. Johnson, A. S. Koplow, F. E. Stoll, and W. D. Waetje Idaho National Engineering Laboratory EG&G Idaho, Inc. Introduction This

More information

Emerging Transportation Technology Strategic Plan for the St. Louis Region Project Summary June 28, 2017

Emerging Transportation Technology Strategic Plan for the St. Louis Region Project Summary June 28, 2017 Emerging Transportation Technology Strategic Plan for the St. Louis Region Project Summary June 28, 2017 Prepared for: East West Gateway Council of Governments Background. Motivation Process to Create

More information

Science Impact Enhancing the Use of USGS Science

Science Impact Enhancing the Use of USGS Science United States Geological Survey. 2002. "Science Impact Enhancing the Use of USGS Science." Unpublished paper, 4 April. Posted to the Science, Environment, and Development Group web site, 19 March 2004

More information

Epinephrine Salts Medicinal Nitroglycerine P & U Listed Syringe Waste. Epinephrine Salts. Medicinal Nitroglycerine

Epinephrine Salts Medicinal Nitroglycerine P & U Listed Syringe Waste. Epinephrine Salts. Medicinal Nitroglycerine Epinephrine Salts Medicinal Nitroglycerine P & U Listed Syringe Waste Following is a list of each state and whether or not they are consistent with the EPA s stance on Epinephrine Salts, Medicinal Nitroglycerine

More information

MINUTES REGULAR COMMISSION MEETING THE PORT OF PORTLAND January 9, 2008

MINUTES REGULAR COMMISSION MEETING THE PORT OF PORTLAND January 9, 2008 1 MINUTES REGULAR COMMISSION MEETING THE PORT OF PORTLAND January 9, 2008 In response to due notice, the regular meeting of the Commissioners of the Port of Portland was held at 9:00 a.m. in the Commission

More information

NUTC ETT215. Outreach Activities in Support of the Missouri S&T National UTC. Angela Rolufs

NUTC ETT215. Outreach Activities in Support of the Missouri S&T National UTC. Angela Rolufs Outreach Activities in Support of the Missouri S&T National UTC by Angela Rolufs NUTC ETT215 A National University Transportation Center at Missouri University of Science and Technology Disclaimer The

More information

Ohio Transportation Engineers Conference

Ohio Transportation Engineers Conference Ohio Transportation Engineers Conference Ohio Department of Transportation Summary of FHWA Transportation Research Board (TRB) Stormwater Research Completed and In-Progress Mark McCabe October 25-26, 2016

More information

11/15/2010. Construction. Accelerated Bridge Construction (ABC) Definition. Systems (PBES) Definition

11/15/2010. Construction. Accelerated Bridge Construction (ABC) Definition. Systems (PBES) Definition Successes in Accelerated Bridge Construction Mary Lou Ralls, P.E. Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer) 1 Accelerated Bridge Construction (ABC) Definition Structural & geotechnical

More information

FHWA s Demonstration Project for Enhanced Durability Through Increased Density

FHWA s Demonstration Project for Enhanced Durability Through Increased Density FHWA s Demonstration Project for Enhanced Durability Through Increased Density Courtesy Asphalt Institute TIM ASCHENBRENER, P.E. SENIOR ASPHALT PAVEMENT ENGINEER PAVEMENT MATERIALS TEAM OFFICE OF PRECONSTRUCTION,

More information

PUBLIC ART PROGRAM Guidelines for Site Plan Projects

PUBLIC ART PROGRAM Guidelines for Site Plan Projects PUBLIC ART PROGRAM Guidelines for Site Plan Projects I. Purpose II. Public Art Policy Goals III. Developer s Options for Public Art IV. Administrative Regulation 4.1 V. Contributing to the Public Art Fund

More information

Preparing for an Uncertain Future:

Preparing for an Uncertain Future: : for a Greater Baltimore Region DRAFT Maximize2040 is an initiative of the Baltimore Regional Transportation Board, the metropolitan planning organization for the Baltimore region. 1 SCENARIO THINKING:

More information

District of Columbia Power Line Undergrounding (DC PLUG) Initiative

District of Columbia Power Line Undergrounding (DC PLUG) Initiative District of Columbia Power Line Undergrounding (DC PLUG) Initiative Community Hearing 125 Michigan Avenue, NE Washington, DC 20017 Presented by: Aaron Smith (Pepco), Ronald Williams (DDOT) and Morgan O

More information

NUTC ETT224. Outreach Activities in Support of the Missouri S&T National UTC. Angela Rolufs

NUTC ETT224. Outreach Activities in Support of the Missouri S&T National UTC. Angela Rolufs Outreach Activities in Support of the Missouri S&T National UTC by Angela Rolufs NUTC ETT224 A National University Transportation Center at Missouri University of Science and Technology Disclaimer The

More information

Recommended Citations

Recommended Citations Recommended Citations Entire set Kunkel, K., R. Frankson, J. Runkle, S. Champion, L. Stevens, D. Easterling, and B. Stewart (Eds.), 2017: State Climate Summaries for the United States. NOAA Technical Report

More information

STATE AGENCIES FOR SURPLUS PROPERTY

STATE AGENCIES FOR SURPLUS PROPERTY SUPP 1 DoD 4160.21-M STATE AGENCIES FOR SURPLUS PROPERTY ALABAMA CALIFORNIA Surplus Division California State for 4401 Northern By-Pass Surplus P.O. BOX 210487 701 Burning Tree Road Montgomery, AL 36121-0487

More information

What Works Cities Brief: The City Hall Data Gap

What Works Cities Brief: The City Hall Data Gap What Works Cities Brief: The City Hall Data Gap Yes, Using Data Can Help Cities Drive Change But Cities Need Help To Overcome the Hurdles Executive Summary Unlocking the potential of data and evidence

More information

A domestic address must contain the following data elements:

A domestic address must contain the following data elements: ADDRESS EDITS FOR FILE MAINTENANCE ATTACHMENT TO SERVICE REQUEST #16941 FINAL 1.0 INTRODUCTION There are minimal edits in the Payroll/Personnel System (PPS) for employee address formatting which is causing

More information

Event Planning & Management: How to Create a Wildly Successful Offline or Online Event Checklist

Event Planning & Management: How to Create a Wildly Successful Offline or Online Event Checklist Event Planning & Management: How to Create a Wildly Successful Offline or Online Event Checklist I have set a specific goal or objective for this event: For myself/my company For my attendees I have identified

More information

CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE

CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE Dennis Gratton Manager, Rail planning, Rail Implementation Office & Annie Hillis Public Art Coordinator, Rail Implementation Office November 7, 2013 OVERVIEW

More information

Innovation-Based Economic Development Strategy for Holyoke and the Pioneer Valley

Innovation-Based Economic Development Strategy for Holyoke and the Pioneer Valley Massachusetts Technology Collaborative John Adams Innovation Institute Innovation-Based Economic Development Strategy for Holyoke and the Pioneer Valley Innovation District Task Force Meeting October 27,

More information

Gerald G. Boyd, Tom D. Anderson, David W. Geiser

Gerald G. Boyd, Tom D. Anderson, David W. Geiser THE ENVIRONMENTAL MANAGEMENT PROGRAM USES PERFORMANCE MEASURES FOR SCIENCE AND TECHNOLOGY TO: FOCUS INVESTMENTS ON ACHIEVING CLEANUP GOALS; IMPROVE THE MANAGEMENT OF SCIENCE AND TECHNOLOGY; AND, EVALUATE

More information

Characteristics of Competitive Places: Changing Models of Economic Dynamism

Characteristics of Competitive Places: Changing Models of Economic Dynamism Characteristics of Competitive Places: Changing Models of Economic Dynamism IEDC/IASP 2009 Conference Technology-Led Economic Development World Science and Technology Park Research Triangle Park, NC June

More information

Precast Concrete Pavement

Precast Concrete Pavement Precast Concrete Pavement Phillip Sturdivant, P.E. Louisiana Department of Transportation and Development www.dotd.la.gov What is Precast Concrete Pavement? Precast concrete pavement is what it says it

More information

How to Estimate the Cost of a. Precast Concrete Parking Structure

How to Estimate the Cost of a. Precast Concrete Parking Structure How to Estimate the Cost of a Precast Concrete Parking Structure 1 TABLE OF CONTENTS 1. INTRODUCTION 2. TYPES AND METHODS OF MEASUREMENT 3. SPECIFIC FACTORS THAT MAY AFFECT TAKE OFF AND PRICING 4. OVERVIEW

More information

Regional Innovation Ecosystems:

Regional Innovation Ecosystems: Regional Innovation Ecosystems: The Role of the University in Fostering Economic Growth Ross DeVol Chief Research Officer Milken Institute Caltech Giant High Level Forum, Leading Innovation Ecosystems

More information

The U.S. Decennial Census A Brief History

The U.S. Decennial Census A Brief History 1 The U.S. Decennial Census A Brief History Under the direction of then Secretary of State, Thomas Jefferson, the first U.S. Census began on August 2, 1790, and was to be completed by April 1791 The total

More information

Creating a VE Program at the Ministry of Transportation Ontario

Creating a VE Program at the Ministry of Transportation Ontario Creating a VE Program at the Ministry of Transportation Ontario Stephen Holmes, P. Eng, CVS, Senior Engineer, Value Engineering Ontario Ministry of Transportation, steve.holmes@mto.gov.on.ca Edward C.

More information

LERA Perspectives on Work

LERA Perspectives on Work LERA Perspectives on Work 2017 (Vol 21, Number 1) - 2016 (Vol 20, Number 1) - The Gig Economy: Employment Implications 2015 (Vol 19, Number 1) - Management Excellence 2014 (Vol 18, Number 1) - Mapping

More information

Focus Group Participants Understanding of Advance Warning Arrow Displays used in Short-Term and Moving Work Zones

Focus Group Participants Understanding of Advance Warning Arrow Displays used in Short-Term and Moving Work Zones Focus Group Participants Understanding of Advance Warning Arrow Displays used in Short-Term and Moving Work Zones Chen Fei See University of Kansas 2160 Learned Hall 1530 W. 15th Street Lawrence, KS 66045

More information

RANCHO CUCAMONGA COMMUNITY & ARTS FOUNDATION MINUTES OF THE APRIL 27, 2016, REGULAR MEETING

RANCHO CUCAMONGA COMMUNITY & ARTS FOUNDATION MINUTES OF THE APRIL 27, 2016, REGULAR MEETING RANCHO CUCAMONGA COMMUNITY & ARTS FOUNDATION MINUTES OF THE APRIL 27, 2016, REGULAR MEETING A. CALL TO ORDER The regular meeting of the Rancho Cucamonga Community & Arts Foundation was held on Wednesday,

More information

NPI Are You Ready? The presentation was created to assist Navicure clients in navigating the information received regarding NPI.

NPI Are You Ready? The presentation was created to assist Navicure clients in navigating the information received regarding NPI. NPI Are You Ready? The presentation was created to assist Navicure clients in navigating the information received regarding NPI. NPI Overview Getting an NPI is free - Not Having One Can Be Costly. The

More information

Non-Destructive Bridge Deck Assessment using Image Processing and Infrared Thermography. Masato Matsumoto 1

Non-Destructive Bridge Deck Assessment using Image Processing and Infrared Thermography. Masato Matsumoto 1 Non-Destructive Bridge Deck Assessment using Image Processing and Infrared Thermography Abstract Masato Matsumoto 1 Traditionally, highway bridge conditions have been monitored by visual inspection with

More information

Selecting, Developing and Designing the Visual Content for the Polymer Series

Selecting, Developing and Designing the Visual Content for the Polymer Series Selecting, Developing and Designing the Visual Content for the Polymer Series A Review of the Process October 2014 This document provides a summary of the activities undertaken by the Bank of Canada to

More information

CONSIDER APPROVAL OF THE MINUTES OF THE 12/11/2008 MEETING

CONSIDER APPROVAL OF THE MINUTES OF THE 12/11/2008 MEETING STATE OF TEXAS COUNTY OF BRAZORIA CITY OF FREEPORT BE IT REMEMBERED that the Economic Development Corporation of the City of Freeport met in a regular meeting Tuesday, December 30th, 2008, at the Freeport

More information

Precast Concrete Panels for Rapid Pavement Repair

Precast Concrete Panels for Rapid Pavement Repair Precast Concrete Panels for Rapid Pavement Repair Scott Shuler, Ph. D., P. E. Colorado State University Ft. Collins, CO 80523-1584 Gary Dewitt, P. E. Colorado Department of Transportation Evans, Colorado

More information

MANAGING PEOPLE, NOT JUST R&D: FIVE COMPANIES EXPERIENCES

MANAGING PEOPLE, NOT JUST R&D: FIVE COMPANIES EXPERIENCES 61-03-61 MANAGING PEOPLE, NOT JUST R&D: FIVE COMPANIES EXPERIENCES Robert Szakonyi Over the last several decades, many books and articles about improving the management of R&D have focused on managing

More information

STATE REGULATORS PERSPECTIVES ON LTS IMPLEMENTATION AND TECHNOLOGIES Results of an ITRC State Regulators Survey. Thomas A Schneider

STATE REGULATORS PERSPECTIVES ON LTS IMPLEMENTATION AND TECHNOLOGIES Results of an ITRC State Regulators Survey. Thomas A Schneider STATE REGULATORS PERSPECTIVES ON LTS IMPLEMENTATION AND TECHNOLOGIES Results of an ITRC State Regulators Survey Thomas A Schneider Ohio Environmental Protection Agency 401 East Fifth Street Dayton OH 45402-2911

More information

ABC and Innovative Bridge Construction for Minnesota Local Roads

ABC and Innovative Bridge Construction for Minnesota Local Roads ABC and Innovative Bridge Construction for Minnesota Local Roads May 23, 2013 To box the cha of t unl qua gra ma all g You ma add Tex Chris Werner, PE Senior Bridge Engineer HDR Engineering, Inc. 763-278-5918

More information

2015 Annual Meeting REPORT OF THE PUBLIC AND INVESTOR RELATIONS COMMITTEE

2015 Annual Meeting REPORT OF THE PUBLIC AND INVESTOR RELATIONS COMMITTEE 2015 Annual Meeting REPORT OF THE PUBLIC AND INVESTOR RELATIONS COMMITTEE The past year has been a banner one for our public and investor relations efforts. The 2015 MLP Investor Conference was the most

More information

MOTIVATING BLACK COMMUNITIES TO PARTICIPATE IN THE 2020 CENSUS

MOTIVATING BLACK COMMUNITIES TO PARTICIPATE IN THE 2020 CENSUS MOTIVATING BLACK COMMUNITIES TO PARTICIPATE IN THE 2020 CENSUS Key findings from qualitative and quantitative research among Black adults Conducted February April 2018, by Hart Research and Brossard Research

More information

MANuFACturers industry QuALity statement.

MANuFACturers industry QuALity statement. MANuFACturers industry QuALity statement Precast New Zealand Inc. (PCNZ) was established in 1999 and is a national industry association of precast concrete manufacturers representing over 90% of the off

More information

Prefabricated Elements Case Study

Prefabricated Elements Case Study Prefabricated Elements Case Study Final Report June 2007 Sponsored by the Smart Work Zone Deployment Initiative a Federal Highway Administration pooled fund study and the Midwest Transportation Consortium

More information

Connected Vehicles and Maintenance Operations

Connected Vehicles and Maintenance Operations Connected Vehicles and Maintenance Operations Presentation to AASHTO SCOM Dean Deeter Athey Creek Consultants Topics Connected Vehicle Priorities Survey Results Connected Vehicle Applications Related to

More information

Committee and Guild Activity Descriptions

Committee and Guild Activity Descriptions Committee and Guild Activity Descriptions Auction/Quilt Show/Raffle Quilt Committees The committees are responsible for working with the Publicity/Marketing Committee and coordinating the activities listed

More information

Public Policy for Angels. Angels are Important to the Economy: Public Policy Strategies to Promote More Investment in Entrepreneurial Companies

Public Policy for Angels. Angels are Important to the Economy: Public Policy Strategies to Promote More Investment in Entrepreneurial Companies Public Policy for Angels Angels are Important to the Economy: Public Policy Strategies to Promote More Investment in Entrepreneurial Companies Agenda Who angels are and how they support entrepreneurs and

More information

PIER DAYLIGHTING PLUS RETAIL REVISIONING

PIER DAYLIGHTING PLUS RETAIL REVISIONING March 12, 2008 PIER DAYLIGHTING PLUS RETAIL REVISIONING To: Program Advisory Committee (PAC) Members From: Heschong Mahone Group, Inc. Re: Retail Revisioning Project Description 1. PROJECT GOALS The goal

More information

Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario

Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario August 7, 2001 See Distribution List RE: Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario Dear Sir/Madam: The Electrical Safety

More information

Agenda Sustainability Task Force A Committee of the Chico City Council

Agenda Sustainability Task Force A Committee of the Chico City Council Agenda Sustainability Task Force A Committee of the Chico City Council Meeting of Thursday, January 22, 2015 5:30 p.m. Municipal Center - 421 Main Street, Conference Room No. 1 in the Council Chambers

More information

THE NETWORKING GAME. For Subs, Networking Is The Most Critical Component Of The Marketing Mix.

THE NETWORKING GAME. For Subs, Networking Is The Most Critical Component Of The Marketing Mix. THE NETWORKING GAME For Subs, Networking Is The Most Critical Component Of The Marketing Mix. by Greg Hoyle Consultant, Fails Management Institute Getting to know people, selling yourself and your firm

More information

Getting the evidence: Using research in policy making

Getting the evidence: Using research in policy making Getting the evidence: Using research in policy making REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 586-I Session 2002-2003: 16 April 2003 LONDON: The Stationery Office 14.00 Two volumes not to be sold

More information

COMPETITIVE ADVANTAGES AND MANAGEMENT CHALLENGES. by C.B. Tatum, Professor of Civil Engineering Stanford University, Stanford, CA , USA

COMPETITIVE ADVANTAGES AND MANAGEMENT CHALLENGES. by C.B. Tatum, Professor of Civil Engineering Stanford University, Stanford, CA , USA DESIGN AND CONST RUCTION AUTOMATION: COMPETITIVE ADVANTAGES AND MANAGEMENT CHALLENGES by C.B. Tatum, Professor of Civil Engineering Stanford University, Stanford, CA 94305-4020, USA Abstract Many new demands

More information

Home Energy Score Qualified Assessor Analysis. Results from the Qualified Assessor Questionnaire and Pilot Summit

Home Energy Score Qualified Assessor Analysis. Results from the Qualified Assessor Questionnaire and Pilot Summit Home Energy Score Qualified Assessor Analysis Results from the Qualified Assessor Questionnaire and Pilot Summit Table of Contents Summary... 2 Background... 2 Methodology... 3 Findings... 5 Conclusions...

More information

Acknowledging Jackson s Challenges for Growth The Significance of People & Place

Acknowledging Jackson s Challenges for Growth The Significance of People & Place Acknowledging Jackson s Challenges for Growth Updated 07/29/15 The Enterprise Group of Jackson, Inc. (EG) is the economic development agency supporting all of Jackson County. The Enterprise Group of Jackson,

More information

ROADMAP 12. Portland, OR June 18-19, Event Summary. Areas of Interest. Roadmap 12 Call for Proposals Case Studies, Speakers, & Breakout Sessions

ROADMAP 12. Portland, OR June 18-19, Event Summary. Areas of Interest. Roadmap 12 Call for Proposals Case Studies, Speakers, & Breakout Sessions ROADMAP 12 Portland, OR June 18-19, 2019 Roadmap 12 Call for Proposals Case Studies, Speakers, & Breakout Sessions June 18-19, 2019 Oregon Convention Center Portland, OR Proposal Submission Deadline: November

More information

Public Art Network Best Practice Goals and Guidelines

Public Art Network Best Practice Goals and Guidelines Public Art Network Best Practice Goals and Guidelines The Public Art Network (PAN) Council of Americans for the Arts appreciates the need to identify best practice goals and guidelines for the field. The

More information

What We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012

What We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012 What We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012 What We Heard Report: The Case for Change 1 Report of What We Heard: The Case for Change Consultation

More information

Minutes NASHVILLE METROPOLITAN TRANSIT AUTHORITY BOARD OF DIRECTORS MEETING. February 23, 2017

Minutes NASHVILLE METROPOLITAN TRANSIT AUTHORITY BOARD OF DIRECTORS MEETING. February 23, 2017 Minutes NASHVILLE METROPOLITAN TRANSIT AUTHORITY BOARD OF DIRECTORS MEETING February 23, 2017 I. CALL TO ORDER: The regular meeting of the Nashville Metropolitan Transit Authority Board of Directors was

More information

Inclusion: All members of our community are welcome, and we will make changes, when necessary, to make sure all feel welcome.

Inclusion: All members of our community are welcome, and we will make changes, when necessary, to make sure all feel welcome. The 2016 Plan of Service comprises short-term and long-term goals that we believe will help the Library to deliver on the objectives set out in the Library s Vision, Mission and Values statement. Our Vision

More information

Wellhead Protection Zone Delineation

Wellhead Protection Zone Delineation Wellhead Protection Zone Delineation Sounding Board Process Summary Sounding Board at a Glance The City of Redmond (Redmond) is evaluating how to re-delineate Wellhead Protection Zones for the Redmond

More information

DIGITAL INCLUSION STRATEGY

DIGITAL INCLUSION STRATEGY APPENDIX C South Cambridgeshire District Council DIGITAL INCLUSION STRATEGY 2015-2017 Printed and Published by: South Cambridgeshire District Council February 2015 Paper copies available upon request contact:

More information

I. Introduction. Cover note. A. Mandate. B. Scope of the note. Technology Executive Committee. Fifteenth meeting. Bonn, Germany, September 2017

I. Introduction. Cover note. A. Mandate. B. Scope of the note. Technology Executive Committee. Fifteenth meeting. Bonn, Germany, September 2017 Technology Executive Committee 31 August 2017 Fifteenth meeting Bonn, Germany, 12 15 September 2017 Draft TEC and CTCN inputs to the forty-seventh session of the Subsidiary Body for Scientific and Technological

More information

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. ABSTRACT Cities and Counties are faced with increasing traffic congestion

More information

Katrina McMurrian, CCIF Executive Director NASUCA 2016 Mid-Year Meeting New Orleans, LA June 7, 2016

Katrina McMurrian, CCIF Executive Director NASUCA 2016 Mid-Year Meeting New Orleans, LA June 7, 2016 Katrina McMurrian, CCIF Executive Director NASUCA 2016 Mid-Year Meeting New Orleans, LA June 7, 2016 Brings together key people = state commissioners + consumer advocates + electric utility reps ( 3 core

More information

THE GRAFFITI CONSULTANTS CONSIDERATIONS

THE GRAFFITI CONSULTANTS CONSIDERATIONS THE GRAFFITI CONSULTANTS CONSIDERATIONS NOTE: Please remember that the best way to implement many of these Considerations is to give them a try on a trial basis and see if they work for you. We are always

More information

Mississippi Institutions of Higher Learning

Mississippi Institutions of Higher Learning Mississippi Institutions of Higher Learning Presenter: Peter Reeves June 18, 2014 University of Oregon University of Pennsylvania University of Redlands University of Rhode Island University of Rochester

More information

WFEO STANDING COMMITTEE ON ENGINEERING FOR INNOVATIVE TECHNOLOGY (WFEO-CEIT) STRATEGIC PLAN ( )

WFEO STANDING COMMITTEE ON ENGINEERING FOR INNOVATIVE TECHNOLOGY (WFEO-CEIT) STRATEGIC PLAN ( ) WFEO STANDING COMMITTEE ON ENGINEERING FOR INNOVATIVE TECHNOLOGY (WFEO-CEIT) STRATEGIC PLAN (2016-2019) Hosted by The China Association for Science and Technology March, 2016 WFEO-CEIT STRATEGIC PLAN (2016-2019)

More information

Esri and Autodesk What s Next?

Esri and Autodesk What s Next? AN ESRI VISION PAPER JANUARY 2018 Esri and Autodesk What s Next? Copyright 2018 Esri All rights reserved. Printed in the United States of America. The information contained in this document is the exclusive

More information

Innovative Approaches in Collaborative Planning

Innovative Approaches in Collaborative Planning Innovative Approaches in Collaborative Planning Lessons Learned from Public and Private Sector Roadmaps Jack Eisenhauer Senior Vice President September 17, 2009 Ross Brindle Program Director Energetics

More information

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO Brief to the Senate Standing Committee on Social Affairs, Science and Technology Dr. Eliot A. Phillipson President and CEO June 14, 2010 Table of Contents Role of the Canada Foundation for Innovation (CFI)...1

More information

Newsletter Newsletter Published on Division for Planetary Sciences ( Issue 17-17, April 20, 2017

Newsletter Newsletter Published on Division for Planetary Sciences (  Issue 17-17, April 20, 2017 Newsletter 17-17 Issue 17-17, April 20, 2017 +------------------------------------CONTENTS----------------------------------------+ 1. MESSAGE FROM THE CHAIR: THE MARCH FOR SCIENCE SATURDAY APRIL 22, 2017

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CEMP-RA Engineer Regulation 200-1-1 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 ER 200-1-1 30 May 2000 Environmental Quality POLICY AND GENERAL REQUIREMENTS FOR THE ENVIRONMENTAL

More information

Overview of Precast ABC Projects in the Pacific Northwest. Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane

Overview of Precast ABC Projects in the Pacific Northwest. Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane Overview of Precast ABC Projects in the Pacific Northwest Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane 1 Techniques Additional prefabrication of units to reduce field timeline Simplify deck installation

More information

Basic Policy for Management of the Impulsing Paradigm Change through Disruptive Technologies (ImPACT) Program

Basic Policy for Management of the Impulsing Paradigm Change through Disruptive Technologies (ImPACT) Program (Provisional) Basic Policy for Management of the Impulsing Paradigm Change through Disruptive Technologies (ImPACT) Program February 14, 2014 Council for Science and Technology Policy The Council for Science

More information

Be Counted, America! The Challenge Ahead An analysis of mail-in participation in the 2010 Census as door-to-door enumeration begins

Be Counted, America! The Challenge Ahead An analysis of mail-in participation in the 2010 Census as door-to-door enumeration begins May 3, 2010 Be Counted, America! The Challenge Ahead An analysis of mail-in participation in the 2010 Census as door-to-door enumeration begins On April 28, the U.S. Census Bureau announced that the nation

More information

A GUIDE TO HOSTING SUCCESSFUL CONGRESSIONAL PLANT TOURS

A GUIDE TO HOSTING SUCCESSFUL CONGRESSIONAL PLANT TOURS A GUIDE TO HOSTING SUCCESSFUL CONGRESSIONAL PLANT TOURS 1 A GUIDE TO HOSTING SUCCESSFUL CONGRESSIONAL PLANT TOURS Introduction...3 10 Steps to a Successful Plant Tour.4 Sample Invitation..5 Sample Press

More information

1. EXECUTIVE SUMMARY

1. EXECUTIVE SUMMARY 1. EXECUTIVE SUMMARY 1.1 INTRODUCTION This document is the Final Evaluation Report for the Genesis Advanced Traveler Information System (ATIS) Field Operational Test (FOT). This test was co-sponsored by

More information

2012 ACCE Industry Advisory Board Best Practices Positioning Your Firm After the Great Recession

2012 ACCE Industry Advisory Board Best Practices Positioning Your Firm After the Great Recession 2012 ACCE Industry Advisory Board Best Practices Positioning Your Firm After the Great Recession 2012 FMI Corporation 0 The Great Recession 2012 FMI Corporation 1 FMI Corporation 2010 1 Market Truths You

More information

Committee on Development and Intellectual Property (CDIP)

Committee on Development and Intellectual Property (CDIP) E CDIP/10/13 ORIGINAL: ENGLISH DATE: OCTOBER 5, 2012 Committee on Development and Intellectual Property (CDIP) Tenth Session Geneva, November 12 to 16, 2012 DEVELOPING TOOLS FOR ACCESS TO PATENT INFORMATION

More information

Staff: Interim Executive Director. Business Development Director Environmental Programs Director. Planning and Development Director

Staff: Interim Executive Director. Business Development Director Environmental Programs Director. Planning and Development Director MINUTES OF THE PORT OF BELLINGHAM COMMISSION MEETING HELD TUESDAY, JULY 17, 2012 HARBOR CENTER BUILDING CONFERENCE ROOM 1801 ROEDER AVENUE, BELLINGHAM, WASHINGTON Present: Scott L. Walker President Michael

More information

Buffalo & Erie County Public Library Strategic Plan

Buffalo & Erie County Public Library Strategic Plan Buffalo & Erie County Public Library 2017-2021 Strategic Plan Libraries Transform The thirty-seven (37) libraries and the Library on Wheels bookmobile of the Buffalo & Erie County Public Library (B&ECPL)

More information

National Petroleum Council

National Petroleum Council National Petroleum Council 125th Meeting March 27, 2015 National Petroleum Council 1 National Petroleum Council Arctic Potential Realizing the Promise of U.S. Arctic Oil and Gas Resources March 27, 2015

More information

National Petroleum Council. Arctic Potential

National Petroleum Council. Arctic Potential National Petroleum Council Arctic Potential Realizing the Promise of U.S. Arctic Oil and Gas Resources March 27, 2015 National Petroleum Council 1 Introduction In October 2013, the Secretary of Energy

More information

Instrumentation and Control

Instrumentation and Control Program Description Instrumentation and Control Program Overview Instrumentation and control (I&C) and information systems impact nuclear power plant reliability, efficiency, and operations and maintenance

More information

DATA AT THE CENTER. Esri and Autodesk What s Next? February 2018

DATA AT THE CENTER. Esri and Autodesk What s Next? February 2018 DATA AT THE CENTER Esri and Autodesk What s Next? February 2018 Esri and Autodesk What s Next? Executive Summary Architects, contractors, builders, engineers, designers and planners face an immediate opportunity

More information