1 Major Change in Technical Assistance Project Number: TA Number: 8240 November 2013 Supporting Regional Project Development for Association of Southeast Asian Nations Connectivity

2 ABBREVIATIONS ADB Asian Development Bank ASEAN Association of Southeast Asian Nations IES International Enterprise Singapore PPP public private partnership SERC Regional Cooperation and Operations Coordination Division SERD Southeast Asia Department TA technical assistance NOTES In this report, "$" refers to US dollars, unless otherwise stated. Vice-President S. Groff, Operations Group 2 Director General J. Nugent, Southeast Asia Department (SERD) Director J. Lynch, Director, Regional Cooperation and Operations Coordination Division, SERD Team leader Team members J. Cyhn, Principal Economist, SERD M. Bugayong, Associate Operations Officer, SERD B. Finlayson, Principal Public Private Partnership Specialist, SERD T. Lewis, Senior Infrastructure Specialist (Public Private Partnership), Regional and Sustainable Development Department H. Nguyen, Regional Cooperation Specialist, SERD In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

3 CONTENTS Page I. PROPOSED MAJOR CHANGES 1 II. BACKGROUND 1 III. IMPLEMENTATION PROGRESS 3 IV. RATIONALE FOR THE PROPOSED CHANGES 4 V. DUE DILIGENCE 4 VI. THE PRESIDENT'S RECOMMENDATION 5 APPENDIXES 1. Revised Design and Monitoring Framework 6 2. List of Linked Documents 8

4 I. PROPOSED MAJOR CHANGES 1. An increase in technical assistance (TA) amount and a major change in scope for Supporting Regional Project Development for Association of Southeast Asian Nations Connectivity are proposed for Board consideration. 2. The major changes to the TA scope and implementation arrangements are to include (i) an expanded scale of TA activities commensurate with the increased TA amount, and (ii) appropriate implementation arrangements for cofinancing administration. The TA activities are consistent with the existing components but are on a larger scale. The activities are screening more candidate projects and structuring additional potential public private partnership (PPP) infrastructure projects in Association of Southeast Asian Nations (ASEAN) countries, as well as increasing knowledge sharing activities as appropriate. 1 The TA will be implemented in close coordination and consultation with the cofinanciers. 3. The proposed changes will be funded by a proposed increase of $4.5 million to be financed on a grant basis by the International Enterprise Singapore (IES) and a proposed increase not exceeding the equivalent of Can$4.5 million to be financed on a grant basis by the Government of Canada, in each case to be administered by the Asian Development Bank (ADB). The President approved the original TA amount of $1.2 million financed by the Technical Assistance Special Fund (TASF-IV) on 4 December 2012, and the vice-president of Operations Group 2 approved additional financing of $300,000 financed by the Regional Cooperation and Integration Fund on 22 February Considering the expanded scope and the additional resources, it is proposed that the completion date of the TA be extended for an additional 18 months, from January 2016 to June The revised design and monitoring framework is in Appendix 1. II. BACKGROUND 4. The overall impact of the TA is greater economic connectivity in the ASEAN region. The outcome of the TA is increased investments from both the public and private sectors into ASEAN infrastructure development and connectivity. Private sector participation is emphasized since, as indicated in Infrastructure for a Seamless Asia, the investment requirement for Asia and the Pacific is around $8 trillion for , and this cannot be financed by the public sector alone. 2 Thus, the demand for infrastructure development requires additional investments from the private sector, as well as support to identify and structure viable projects. 5. The original TA was designed to deliver two outputs: (i) develop and apply a set of screening mechanisms to determine the most viable projects based on project readiness and expected development impact, and (ii) catalyze private sector investments by providing structuring support for the selected projects. 3 While synergies will continue to be sought with ADB and the ASEAN Infrastructure Fund for possible project financing support, it will be made 1 For this TA, PPP refers to catalyzing private participation in infrastructure development for the region. The private participation can be contributions to equity, lending, or other forms of participation in greenfield or brownfield projects. Private participation could also include operations and maintenance concessions for existing projects to enhance efficiency and overall project management. 2 Asian Development Bank Institute Infrastructure for a Seamless Asia. Manila and Tokyo. 3 The screening process would also identify the specific aspects of possible PPP structuring efforts to be undertaken. The TA may not need to undertake all aspects of PPP development, but concentrate on specific aspects in consultation with the stakeholders of given projects.

5 2 clear to the potential project sponsors that the support for PPP development under this TA does not ensure or guarantee financing with the private sector. At the same time, this TA aims to seek synergies with ADB and the ASEAN Infrastructure Fund pipeline projects. 4 The TA is designed with two main components: (i) (ii) Component 1: Project pipeline screening. This component would continue to build on the ADB Technical Assistance for the Master Plan on ASEAN Connectivity Implementation in deepening a pipeline of regional connectivity projects. 5 Accordingly, this TA will continue the efforts in further project screening in coordination with sector divisions within the Southeast Asia Department (SERD). This component aims to contribute to addressing the need to develop a sound infrastructure project pipeline based on project readiness, expected development impact, and support for regional economic connectivity. The screening process can also determine scope and appropriateness of the detailed work to be undertaken in conjunction with stakeholders through the TA to structure financially viable projects. Component 2: Public private partnership structuring support. Based on the findings and recommendations from ADB s Technical Assistance for the Promotion of Capital Market Instruments for Infrastructure Financing in the ASEAN, undertaken in response to the request by the ASEAN Working Committee on Capital Market Development, project structuring support is to prepare PPP transactions and to use capital market instruments for project financing. 6 Based on the results from the screening process as noted above, the support is to focus on structuring infrastructure projects to strengthen infrastructure development and support economic connectivity in the ASEAN region. 6. The original TA is classified as regional capacity development technical assistance with an estimated combined cost of $1.5 million, of which $1.2 million is financed on a grant basis by ADB s Technical Assistance Special Fund (TASF-IV) and $0.3 million by the Regional Cooperation and Integration Fund. Considering the resource-intensive nature of transaction advisory work for PPPs, it was envisioned that additional resources would be utilized in parallel, both from other cofinancing sources and ADB s related technical assistance. 7 The TA was approved on 4 December 2012, to be implemented over 36 months from January 2013 to January ADB s Regional Cooperation and Operations Coordination Division (SERC) in SERD as a focal point, with the Regional and Sustainable Development Department, is implementing the TA. Implementation requires that SERC coordinate with other SERD sector divisions and 4 This TA is also expected to have synergies with ADB-supported initiatives and national project development facilities in various Southeast Asian countries. 5 ADB Technical Assistance for the Master Plan on ASEAN Connectivity Implementation. Manila. Regional projects refer to those projects that promote cross-border development and national projects that clearly show regional economic impact and demonstration effects. 6 ADB Technical Assistance for the Promotion of Capital Market Instruments for Infrastructure Financing in the ASEAN. Manila. 7 Accordingly, additional cofinancing and collaboration arrangements were envisioned during the preparation of the TA, with cofinancing agreements to be finalized before the inception of the TA. ADB resources would come not only from this TA but also from other related TA, including ADB Technical Assistance for the Master Plan on ASEAN Connectivity Implementation. Manila.

6 3 resident missions on project administration responsibilities. 8 In addition, SERC will coordinate with the Private Sector Operations Department and the ADB community of practice on PPP to identify, screen, and structure PPP transactions. Furthermore, SERC will continue its coordination with ASEAN and its related initiatives in supporting infrastructure development and private sector participation. For specific in-country TA activities, ADB will seek concurrence from the respective government in advance. 8. With the additional resources through the cofinancing, the TA will engage a group of individual consultants and/or consulting firms, as appropriate, to provide the necessary advisory, technical and administrative support services. Because of the diverse skills requirements, it is envisaged that consultants will likely be engaged on an individual basis for the component on project pipeline screening, and through a firm for the component on PPP structuring. 9 To respond to project needs in a timely manner, prequalification of consultants and/or consulting firms may be undertaken. The consultants will be engaged in accordance with ADB s Guidelines on the Use of Consultants (2013, as amended from time to time). As required, ADB staff members will participate as resource persons. The purchase of necessary equipment (computer hardware and software) will be carried out in accordance with ADB's Procurement Guidelines (2013, as amended from time to time) and in coordination with the ADB Office of Information Systems and Technology and Office of Administrative Services, where applicable. Upon TA completion, any procured equipment will be turned over to the developing member countries participating government agencies in accordance with ADB guidelines. Disbursements under the TA will be made in accordance with ADB's Technical Assistance Disbursement Handbook (2010, as amended from time to time). III. IMPLEMENTATION PROGRESS 9. Following approval of the original TA, implementation of component 1 was initiated through active discussions with external stakeholders, including government contracting agencies, as well as within ADB s various departments, to explore opportunities and to identify prospective PPP projects to build a pipeline. 10 At the national level, consultations have been held with the PPP-related centers in Indonesia, Malaysia, the Philippines, and Thailand. A number of (greenfield) projects were discussed with institutions in Malaysia, the Philippines, and Thailand, although additional screening and scoping analysis is required. In addition, some refinancing possibilities were also discussed in Indonesia, with possible involvement of Indonesia s infrastructure guarantee facility. At the regional level, assessments of a number of projects are ongoing, including potential energy, transport, and urban (including special economic zone) projects in the Greater Mekong Subregion and Indonesia Malaysia Thailand Growth Triangle. Prospects for possible private participation in projects currently listed in the ADB pipeline have also been explored. Such consultations and preparations have confirmed a strong demand for additional PPP support in infrastructure sectors in Southeast Asia, as well as the need for sound project selection and structuring. Formal partnerships on the aforementioned 8 A working group of staff members can be established to further support the TA activities, since it is envisioned that the activities can involve different sectors across different countries in ASEAN. 9 The quality-based selection process will be used. This process has been recommended because of the complex nature of structuring PPP projects. Other methods of recruitment are to be tailored for this TA in consultation with the relevant departments in ADB. 10 Government agencies of the countries will be further consulted and their endorsement will be sought to engage in the TA activities. Further, as appropriate based on ADB guidelines, under the TA, reimbursement may be sought for costs of structuring support upon its financial closure.

7 4 prospects will be further explored after approval of this proposed major change to the TA in order to screen and possibly structure PPP transactions. 10. Intensive consultations were also conducted with stakeholders and partners to confirm possible cofinancing for this TA. Based on a strong interest to support PPP infrastructure projects that will contribute towards ASEAN s regional economic development as well as the ASEAN Economic Community 2015, Singapore (both as a shareholder of the ASEAN Infrastructure Fund, and as the chair of the ASEAN Working Committee on Capital Market Development) and the Government of Canada have committed additional resources to support this TA. At the ADB Annual Meeting in May 2013 in Delhi, the IES and SERD signed a letter of intent confirming the contribution of $4.5 million from the IES to support the TA. In parallel, following active communications with ADB, the Government of Canada also approved its cofinancing contribution of Can$4.5 million in July Separate cofinancing agreements will be executed between ADB and the IES and between ADB and the Government of Canada. Drafts of these agreements have been finalized and will be signed following the Board s approval of this proposed major change to the TA. Given the need to finalize the cofinancing agreements and the desire to consolidate all funding sources under the TA, the recruitment of consultants was postponed. However, significant progress has been made in identifying prospective projects for further analysis under the TA. Upon signing of the cofinancing agreements, consultants will be engaged to undertake screening and PPP structuring activities for the projects described in paragraph 9. IV. RATIONALE FOR THE PROPOSED CHANGES 12. These changes will enable the outputs originally envisaged to be scaled up and the impact and outcome to be broadened to encompass economic connectivity. With additional resources, at least six potential projects are expected to be screened, of which up to three are expected to receive structuring support under the TA. 11 The 18-month extension of the implementation schedule of the TA will allow for the delivery of outputs following the finalization of the cofinancing arrangements and launching of the project structuring support. Apart from increased outputs (revised performance indicators, and revised qualitative descriptions of outcomes and outputs), the assumptions and risks remain unchanged. The revised design and monitoring framework is in Appendix 1. The TA classification will remain unchanged. 13. The proposed changes are to accommodate the expected contribution of additional resources for the TA from the IES and the Government of Canada. They also reflect the necessary changes in implementation arrangements (including reporting requirements to the cofinanciers) to administer these additional resources. V. DUE DILIGENCE 14. To respond to additional due diligence needs for project screening and structuring, the estimated use of consultants has been revised upward to provide for around 190 person-months of international and 150 person-months of national consulting services (or the equivalents if 11 It should be noted that project structuring is capital intensive; therefore, most of the additional resources will be used to increase support for component 2 (project structuring support), which means that the output indicators do not increase proportionately with additional funding. Although it would vary from project to project, it has been estimated that around $2 million $3 million could be required for structuring support for each project, while the remainder would be utilized for pipeline development and other related activities.

8 5 firms are engaged). It is expected that the TA will also benefit from synergies with other infrastructure and/or PPP initiatives by providing knowledge-sharing platforms and knowledge products from its transaction advisory services. ADB policies and guidelines, including on procurement, consulting services, safeguards, and addressing gender issues, will be adhered to during TA administration and in project screening, prioritization, preparation, and structuring. Meanwhile, under the TA it will be ensured that the requirements of cofinanciers, including their possible participation in review missions and related activities, are met effectively. 12 Due attention will be given to disseminating the TA outputs, outcomes, and impacts, as well as to acknowledging the contributions of various cofinanciers and development partners. 13 A revised cost estimate and financing plan is included as a linked document, as specified in Appendix 2. VI. THE PRESIDENT'S RECOMMENDATION 15. The President recommends that the Board approve (i) (ii) (iii) the major changes in scope and implementation arrangements for Supporting Regional Project Development for Association of Southeast Asian Nations Connectivity, as described in para. 2; an increase in technical assistance (TA) amount for Supporting Regional Project Development for Association of Southeast Asian Nations Connectivity by $4,500,000, to be financed on a grant basis by the International Enterprise Singapore and administered by ADB, as described in para. 3; and an increase in TA amount for Supporting Regional Project Development for Association of Southeast Asian Nations Connectivity not exceeding the equivalent of Can$4,500,000, to be financed on a grant basis by the Government of Canada and administered by ADB, as described in para It is envisaged that, during the TA inception, further details for coordinating mechanisms between stakeholders will be developed to support the TA implementation more effectively, including timely consultation on major activities, project pipeline development, selection criteria of consultants, and possible secondment. All expenses of cofinanciers participation will be borne by themselves and not from the TA. 13 Detailed arrangements are included in respective cofinancing agreements complying with ADB Administering Grant-Financed Technical Assistance. Project Administration Instructions. PAI Manila.

9 6 Appendix 1 REVISED DESIGN AND MONITORING FRAMEWORK Design Summary Impact Greater economic connectivity in the ASEAN region Performance Targets and Indicators with Baselines Growth in trade and investment opportunities within the ASEAN region supported by sound infrastructure Data Sources and Reporting Mechanisms Reports from ASEAN, relevant governments and other development partners. Assumptions and Risks Assumptions Continued commitment to narrowing the development gap is a shared goal of all ASEAN countries. Outcome Increased investments from both public and private sectors into ASEAN infrastructure development and connectivity Outputs 1. Robust project screening and pipeline is established 2. Regional project structuring support for infrastructure Baseline: Intraregional trade share at 25.9% (2011) and intraregional cumulative foreign direct investment inflows at $49.6 billion (2009) Synergies between various key initiatives (and ASEAN member countries) as well as the private sector are fostered: (i) AIF to contain PPP projects in its pipeline by end of first half of 2017 (2012 baseline: 0) (ii) At least 2 3 PPP project structures to be initiated by the end of first half of 2017 (2012 baseline: 0) At least six priority projects that are potentially eligible for funding by the AIF (cofinanced by ADB) are proposed and screened by end of first half of 2017 (both sovereign and nonsovereign, and in ASEAN developing member countries or in subregional programs). Structuring work for up to three priority projects is initiated based on PPP financing and/or capital market instruments by end Reports from ASEAN, relevant governments, ADB and other development partners Semi-annual ADB reports and documentation of individual in-country and regional consultations Semi-annual ADB reports Sustained private sector interest in infrastructure development in ASEAN Risk Prolonged economic downturn could lead to a policy shift toward domestic economic concerns. Assumption ASEAN-wide objectives continue to be reflected in and consistent with national plans of ASEAN countries. Risk Policy shifts result in reluctance of relevant agencies to be involved in specific undertakings for a sustained period of time. Assumption Active participation of line agencies in program and project formulation Risks Intra-country bureaucratic barriers across government agencies Varying levels of cooperation among various stakeholders Assumption Regional cooperation and integration and accelerated regional growth remain a key national interest in

10 Appendix 1 7 Design Summary financing through PPP and capital market instruments is put into operation Performance Targets and Indicators with Baselines of first half of 2017 Up to three knowledge events or products (experience sharing workshops, policy briefs, etc.) delivered by end of first half of 2017 Data Sources and Reporting Mechanisms Assumptions and Risks ASEAN countries. Risk Adverse economic conditions dampen private sector participation and financing Activities with Milestones Output 1. Project Pipeline Screening 1.1 Propose potential projects in consultation with ASEAN governments by the fourth quarter of Launch project screening by the first half of 2014, led by the sector specialists 1.3 Identify additional potential projects in consultation with countries and subregional programs (GMS, IMT-GT, BIMP-EAGA) Include additional project screening for project structuring support by Conduct regular consultations with developing member countries to update and refine potential project proposals for project pipeline screening, Output 2. Regional PPP Structuring Support 2.1 Establish regional PPP structuring support in consultation with ASEAN stakeholders by the first quarter of Propose a set of potential projects for PPP financing (including through capital market instruments) by the second half of Initiate the necessary structuring work for at least one project by the first half of Continue to structure additional key infrastructure projects for the region, Inputs ADB (TASF-IV and RCIF): $1,500, Consultants: $1,375, Equipment: $5, Workshops, Training, Seminars, and Conferences: $25, Miscellaneous Administration and Support Cost: $15, Contingencies: $80, IES: $4,500, Consultants: $4,121, Equipment: $13, Workshops, Training, Seminars and Conferences: $77, Miscellaneous Administration and Support Costs: $45, Contingency: $244, Canada: $4,300, (Can$4,500,000 equivalent) 1. Consultants: $3,664, Equipment: $12, Workshops, Training, Seminars and Conferences: $68, Miscellaneous Administration and Support Costs: $40, Contingency: $516, ADB = Asian Development Bank, AIF = ASEAN Infrastructure Fund, ASEAN = Association of Southeast Asian Nations, BIMP-EAGA = Brunei Darussalam Indonesia Malaysia Philippines East ASEAN Growth Area, GMS = Greater Mekong Subregion, IES = International Enterprise Singapore, IMT-GT = Indonesia Malaysia Thailand Growth Triangle, PPP = public private partnership, RCIF = Regional Cooperation and Integration Fund. Source: Asian Development Bank.

11 8 Appendix 2 1. Revised Financing Plan LIST OF LINKED DOCUMENTS 2. Revised Outline Terms of Reference for Consultants

People s Republic of China: Improving Energy Efficiency, Emission Control, and Compliance Management of the Manufacturing Industry

People s Republic of China: Improving Energy Efficiency, Emission Control, and Compliance Management of the Manufacturing Industry Technical Assistance Report Project Number: 48005-001 Policy and Advisory Technical Assistance (PATA) October 2014 People s Republic of China: Improving Energy Efficiency, Emission Control, and Compliance

More information

Maldives: Strengthening Capacity for Operations Management

Maldives: Strengthening Capacity for Operations Management Completion Report Project Number: 45416-001 Technical Assistance Number: 8070 July 2018 Maldives: Strengthening Capacity for Operations Management This document is being disclosed to the public in accordance

More information

Assessing and Monitoring Social Protection Programs in Asia and the Pacific

Assessing and Monitoring Social Protection Programs in Asia and the Pacific Completion Report Project Number: 47215-001 Technical Assistance Number: 8677 February 2018 Assessing and Monitoring Social Protection Programs in Asia and the Pacific This document is being disclosed

More information

Mainstreaming Air Quality in Urban Development through South South Twinning

Mainstreaming Air Quality in Urban Development through South South Twinning Completion Report Project Number: 46250-001 Technical Assistance Number: 8751 March 2018 Mainstreaming Air Quality in Urban Development through South South Twinning This document is being disclosed to

More information

Mongolia: Enhancing the Use of Multiple Data Resources to Monitor Progress Towards the Sustainable Development Goals (SDGs)

Mongolia: Enhancing the Use of Multiple Data Resources to Monitor Progress Towards the Sustainable Development Goals (SDGs) Technical Assistance Report Project Number: 51397-001 Knowledge and Support Technical Assistance (KSTA) June 2018 Mongolia: Enhancing the Use of Multiple Data Resources to Monitor Progress Towards the

More information

Mongolia: Intelligent Transport Systems Development for Mongolia

Mongolia: Intelligent Transport Systems Development for Mongolia Technical Assistance Report Project Number: 48082-001 Policy and Advisory Technical Assistance (PATA) July 2016 Mongolia: Intelligent Transport Systems Development for Mongolia (Financed by the Republic

More information

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or April 2018 Quarterly Summary Report on Approved (A) Transaction Technical Assistance Not Exceeding $5,000,000; (B) Knowledge and Support Technical Assistance Projects Not Exceeding $225,000; and (C) Technical

More information

Technical Assistance Report. Assessment of Power Sector Reform in Asia and the Pacific

Technical Assistance Report. Assessment of Power Sector Reform in Asia and the Pacific Technical Assistance Report Project Number: 45240 Research and Development Technical Assistance (RDTA) November 2011 Assessment of Power Sector Reform in Asia and the Pacific The views expressed herein

More information

New Development Bank Technical Assistance Policy

New Development Bank Technical Assistance Policy New Development Bank Technical Assistance Policy Owner: Operations Division Version: 2016 V1 Approved Date: January 21, 2016 Technical Assistance Policy All rights reserved. Any unauthorized use, duplication

More information

Technical Assistance Reforms Improving the Speed, Relevance, and Quality of Technical Assistance Operations

Technical Assistance Reforms Improving the Speed, Relevance, and Quality of Technical Assistance Operations June 2017 Technical Assistance Reforms Improving the Speed, Relevance, and Quality of Technical Assistance Operations This document is being disclosed to the public in accordance with ADB s Public Communications

More information

Mongolia: Strengthening Systems for Promoting Science, Technology, and Innovation

Mongolia: Strengthening Systems for Promoting Science, Technology, and Innovation Technical Assistance Report Project Number: 51123-001 Knowledge and Support Technical Assistance (KSTA) September 2017 Mongolia: Strengthening Systems for Promoting Science, Technology, and Innovation

More information

Implementation of Sustainable Transport for All (Cofinanced by the Government of Austria)

Implementation of Sustainable Transport for All (Cofinanced by the Government of Austria) Technical Assistance Report Project Number: 50370-001 Knowledge and Support Technical Assistance (KSTA) November 2017 Implementation of Sustainable Transport for All (Cofinanced by the Government of Austria)

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.08 Page 1 of 3 TECHNICAL ASSISTANCE COMPLETION REPORT A. Objective and Scope 1. The main objective of preparing a technical assistance (TA) completion report (TCR)

More information

PROGRAMMING AND MODALITIES

PROGRAMMING AND MODALITIES CAPE PRC, Linked Document 4 PROGRAMMING AND MODALITIES A. Country Programming 1. The Asian Development Bank (ADB) and the People s Republic of China (PRC) hold joint country programming missions (CPMs)

More information

The Urbanization Poverty Inequality Triangle in Asia and the Pacific

The Urbanization Poverty Inequality Triangle in Asia and the Pacific Technical Assistance Report Project Number: 47109-001 Research and Development Technical Assistance (RDTA) December 2013 The Urbanization Poverty Inequality Triangle in Asia and the Pacific The views expressed

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE (SMALL AND MEDIUM-SIZED ENTERPRISE FINANCE AND LEASING) 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): FINANCE (SMALL AND MEDIUM-SIZED ENTERPRISE FINANCE AND LEASING) 1. Sector Performance, Problems, and Opportunities Second Small and Medium-Sized Enterprise Development Project (RRP BAN 36200) SECTOR ASSESSMENT (SUMMARY): FINANCE (SMALL AND MEDIUM-SIZED ENTERPRISE FINANCE AND LEASING) Sector Road Map 1. Sector Performance,

More information

Kingdom of Cambodia: Institutional Strengthening of the Cambodian National Petroleum Authority

Kingdom of Cambodia: Institutional Strengthening of the Cambodian National Petroleum Authority Technical Assistance Report Project Number: 40079 December 2006 Kingdom of Cambodia: Institutional Strengthening of the Cambodian National Petroleum Authority (Financed by the Japan Special Fund) The views

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:OTH 37670 TECHNICAL ASSISTANCE (Financed by the Poverty Reduction Cooperation Fund) FOR MAKING RESOURCE ALLOCATION PRO-POOR AND PARTICIPATORY IN THE PACIFIC June 2004 ABBREVIATIONS

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: OTH 37715 PROPOSED TECHNICAL ASSISTANCE (Cofinanced by the Poverty and Environment Fund) FOR THE POVERTY AND ENVIRONMENT PROGRAM November 2003 ABBREVIATIONS ADB Asian Development

More information

II. The mandates, activities and outputs of the Technology Executive Committee

II. The mandates, activities and outputs of the Technology Executive Committee TEC/2018/16/13 Technology Executive Committee 27 February 2018 Sixteenth meeting Bonn, Germany, 13 16 March 2018 Monitoring and evaluation of the impacts of the implementation of the mandates of the Technology

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 42024 Policy and Advisory Technical Assistance (PATA) December 2008 People s Republic of China: Preparing National Guidelines for Eco-Compensation in River Basins

More information

Bhutan: Adapting to Climate Change through Integrated Water Resources Management

Bhutan: Adapting to Climate Change through Integrated Water Resources Management Completion Report Project Number: 46463-002 Technical Assistance Number: 8623 August 2017 Bhutan: Adapting to Climate Change through Integrated Water Resources Management This document is being disclosed

More information

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO Brief to the Senate Standing Committee on Social Affairs, Science and Technology Dr. Eliot A. Phillipson President and CEO June 14, 2010 Table of Contents Role of the Canada Foundation for Innovation (CFI)...1

More information

UN Countries in the Flyway Partner Ramsar

UN Countries in the Flyway Partner Ramsar AIM OF THE REGIONAL INITIATIVE 1. How is it implementing the Ramsar approach? Describe briefly the operational means of your initiative to promote the objectives of the Convention and how your initiative

More information

TERMS OF REFERENCE FOR CONSULTANTS

TERMS OF REFERENCE FOR CONSULTANTS Strengthening Systems for Promoting Science, Technology, and Innovation (KSTA MON 51123) TERMS OF REFERENCE FOR CONSULTANTS 1. The Asian Development Bank (ADB) will engage 77 person-months of consulting

More information

Mongolia: Improved Registry System to Strengthen the Delivery of Social Services

Mongolia: Improved Registry System to Strengthen the Delivery of Social Services Technical Assistance Report Project Number: 51135-001 Knowledge and Support Technical Assistance (KSTA) September 2017 Mongolia: Improved Registry System to Strengthen the Delivery of Social Services This

More information

Statement by. H.E. Ina H. Krisnamurthi. Ambassador / Deputy Permanent Representative. of the Permanent Mission of the Republic of Indonesia

Statement by. H.E. Ina H. Krisnamurthi. Ambassador / Deputy Permanent Representative. of the Permanent Mission of the Republic of Indonesia (Please check against delivery) Statement by H.E. Ina H. Krisnamurthi Ambassador / Deputy Permanent Representative of the Permanent Mission of the Republic of Indonesia on behalf of the Association of

More information

10 th APEC TRANSPORTATION MINISTERIAL MEETING 7 th October 2017 Port Moresby, Papua New Guinea Ministerial Statement

10 th APEC TRANSPORTATION MINISTERIAL MEETING 7 th October 2017 Port Moresby, Papua New Guinea Ministerial Statement 10 th APEC TRANSPORTATION MINISTERIAL MEETING 7 th October 2017 Port Moresby, Papua New Guinea Ministerial Statement 1. We, the Ministers responsible for transportation, met in Port Moresby, Papua New

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section D12/BP Page 1 of 12 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction TECHNICAL ASSISTANCE 1.

More information

Committee on Development and Intellectual Property (CDIP)

Committee on Development and Intellectual Property (CDIP) E CDIP/10/13 ORIGINAL: ENGLISH DATE: OCTOBER 5, 2012 Committee on Development and Intellectual Property (CDIP) Tenth Session Geneva, November 12 to 16, 2012 DEVELOPING TOOLS FOR ACCESS TO PATENT INFORMATION

More information

Second APEC Ministers' Conference on Regional Science & Technology Cooperation (Seoul, Korea, Nov 13-14, 1996) JOINT COMMUNIQUÉ

Second APEC Ministers' Conference on Regional Science & Technology Cooperation (Seoul, Korea, Nov 13-14, 1996) JOINT COMMUNIQUÉ Second APEC Ministers' Conference on Regional Science & Technology Cooperation (Seoul, Korea, Nov 13-14, 1996) JOINT COMMUNIQUÉ 1. Ministers responsible for science and technology from Australia, Brunei

More information

Republic of Indonesia: Supporting Technological Transformation

Republic of Indonesia: Supporting Technological Transformation Technical Assistance Report Project Number: 51343-001 Knowledge and Support Technical Assistance (KSTA) December 2017 Republic of Indonesia: Supporting Technological Transformation This document is being

More information

TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project

TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project Expressway Operations Improvement Project (TRTA SRI 50299) I. Background TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project 1. The

More information

The 21 st APEC Small and Medium Enterprises Ministerial Meeting Joint Ministerial Statement. Nanjing, China September 5, 2014

The 21 st APEC Small and Medium Enterprises Ministerial Meeting Joint Ministerial Statement. Nanjing, China September 5, 2014 The 21 st APEC Small and Medium Enterprises Ministerial Meeting Joint Ministerial Statement Nanjing, China September 5, 2014 Innovation and Sustainability Introduction 1. We, the APEC Ministers and their

More information

APEC Internet and Digital Economy Roadmap

APEC Internet and Digital Economy Roadmap 2017/CSOM/006 Agenda Item: 3 APEC Internet and Digital Economy Roadmap Purpose: Consideration Submitted by: AHSGIE Concluding Senior Officials Meeting Da Nang, Viet Nam 6-7 November 2017 INTRODUCTION APEC

More information

Policy Partnership on Science, Technology and Innovation Strategic Plan ( ) (Endorsed)

Policy Partnership on Science, Technology and Innovation Strategic Plan ( ) (Endorsed) 2015/PPSTI2/004 Agenda Item: 9 Policy Partnership on Science, Technology and Innovation Strategic Plan (2016-2025) (Endorsed) Purpose: Consideration Submitted by: Chair 6 th Policy Partnership on Science,

More information

GENEVA COMMITTEE ON DEVELOPMENT AND INTELLECTUAL PROPERTY (CDIP) Fifth Session Geneva, April 26 to 30, 2010

GENEVA COMMITTEE ON DEVELOPMENT AND INTELLECTUAL PROPERTY (CDIP) Fifth Session Geneva, April 26 to 30, 2010 WIPO CDIP/5/7 ORIGINAL: English DATE: February 22, 2010 WORLD INTELLECTUAL PROPERT Y O RGANI ZATION GENEVA E COMMITTEE ON DEVELOPMENT AND INTELLECTUAL PROPERTY (CDIP) Fifth Session Geneva, April 26 to

More information

Review of Technical Assistance Special Fund Operations Measures for Improving Effectiveness

Review of Technical Assistance Special Fund Operations Measures for Improving Effectiveness ASIAN DEVELOPMENT FUND (ADF) ADF X MIDTERM REVIEW MEETING Review of Technical Assistance Special Fund Operations Measures for Improving Effectiveness October 21 ABBREVIATIONS ADB Asian Development Bank

More information

February Annual Report of the e-asia and Knowledge Partnership Fund 2016

February Annual Report of the e-asia and Knowledge Partnership Fund 2016 February 2017 Annual Report of the e-asia and Fund 2016 ABBREVIATIONS ADB Asian Development Bank ASEAN Association of Southeast Asian Nations BIMP-EAGA Brunei-Indonesia-Malaysia-Philippines East Asia

More information

The 26 th APEC Economic Leaders Meeting

The 26 th APEC Economic Leaders Meeting The 26 th APEC Economic Leaders Meeting PORT MORESBY, PAPUA NEW GUINEA 18 November 2018 The Chair s Era Kone Statement Harnessing Inclusive Opportunities, Embracing the Digital Future 1. The Statement

More information

2010/3 Science and technology for development. The Economic and Social Council,

2010/3 Science and technology for development. The Economic and Social Council, Resolution 2010/3 Science and technology for development The Economic and Social Council, Recalling the 2005 World Summit Outcome, which emphasizes the role of science and technology, including information

More information

November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS

November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS Note: At the joint meeting of the CTF and SCF Trust Fund Committees held on November 3, 2011, the meeting reviewed the

More information

Islamic Republic of Afghanistan: Gas Development Master Plan

Islamic Republic of Afghanistan: Gas Development Master Plan Technical Assistance Report Project Number: 47018-001 Policy and Advisory Technical Assistance (PATA) July 2013 Islamic Republic of Afghanistan: Gas Development Master Plan (Cofinanced by the Afghanistan

More information

I. Introduction. Cover note. A. Mandate. B. Scope of the note. Technology Executive Committee. Fifteenth meeting. Bonn, Germany, September 2017

I. Introduction. Cover note. A. Mandate. B. Scope of the note. Technology Executive Committee. Fifteenth meeting. Bonn, Germany, September 2017 Technology Executive Committee 31 August 2017 Fifteenth meeting Bonn, Germany, 12 15 September 2017 Draft TEC and CTCN inputs to the forty-seventh session of the Subsidiary Body for Scientific and Technological

More information

University of Massachusetts Amherst Libraries. Digital Preservation Policy, Version 1.3

University of Massachusetts Amherst Libraries. Digital Preservation Policy, Version 1.3 University of Massachusetts Amherst Libraries Digital Preservation Policy, Version 1.3 Purpose: The University of Massachusetts Amherst Libraries Digital Preservation Policy establishes a framework to

More information

The UNISDR Global Science & Technology Advisory Group for the implementation of the Sendai Framework for Disaster Risk Reduction UNISDR

The UNISDR Global Science & Technology Advisory Group for the implementation of the Sendai Framework for Disaster Risk Reduction UNISDR The UNISDR Global Science & Technology Advisory Group for the implementation of the Sendai Framework for Disaster Risk Reduction 2015-2030 UNISDR 1. Background - Terms of Reference - February 2018 The

More information

Fielding of Consultants 04 September November February July 2004

Fielding of Consultants 04 September November February July 2004 TECHNICAL ASSISTANCE COMPLETION REPORT Division: AFRM TA No. and Name TA: AFG 3875: Disaster Preparedness and Management Capacity Building Executing Agency: Source of Funding: TASF Department of Disaster

More information

UN GA TECHNOLOGY DIALOGUES, APRIL JUNE

UN GA TECHNOLOGY DIALOGUES, APRIL JUNE UN GA TECHNOLOGY DIALOGUES, APRIL JUNE 2014 Suggestions made by participants regarding the functions of a possible technology facilitation mechanism Background document by the Secretariat for the fourth

More information

5 TH MANAGEMENT SEMINARS FOR HEADS OF NATIONAL STATISTICAL OFFICES (NSO) IN ASIA AND THE PACIFIC SEPTEMBER 2006, DAEJEON, REPUBLIC OF KOREA

5 TH MANAGEMENT SEMINARS FOR HEADS OF NATIONAL STATISTICAL OFFICES (NSO) IN ASIA AND THE PACIFIC SEPTEMBER 2006, DAEJEON, REPUBLIC OF KOREA Malaysia 5 TH MANAGEMENT SEMINARS FOR HEADS OF NATIONAL STATISTICAL OFFICES (NSO) IN ASIA AND THE PACIFIC. 18 20 SEPTEMBER 2006, DAEJEON, REPUBLIC OF KOREA 1. Overview of the Population and Housing Census

More information

Traditional & Alternative Business Models for SME Financing in Asia

Traditional & Alternative Business Models for SME Financing in Asia Traditional & Alternative Business Models for SME Financing in Asia ESCAP Workshop on SME Access to Finance and the Role of Development Banks in Asia and the Pacific and Latin America Session 3 27 September

More information

(Cofinanced by the Global Road Safety Partnership)

(Cofinanced by the Global Road Safety Partnership) Technical Assistance Report Project Number: 36458 November 2005 Technical Assistance People s Republic of China: Road Safety Improvement (Cofinanced by the Global Road Safety Partnership) The views expressed

More information

Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session

Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session Resolution II/4 on Emerging policy issues A Introduction Recognizing the

More information

This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011.

This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. Technical Assistance Report Project Number: 49049-001 Regional Research and Development Technical Assistance (R-RDTA) September 2016 Promoting Smart Systems in ADB s Future Cities Program This document

More information

STRATEGIC ORIENTATION FOR THE FUTURE OF THE PMR:

STRATEGIC ORIENTATION FOR THE FUTURE OF THE PMR: STRATEGIC ORIENTATION FOR THE FUTURE OF THE PMR: ALEXANDER LOTSCH, FCPF SECRETARIAT ADRIEN DE BASSOMPIERRE, PMR SECRETARIAT PRICING CARBON AND SHAPING THE NEXT GENERATION OF CARBON MARKETS Context Strategic

More information

IV/10. Measures for implementing the Convention on Biological Diversity

IV/10. Measures for implementing the Convention on Biological Diversity IV/10. Measures for implementing the Convention on Biological Diversity A. Incentive measures: consideration of measures for the implementation of Article 11 Reaffirming the importance for the implementation

More information

GOVERNING BODY MEETING in Public 25 April 2018 Agenda Item 3.2

GOVERNING BODY MEETING in Public 25 April 2018 Agenda Item 3.2 GOVERNING BODY MEETING in Public 25 April 2018 Paper Title Paper Author(s) Jerry Hawker Accountable Officer NHS Eastern Cheshire CCG The Future of CCG Commissioning in Cheshire Alison Lee Accountable Officer

More information

United Nations Framework Convention on Climate Change UNFCCC EXPERT GROUP ON TECHNOLOGY TRANSFER FIVE YEARS OF WORK

United Nations Framework Convention on Climate Change UNFCCC EXPERT GROUP ON TECHNOLOGY TRANSFER FIVE YEARS OF WORK United Nations Framework Convention on Climate Change UNFCCC EXPERT GROUP ON TECHNOLOGY TRANSFER FIVE YEARS OF WORK BACKGROUND Within the UNFCCC process Parties have taken decisions to promote the development

More information

Sri Lanka: Technical Assistance for Water Supply and Sanitation

Sri Lanka: Technical Assistance for Water Supply and Sanitation Performance Evaluation Report Sri Lanka: Technical Assistance for Water Supply and Sanitation Independent Evaluation Raising development impact through evaluation Performance Evaluation Report June 2016

More information

Leapfrogging of Clean Technology in Central Asia Regional Economic Cooperation Countries through Market Transformation

Leapfrogging of Clean Technology in Central Asia Regional Economic Cooperation Countries through Market Transformation Technical Assistance Report Project Number: 49413-001 Regional Capacity Development Technical Assistance (R-CDTA) February 2017 Leapfrogging of Clean Technology in Central Asia Regional Economic Cooperation

More information

PROGRESS IN BUSINESS MODEL TRANSFORMATION

PROGRESS IN BUSINESS MODEL TRANSFORMATION PROGRESS IN BUSINESS MODEL TRANSFORMATION PART 1 CREATING VALUE The Fujitsu Group, striving to create new value in the Internet of Things (IoT) era, is working to realign its business structure toward

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the project Country: The Socialist Republic of Viet Nam Project: Hoa Lac Science and Technology City Development Project (II) Loan

More information

Establishing a Development Agenda for the World Intellectual Property Organization

Establishing a Development Agenda for the World Intellectual Property Organization 1 Establishing a Development Agenda for the World Intellectual Property Organization to be submitted by Brazil and Argentina to the 40 th Series of Meetings of the Assemblies of the Member States of WIPO

More information

Rolling workplan of the Technology Executive Committee for

Rolling workplan of the Technology Executive Committee for Technology Eecutive Committee Anne Rolling workplan of the Technology Eecutive Committee for 2016 2018 I. Introduction 1. Technology development and transfer is one the pillars of the UNFCCC. In 2010 in

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: General 18 December 2017 Original: English Statistical Commission Forty-ninth session 6 9 March 2018 Item 4 (a) of the provisional agenda* Items for information:

More information

The 45 Adopted Recommendations under the WIPO Development Agenda

The 45 Adopted Recommendations under the WIPO Development Agenda The 45 Adopted Recommendations under the WIPO Development Agenda * Recommendations with an asterisk were identified by the 2007 General Assembly for immediate implementation Cluster A: Technical Assistance

More information

The Report on The International Conference of Investment and Business Opportunities during the Post-Sanctions Era in Iran

The Report on The International Conference of Investment and Business Opportunities during the Post-Sanctions Era in Iran The Report on The International Conference of Investment and Business Opportunities during the Post-Sanctions Era in Iran July 26 & 27, 2016 Kuala Lumpur, Malaysia, MIDA Considering the importance and

More information

SMEs Development: Vietnamese Experience

SMEs Development: Vietnamese Experience SMEs Development: Vietnamese Experience Presenter: Dr. CAN Van Luc at the Conference on APEC s Post 2020 Agenda: Rising Protectionism, Economic Rebalancing and Diversified Growth Session 2: Micro Competitiveness,

More information

Islamic Republic of Pakistan: Enabling Economic Corridors through Sustainable Transport Sector Development

Islamic Republic of Pakistan: Enabling Economic Corridors through Sustainable Transport Sector Development Technical Assistance Report Project Number: 49063-001 Capacity Development Technical Assistance (CDTA) October 2015 Islamic Republic of Pakistan: Enabling Economic Corridors through Sustainable Transport

More information

Building Sustainable and Resilient Communities

Building Sustainable and Resilient Communities 2015/SOM1/EPWG/032 Agenda Item: 8.6 Building Sustainable and Resilient Communities Purpose: Information Submitted by: China 7 th Emergency Preparedness Working Group Meeting Subic, Philippines 28-29 January

More information

Chapter 11 Cooperation, Promotion and Enhancement of Trade Relations

Chapter 11 Cooperation, Promotion and Enhancement of Trade Relations Chapter 11 Cooperation, Promotion and Enhancement of Trade Relations Article 118: General Objective 1. The objective of this Chapter is to establish a framework and mechanisms for present and future development

More information

JOINT CTF-SCF/TFC.15/3 November 2, Joint Meeting of the CTF and SCF Trust Fund Committees Washington, D.C. Monday, November 9, 2015

JOINT CTF-SCF/TFC.15/3 November 2, Joint Meeting of the CTF and SCF Trust Fund Committees Washington, D.C. Monday, November 9, 2015 Joint Meeting of the CTF and SCF Trust Fund Committees Washington, D.C. Monday, November 9, 2015 JOINT CTF-SCF/TFC.15/3 November 2, 2015 Agenda Item 3 CLIMATE INVESTMENT FUNDS: ACCOMPLISHMENTS, TRANSFORMATIONAL

More information

Science, Technology & Innovation Policy: A Global Perspective. Dr Lauren Palmer Australian Academy of Technological Sciences & Engineering (ATSE)

Science, Technology & Innovation Policy: A Global Perspective. Dr Lauren Palmer Australian Academy of Technological Sciences & Engineering (ATSE) A presentation from the conference 9-10 Dec 2013 Science, Technology & Innovation Policy: A Global Perspective Dr Lauren Palmer Australian Academy of Technological Sciences & Engineering (ATSE) Science,

More information

DBS GROUP HOLDINGS LTD. 15 th Annual General Meeting & Extraordinary General Meeting. 28 April 2014

DBS GROUP HOLDINGS LTD. 15 th Annual General Meeting & Extraordinary General Meeting. 28 April 2014 DBS GROUP HOLDINGS LTD 15 th Annual General Meeting & Extraordinary General Meeting 28 April 2014 1 Creating Shared Value Piyush Gupta, Chief Executive Officer April 28, 2014 Disclaimer: The information

More information

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY AT ITS TENTH MEETING

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY AT ITS TENTH MEETING CBD Distr. GENERAL UNEP/CBD/COP/DEC/X/24 29 October 2010 ORIGINAL: ENGLISH CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY Tenth meeting Nagoya, Japan, 18-29 October 2010 Agenda item

More information

Technology Executive Committee

Technology Executive Committee Technology Executive Committee TEC/2016/13/14 22 August 2016 I. Background Thirteenth meeting of the Technology Executive Committee United Nations Campus (AHH building), Bonn, Germany 6-9 September 2016

More information

WIPO Development Agenda

WIPO Development Agenda WIPO Development Agenda 2 The WIPO Development Agenda aims to ensure that development considerations form an integral part of WIPO s work. As such, it is a cross-cutting issue which touches upon all sectors

More information

NZFSA Policy on Food Safety Equivalence:

NZFSA Policy on Food Safety Equivalence: NZFSA Policy on Food Safety Equivalence: A Background Paper June 2010 ISBN 978-0-478-33725-9 (Online) IMPORTANT DISCLAIMER Every effort has been made to ensure the information in this report is accurate.

More information

CO-ORDINATION MECHANISMS FOR DIGITISATION POLICIES AND PROGRAMMES:

CO-ORDINATION MECHANISMS FOR DIGITISATION POLICIES AND PROGRAMMES: CO-ORDINATION MECHANISMS FOR DIGITISATION POLICIES AND PROGRAMMES: NATIONAL REPRESENTATIVES GROUP (NRG) SUMMARY REPORT AND CONCLUSIONS OF THE MEETING OF 10 DECEMBER 2002 The third meeting of the NRG was

More information

MEASURES TO INCREASE THE EFFICIENCY OF CIF COMMITTEES. CTF-SCF/TFC.11/7/Rev.1 January 27, 2014

MEASURES TO INCREASE THE EFFICIENCY OF CIF COMMITTEES. CTF-SCF/TFC.11/7/Rev.1 January 27, 2014 MEASURES TO INCREASE THE EFFICIENCY OF CIF COMMITTEES CTF-SCF/TFC.11/7/Rev.1 January 27, 2014 I. INTRODUCTION 1. At the May 2013 CIF Committee meetings, the CIF Administrative Unit was requested to give

More information

ASEAN MINERALS COOPERATION ACTION PLAN Dynamic Mineral Sector Initiatives for a Prosperous ASEAN

ASEAN MINERALS COOPERATION ACTION PLAN Dynamic Mineral Sector Initiatives for a Prosperous ASEAN ASEAN MINERALS COOPERATION ACTION PLAN 2011-2015 Dynamic Mineral Sector Initiatives for a Prosperous ASEAN PROGRAMMES, PROJECTS AND ACTIVITIES AND TIMELINES Strategy 1: Facilitating and Enhancing Trade

More information

DRAFT TEXT on. Version 2 of 9 September 13:00 hrs

DRAFT TEXT on. Version 2 of 9 September 13:00 hrs DRAFT TEXT on SBSTA 48.2 agenda item 5 Development and transfer of technologies: Technology framework under Article 10, paragraph 4, of the Paris Agreement Version 2 of 9 September 13:00 hrs Elements of

More information

Item 4.2 of the Draft Provisional Agenda COMMISSION ON GENETIC RESOURCES FOR FOOD AND AGRICULTURE

Item 4.2 of the Draft Provisional Agenda COMMISSION ON GENETIC RESOURCES FOR FOOD AND AGRICULTURE November 2003 CGRFA/WG-PGR-2/03/4 E Item 4.2 of the Draft Provisional Agenda COMMISSION ON GENETIC RESOURCES FOR FOOD AND AGRICULTURE WORKING GROUP ON PLANT GENETIC RESOURCES FOR FOOD AND AGRICULTURE Second

More information

ASEAN Vision A Concert of Southeast Asian Nations

ASEAN Vision A Concert of Southeast Asian Nations ASEAN Vision 2020 We, the Heads of State/Government of the Association of Southeast Asian Nations, gather today in Kuala Lumpur to reaffirm our commitment to the aims and purposes of the Association as

More information

British Columbia s Environmental Assessment Process

British Columbia s Environmental Assessment Process British Columbia s Environmental Assessment Process Seminar #2 Guide for Aboriginal Groups and the General Public on the BC Environmental Assessment Process February 23, 2016 Paul Craven About the BC Environmental

More information

GreenEcoNet Annual Conference

GreenEcoNet Annual Conference GreenEcoNet Annual Conference Growing a sustainable EU economy through SMEs: Boosting jobs, growth and entrepreneurship Brussels, 27 May 2015 Venue: CEPS, Place du Congrès 1, 1000 Brussels Job creation

More information

National Agreement on the Circular Economy. Letter of intent to develop transition agendas for the Circular Economy together

National Agreement on the Circular Economy. Letter of intent to develop transition agendas for the Circular Economy together National Agreement on the Circular Economy Letter of intent to develop transition agendas for the Circular Economy together Partners The drafting partners of this agreement are: VNO-NCW (Confederation

More information

TERMS OF REFERENCE. Preparation of a Policymakers Handbook on E-Commerce and Digital Trade for LDCs, small states and Sub-Saharan Africa

TERMS OF REFERENCE. Preparation of a Policymakers Handbook on E-Commerce and Digital Trade for LDCs, small states and Sub-Saharan Africa TERMS OF REFERENCE Reference: Post Title: NBCWG0923 Preparation of a Policymakers Handbook on E-Commerce and Digital Trade for LDCs, small states and Sub-Saharan Africa Project Location: home-based with

More information

APSEC President s Report

APSEC President s Report 2015/EWG49/008 Agenda Item: 5a APSEC President s Report Purpose: Information Submitted by: APSEC 49 th Energy Working Group Meeting Gyeongju, Korea 22 26 June 2015 Report on APEC Sustainable Energy Center

More information

GENEVA WIPO GENERAL ASSEMBLY. Thirty-First (15 th Extraordinary) Session Geneva, September 27 to October 5, 2004

GENEVA WIPO GENERAL ASSEMBLY. Thirty-First (15 th Extraordinary) Session Geneva, September 27 to October 5, 2004 WIPO WO/GA/31/11 ORIGINAL: English DATE: August 27, 2004 WORLD INTELLECTUAL PROPERT Y O RGANI ZATION GENEVA E WIPO GENERAL ASSEMBLY Thirty-First (15 th Extraordinary) Session Geneva, September 27 to October

More information

DISCUSSION PAPER ON THE NEXT PHASE OF THE PARTNERSHIP FOR MARKET READINESS (PMR) PMR Note PA

DISCUSSION PAPER ON THE NEXT PHASE OF THE PARTNERSHIP FOR MARKET READINESS (PMR) PMR Note PA DISCUSSION PAPER ON THE NEXT PHASE OF THE PARTNERSHIP FOR MARKET READINESS (PMR) PMR Note PA16-2017-3 March 6, 2017 I. INTRODUCTION 1. The Partnership for Market Readiness ( PMR ) Partnership Assembly

More information

Infrastructure services for private sector development (P) Project

Infrastructure services for private sector development (P) Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Updated Project Information Document () Report No: 30298 Project Name CROATIA - Croatia

More information

U.S. Department of Treasury / USAID. Sustaining and Accelerating the Growth of Renewable Energy Markets in Southeast Asia: Lessons from the Field

U.S. Department of Treasury / USAID. Sustaining and Accelerating the Growth of Renewable Energy Markets in Southeast Asia: Lessons from the Field U.S. Department of Treasury / USAID Sustaining and Accelerating the Growth of Renewable Energy Markets in Southeast Asia: Lessons from the Field Overview 7 June 2016, Tuesday, 9-10:30am 6 ADB Avenue, Mandaluyong

More information

ASEAN Regulatory Harmonisation and Approval Process

ASEAN Regulatory Harmonisation and Approval Process ASEAN Regulatory Harmonisation and Approval Process Selvaraja Seerangam National Pharmaceutical Control Bureau Ministry of Health Malaysia Open Forum on Key Issues on TB Drug Development- 18-19 August

More information

Committee on Development and Intellectual Property (CDIP)

Committee on Development and Intellectual Property (CDIP) E CDIP/13/8 ORIGINAL: ENGLISH DATE: MAY 2, 2014 Committee on Development and Intellectual Property (CDIP) Thirteenth Session Geneva, May 19 to 23, 2014 INTELLECTUAL PROPERTY AND TOURISM: SUPPORTING DEVELOPMENT

More information

Background and Purpose of the Research Project

Background and Purpose of the Research Project Chapter 1 Background and Purpose of the Research Project March 2016 This chapter should be cited as ERIA (2017), Background and Purpose of the Research Project, in Mizunoura, K. (ed.), Accounting Standards

More information

People s Republic of Bangladesh: Enabling Poor Women's Benefits from Enhanced Access to Energy in Hatiya Island

People s Republic of Bangladesh: Enabling Poor Women's Benefits from Enhanced Access to Energy in Hatiya Island Technical Assistance Report Project Number: 48432-001 Capacity Development Technical Assistance (CDTA) July 2015 People s Republic of Bangladesh: Enabling Poor Women's Benefits from Enhanced Access to

More information

Draft executive summaries to target groups on industrial energy efficiency and material substitution in carbonintensive

Draft executive summaries to target groups on industrial energy efficiency and material substitution in carbonintensive Technology Executive Committee 29 August 2017 Fifteenth meeting Bonn, Germany, 12 15 September 2017 Draft executive summaries to target groups on industrial energy efficiency and material substitution

More information

Investor Presentation. November 2018

Investor Presentation. November 2018 Investor Presentation November 2018 KKR Today Private Markets Public Markets Capital Markets Principal Activities $104bn AUM $91bn AUM Global Franchise $19bn of Assets $81bn Private Equity, Growth Equity

More information

April Annual Report of the e-asia and Knowledge Partnership Fund 2014

April Annual Report of the e-asia and Knowledge Partnership Fund 2014 April 2015 Annual Report of the e-asia and Knowledge Fund 2014 ABBREVIATIONS ADB Asian Development Bank ASEAN Association of Southeast Asian Nations BIMP-EAGA Brunei-Indonesia-Malaysia-Philippines East

More information

Proposed Accounting Standards Update: Financial Services Investment Companies (Topic 946)

Proposed Accounting Standards Update: Financial Services Investment Companies (Topic 946) February 13, 2012 Financial Accounting Standards Board Delivered Via E-mail: director@fasb.org Re: File Reference No. 2011-200 Proposed Accounting Standards Update: Financial Services Investment Companies

More information