1 Maasvlakte CCS Project - ROAD European CCS Demonstration Project Network Meeting Rotterdam, May 10, 2011 Hans Schoenmakers Project Director ROAD
2 Permits for a CCS project Power Plant Capture Plant Transport Storage Permit to construct and operate power plant Permit to modify existing plant Environmental Permits Water abstraction license Building permit capture plant Environmental Impact Assessment Environmental Permits Assessment of pipeline routing Consents from landowners Pipeline Works Authorisation Exploration permit Drilling permits Environmental Impact Assessment Storage permit Consents from land owners Page 2
3 Organization ROAD Board Capture Transport & Storage Stakeholder Management Project Office Permitting Communication & Public Engagement Regulatory Framework Funding Agreements Knowledge Dissemination Primarily relevant for permits Page 3
4 The Maasvlakte CCS Project - ROAD Maasvlakte Power Plant 3 CO 2 Capture Plant Compression and Cooling dehydration, O 2 -removal, Metering Onshore Transport Pipeline Offshore Transport Subsea Pipeline Metering P18 A Platform 5 km 20 km 3,5 km Start of CCS scope This flow diagram is not on scale CO 2 Storage into depleted gas reservoirs Page 4
5 Locations and pipeline trace's Page 5
6 How to obtain the necessary environmental permits for an offshore CCS Project Five steps: 1. Completing the overview of procedures Getting an overview of the formal procedures, the authorities and the first estimate scheduling of the procedures (permits, including conditions for an EIA and spatial planning) 2. Preparing the documents Draft versions prepared by the companies, aligned with technology and equipment supplier and reviewed by the authorities, to make sure the documents meet all requirements 3. Formal procedures Authorities, including the EIA committee, consider/handle all submitted requests and after public consultation decide on the permit conditions and updated spatial planning 4. Since this whole chain is the first of its kind, the EIA committee has advised a preliminary check ( Voortoets ) on completeness and compliance with earlier directions. This informal stage takes additional time (2 months) but is also supported by ROAD 5. Legal procedures After permits have been granted, legal procedures can be expected. Court procedures may take a long time but - taking the preparations into account - there is no fear of losing the permit Page 6
7 Applicants environmental permits Capture Transpor t Storage Maasvlakte CCS Project (ROAD) Coordinated by Page 7
8 Scheduling issues The scheduling of the project is determined by several technical and non-technical conditions: Starting date CCS operational 2015, first on-site building activities mid 2012 Building period expected to be 2,5 years Period for result form legal procedures not clear FID when risks and requirements are 80-90% clear (permit must be acquired, but need not to be irrevocable yet) Spatial planning adjustments by the authorities Scheduling leaves uncertainties: Getting permits as quick as possible Feedback of parties involved (direct stakeholders and public) is required Authorities take the safe route Page 8
9 Scheduling lessons learned Keeping the pressure on all parties involved Maintaining a very tight time schedule to motivate authorities to take action and make decisions Starting with first rough draft versions to get feedback The tight time schedule of the Grant Agreement can be used to motivate parties involved Showing that the project does everything within its power to reach the deadlines. Take the initiative in all meetings Supporting authorities with technical help to fulfill their obligations Keep everybody involved and do not take over responsibilities Accept authorities taking the safe route (accuracy more important than speed!) Page 9
10 Design issues Technical information The FEED (basic engineering) for the project was completed in an early stage. However, not all technical (detailed) information (on emissions) was available Because this is the first time a large scale CCS project is designed, there are few standards available (pilots give some information but are not always trustworthy for scale-up) This means that it is difficult to fill in permit applications early in the procedure It would be more pragmatic to get permits and being allowed to adjust later on, within established limits Page 10
11 Permits Lessons learned Supporting the authorities There is substantial knowledge on CCS and the rules with the initiator. Sharing this information with authorities leads to mutual understanding and a combined idea of the way forward. This may seem clear from the start, but a lessons learned is that this still takes a lot of time and number of meeting to achieve Resources are often lacking with the authorities. The more the initiator prepares the better the authorities will be able to fulfill their commitments Agree on getting the permits in more general terms, keeping open the opportunity to adjust when detailed design information is available (not always possible and makes permit more vulnerable) Page 11
12 ROAD s Regulatory context and the storage permit Four levels of regulation (for sub-surface CO 2 -storage) E.U. Directive (and Guidelines) National Act (Amendment of Mijnbouw wet) ( Enabler ) Ministerial Decree ( Hook ) Storage permit ( Tailor Made ) Page 12
Re-use & Decommissioning in The Netherlands: A Joint Effort
EUOAG Meeting Re-use & Decommissioning in The Netherlands: A Joint Effort 20 September 2017 Content Introduction EBN & NOGEPA Netherlands re-use & decommissioning landscape Netherlands Masterplan for Decommissioning
More informationKinsale Area Gas Fields Decommissioning Project Information Leaflet
Kinsale Area s Decommissioning Project Information Leaflet About Kinsale Energy PSE Kinsale Energy Limited has been operating a number of gas fields in the Celtic Sea, off the County Cork coast, since
More informationAPI COPM CPMA Chapter 20.X
API COPM CPMA Chapter 20.X David Courtney Pamela Chacon Matt Zimmerman Dan Cutting 24 23 February 2017 Houston, TX Copyright 2017, Letton Hall Group. This paper was developed for the UPM Forum, 22 23 February
More informationOffshore Construction Management Services. Capability & Experience
Offshore Construction Management Services Capability & Experience Capability Overview INTECSEA has a proven track record for providing solutions to problems faced when implementing frontier projects, by
More informationGIE response to public consultation Interoperability NC of ENTSOG
Ref 13GIE052 April 2013 GIE response to public consultation Interoperability NC of ENTSOG Who is GIE? Gas Infrastructure Europe (GIE) is an association representing the sole interest of the infrastructure
More informationTowards Code of Conduct on Processing of Personal Data for Purposes of Scientific Research in the Area of Health
Towards Code of Conduct on Processing of Personal Data for Purposes of Scientific Research in the Area of Health 19/4/2017 BBMRI-ERIC WHAT HAPPENED SO FAR? 2 2015-2016 Holding a Day of Action on the draft
More information25 July 2017 Without prejudice [PROVISIONS IN RELATION TO TRADE IN GOODS ALREADY INCLUDED IN THE EU TEXT PROPOSAL FOR THE TRADE IN GOODS CHAPTER]
25 July 2017 Without prejudice This document is the European Union's (EU) proposal for legal text provisions on energy and raw materials in the EU-Indonesia FTA. It will be tabled for discussion with Indonesia.
More informationJune Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design
June 2013 Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design Executive Summary A vendor pre-project design review of a new nuclear power plant provides an
More informationOffice for Nuclear Regulation
Office for Nuclear Regulation Redgrave Court Merton Road Bootle Merseyside L20 7HS www.hse.gov.uk/nuclear PROJECT ASSESSMENT REPORT Report Identifier: ONR-Policy-all-PAR-11-001 Revision: 2 Project: Implementation
More informationThe Norwegian Context PTIL/PSA 1
The Norwegian Context 1 Some fast facts about Norway s petroleum industry Oil and gas is Norway s largest industry today Net cash flow from the petroleum industry is 26% of GNP (2012) 40 years of operations
More informationOffshore Grid Development in the North Seas ENTSO-E views
Offshore Grid Development in the North Seas ENTSO-E views European Network of Transmission System Operators for Electricity Offshore Grid Development in the North Seas Country The connection and integration
More informationMEASURES TO INCREASE THE EFFICIENCY OF CIF COMMITTEES. CTF-SCF/TFC.11/7/Rev.1 January 27, 2014
MEASURES TO INCREASE THE EFFICIENCY OF CIF COMMITTEES CTF-SCF/TFC.11/7/Rev.1 January 27, 2014 I. INTRODUCTION 1. At the May 2013 CIF Committee meetings, the CIF Administrative Unit was requested to give
More informationNational Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy
National Grid s commitments when undertaking works in the UK Our stakeholder, community and amenity policy Introduction This document describes the ten commitments we have made to the way we carry out
More informationASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia
ASX Release 20 April 2018 Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia ADX Energy Ltd (ASX: ADX) are pleased to advise that the Tunisian national oil company ETAP has requested
More informationBay du Nord Framework Agreement
Bay du Nord Framework Agreement Technical Briefing Department of Natural Resources July 2018 1 Outline Project Overview Fiscal and Equity Terms NL Benefits Next Steps 2 Project Overview Location Flemish
More informationNovember 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS
November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS Note: At the joint meeting of the CTF and SCF Trust Fund Committees held on November 3, 2011, the meeting reviewed the
More informationNER300 Offshore Wind Park Nordsee One. Tobias Griesshaber Shareholder representative of Innogy SE on behalf of project Nordsee One GmbH
NER300 Offshore Wind Park Nordsee One Tobias Griesshaber Shareholder representative of Innogy SE on behalf of project Nordsee One GmbH Brussels, 15 December 2017 1 Agenda General project overview & timeline
More informationCompact subsea gas compression solution for maximized recovery
Compact subsea gas compression solution for maximized recovery Aberdeen, 6 th February 2014 Marco Gabelloni Senior engineer 2014 Aker Solutions Why subsea gas compression Gas fields require boosting of
More informationModels for the future operations of the CIF. Mafalda Duarte Program Manager, CIF 17 Nov, 2014
Models for the future operations of the CIF Mafalda Duarte Program Manager, CIF 17 Nov, 2014 IPCC AR5 Synthesis Report What is the problem? Humans are changing the climate It is extremely likely that we
More informationBROWSE BASIN NORTH-WEST AUSTRALIA
Consultation Information Sheet October 2018 PROPOSED BROWSE TO NORTH WEST SHELF DEVELOPMENT ENVIRONMENTAL REFERRAL BROWSE BASIN NORTH-WEST AUSTRALIA Key Information + + In September 2018, the Browse Joint
More informationNational Grid Gas Transmission (NGGT) Gas Quality Consultation Questions - Draft
National Grid Gas Transmission (NGGT) Gas Quality Consultation Questions - Draft Existing NTS Entry Connections 1. Do you expect the number of requests by existing NTS entry parties to amend gas quality
More informationBioTrade and the Implementation of the Nagoya Protocol
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN Soil and Biotechnology Division BioTrade and the Implementation of the Nagoya Protocol
More informationProposed Changes to the ASX Listing Rules How the Changes Will Affect New Listings and Disclosure for Mining and Oil & Gas Companies
Proposed Changes to the ASX Listing Rules How the Changes Will Affect New Listings and Disclosure for Mining and Oil & Gas Companies ASX has recently issued two releases that may result in amendments to
More informationChapter 1 Introduction
Chapter 1 Introduction TABLE OF CONTENTS 1 INTRODUCTION...1-2 1.1 General...1-2 1.2 Background to the SCP...1-2 1.3 Rationale for SCPX...1-3 1.4 SCP Operator: SCPC and BP relationship...1-5 1.5 ESIA Process...1-5
More informationEast Anglia TWO and East Anglia ONE North. Summary and Approach to Site Selection
East Anglia TWO and East Anglia ONE North Summary and Approach to Site Selection 1 Introduction ScottishPower Renewables (SPR) has recently concluded work in order to inform our onshore site selection
More informationNew Field Development Challenges in a Late Life Setting - Cladhan
New Field Development Challenges in a Late Life Setting - Cladhan Billy MacRae - Senior Geologist Acknowledgements: Sterling Resources, MOL 24th May 2017 1 Outline Introduction Cladhan field Appraisal
More informationTechnical Assistance. Programme of Activities
Technical Assistance Programme of Activities 2011-2012 July 2011 The present programme of technical assistance activities reflects the decisions taken at the fifth meeting of the Conference of the Parties
More informationENGINEERING SERVICES CONSULTANCY
ENGINEERING SERVICES CONSULTANCY Managing complexity, unlocking value Petrofac Engineering & Production Services 02 03 Discover the difference Consultancy services Petrofac is an international service
More informationOnshore & Offshore Engineering and Management of Subsea Cables and Pipelines
Established in 1997, Primo Marine is an independent specialist with a wealth of experience in subsea cable engineering, from landfalls to subsea marine infrastructures. With an extensive track record,
More informationSubsea Structural Engineering Services. Capability & Experience
Subsea Structural Engineering Services Capability & Experience Capability Overview INTECSEA s subsea structural engineering team has a proven track record for providing solutions to problems in the implementation
More informationWe appreciate your feedback
Publishing date: 03/04/2017 Document title: We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this document Energy Regulators OPINION Of THE
More informationIET Standards Committee. Governance. IET Standards Committee Remit. IET Standards Committee Constitution
IET Standards Committee Governance The IET is governed by a Board of Trustees, to which report five committees and Council. In addition, two main boards Knowledge Management Board and Membership and Professional
More informationOrbost Gas Plant Upgrade Project Community Information Sessions. 18 & 19 September 2018
Community Information Sessions 18 & 19 September 2018 Site location 9/14/2018 2 Ownership Update APA Orbost Gas Plant Pty Ltd (APA) purchased the plant and the export pipeline from Cooper Energy (CoE)
More informationSurvey and Geosciences. Capability & Experience
Survey and Geosciences Capability & Experience Capability Overview INTECSEA s Survey and Geoscience group is a team of Subject-Matter Experts in survey, geology and geophysics, geohazards, geotechnical
More informationWe ll Get You There. Petroxin Petroleum Solutions 2016
We ll Get You There. www.petroxin.org Petroxin Petroleum Solutions 2016 Unlocking the previously thought unreachable resources is Petroxin s priority. We focus on creative exploration and production techniques
More informationNational Petroleum Council. Arctic Potential
National Petroleum Council Arctic Potential Realizing the Promise of U.S. Arctic Oil and Gas Resources March 27, 2015 National Petroleum Council 1 Introduction In October 2013, the Secretary of Energy
More informationBrae Area Pre Decommissioning MARATHON BRAE. Brae Area Decommissioning Programme. June Revision 1.0
Brae Area Pre Decommissioning MARATHON BRAE Brae Area Decommissioning Programme June 2017 Revision 1.0 Why is Marathon Oil decommissioning? Decommissioning is a natural step in the life cycle of an oil
More informationNational Petroleum Council
National Petroleum Council 125th Meeting March 27, 2015 National Petroleum Council 1 National Petroleum Council Arctic Potential Realizing the Promise of U.S. Arctic Oil and Gas Resources March 27, 2015
More informationControl of Noise from the Operation of Stationary Systems
Control of Noise from the Operation of Stationary Systems This factsheet explains the objectives that are expected to be adopted and the measures that are expected to be put in place to control the effects
More informationRADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy
EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Radio Spectrum Policy Group RSPG Secretariat Brussels, 03 October
More informationATP Oil & Gas Corporation. Advanced Asset Acquisition and Divestiture in Oil & Gas. April 26-27, Gerald W. Schlief, Senior Vice President
ATP Oil & Gas Corporation Advanced Asset Acquisition and Divestiture in Oil & Gas April 26-27, 2006 Gerald W. Schlief, Senior Vice President Forward Looking Statement Certain statements included in this
More informationRampion Offshore Wind Farm Meet The Buyer Event
Rampion Offshore Wind Farm Meet The Buyer Event 26 February 2014, Amex Stadium, Brighton Vaughan Weighill, Project Manager Presentation Overview 1. Introduction 2. Project Overview 3. Current Status 4.
More informationSafety related product corrective action
Safety related product corrective action Brian Such Standards Solutions Project Manager British Standards Institution Copyright 2017 BSI. All rights reserved 1 03/07/2017 Safety related product corrective
More informationIncremental capacity between GREECE and ITALY. Public consultation documentation
Incremental capacity between GREECE and ITALY Public consultation documentation 2017-10 - 19 This document is published on the national transportation system operator's website in accordance with Chapter
More informationBritish Columbia s Environmental Assessment Process
British Columbia s Environmental Assessment Process Seminar #2 Guide for Aboriginal Groups and the General Public on the BC Environmental Assessment Process February 23, 2016 Paul Craven About the BC Environmental
More informationIntimate Communications Hub Interface Specification Report to Secretary of State
Intimate Communications Hub Interface Specification Report to Secretary of State DCC V1.0 28/02/14 Page 1 of 14 Executive Summary 1. DCC is required in accordance with the terms of its Licence to produce,
More informationControl of noise from the operation of stationary systems
Control of noise from the operation of stationary systems This factsheet aims to explain the objectives which are expected to be adopted and the measures that are expected to be put in place to control
More informationDelivery of Developer Funded Infrastructure A New Model
A New Delivery Model for Developer Works Hunter Water has a clear role in supporting the delivery of the Government 2036 vision, as articulated in the recently released Hunter Regional Plan. In consultation
More information(EC) ), 11(8) 347/ /2009, (EC)
ENTSOs consistent and interlinked electricity and gas model in accordance with Article 11(8) of Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 21 December 2016
More informationLessons learned & Future of FeedMAP
Lessons learned & Future of FeedMAP Final Workshop 6.10.2008 Trento, Italy Hans-Ulrich Otto Tele Atlas NV Lessons learned - FeedMAP in-vehicle client Positional accuracy of GPS receivers differs up to
More informationPetroleum Safety Levy Methodology. Decision Paper
Petroleum Safety Levy Methodology Decision Paper DOCUMENT TYPE: REFERENCE: Decision Paper CER/14/429 DATE PUBLISHED: 7 th August 2014 VERSION 3.0 The Commission for Energy Regulation, The Exchange, Belgard
More informationFINA 7372/4372, PETR 6310 Upstream Economics. Fall 2017
The objectives of the course are: FINA 7372/4372, PETR 6310 Upstream Economics D. H. Bellman Office: CBB 302J e-mail: d.h.bellman@gmail.com Understanding the business decisions involved with the exploration
More informationIBC Information and Communication Committee, Nils Andreas Masvie 27 January Paris Marriott Opera Hotel. Ungraded
Is standardization a cost cutting panacea in today s low oil price environment? Sharing lessons from recent mega-projects e.g. Nord Stream and South Stream IBC Information and Communication Committee,
More informationHydrocarbon Production Operations
An Intensive 5 Day Training Course Hydrocarbon Production Operations The Role of Technology in Operations 01-05 Oct 2017, Dubai 05-MAR-17 This course is Designed, Developed, and will be Delivered under
More informationApplying Earned Value to Overcome Challenges. In Oil and Gas Industry Surface Projects
Abstract Series on Earned Value Management 1 In Oil and Gas Industry Surface Projects By Williams Chirinos, MSc, PEng, PMP Statistics show that the failure rate of projects in the oil and gas industry
More informationHow it works and Stakeholder Benefits
UNFC 2009 - Applications in Uranium and Thorium Resources: Focus on Comprehensive Extraction How it works and Stakeholder Benefits David MacDonald Santiago 9-12 July 2013 Stakeholders of our reported resources
More informationWHY CHOOSE HFW? OFFSHORE CONSTRUCTION
WHY CHOOSE HFW? OFFSHORE CONSTRUCTION THEY STRIKE THE IDEAL BALANCE OF KNOWING THE LAW, BEING PRACTICAL AND BEING COMMERCIALLY SENSIBLE. THEY WORK HARD TO GET THE BEST RESULT FOR YOU CHAMBERS 2017 HFW
More informationDEVELOPMENTS IN EU MDD & IVDD SOFTWARE REGULATION
Objectives DEVELOPMENTS IN EU MDD & IVDD SOFTWARE REGULATION Some brief remarks on data protection Current regulation of medical devices software Overview of EU medical devices directives revision process
More informationProject: ACT Acorn Feasibility Study
Project: ACT Acorn Feasibility Study Terms of Use The ACT Acorn Consortium partners reserve all rights in this material and retain full copyright. Any reference to this material or use of the material
More informationConvention on Biological Diversity: ABS. The Nagoya Protocol on Access and Benefit-sharing
Convention on Biological Diversity: ABS The Nagoya Protocol on Access and Benefit-sharing What is the Nagoya Protocol? The Nagoya Protocol on Access and Benefit-sharing is a new international treaty that
More informationPhase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR
August 31, 2009 Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR-1000-1 Executive Summary A vendor pre-project design review of a new nuclear power plant provides an opportunity
More informationRegulatory Reforms in Mexico Energy Production and Environmental Protection. A Technical Regulator for a New Market Frame
Regulatory Reforms in Mexico Energy Production and Environmental Protection A Technical Regulator for a New Market Frame February 12th, 2014 CONTENT Legal Framework Strategic Design Regulatory Policy Gradual
More informationTHE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN
THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN W.A.T. Alder and J. Perkins Binnie Black and Veatch, Redhill, UK In many of the high hazard industries the safety case and safety
More informationABS of MGR in ABNJ: building blocks for a pragmatic solution
ABS of MGR in ABNJ: building blocks for a pragmatic solution dr. Thomas Vanagt mr. Dominic Muyldermans Contact: thomas.vanagt@abs-int.eu Talk Overview Short Bio ABS under the CBD The ABC of ABS Lessons
More informationDutch offshore wind energy policy an overview. Mark Stuurman Policy advisor
Dutch offshore wind energy policy an overview Mark Stuurman Policy advisor Overview Quick introduction Dutch Approach Site selection Roadmap Seabed Lease Tender system Future Challenges and latest developments
More information11th Annual Patent Law Institute
INTELLECTUAL PROPERTY Course Handbook Series Number G-1316 11th Annual Patent Law Institute Co-Chairs Scott M. Alter Douglas R. Nemec John M. White To order this book, call (800) 260-4PLI or fax us at
More informationRecognised Spectrum Access (RSA) for Receive Only Earth Stations Statement on the making of regulations to introduce RSA in the frequency bands 7850
Recognised Spectrum Access (RSA) for Receive Only Earth Stations Statement on the making of regulations to introduce RSA in the frequency bands 7850 7900 MHz and 25.5 26.5 GHz Statement Publication date:
More informationClick to edit Master title style
Lessons Learnt: UKCS Oil and Gas Click to edit Master title style Projects 2011-2016 Jan Manoharan Asset Stewardship Lead, NNS/WoS May 2018 Click to edit Master subtitle style OGA 2018 This presentation
More informationDNVGL-CG-0214 Edition September 2016
CLASS GUIDELINE DNVGL-CG-0214 Edition September 2016 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that it is prohibited by
More informationISO/IEC INTERNATIONAL STANDARD. Information technology Security techniques Privacy framework
INTERNATIONAL STANDARD ISO/IEC 29100 First edition 2011-12-15 Information technology Security techniques Privacy framework Technologies de l'information Techniques de sécurité Cadre privé Reference number
More informationEsso offshore projects
Esso offshore projects Introduction Esso Australia, a subsidiary of ExxonMobil Australia, is undertaking a program of work across some of its offshore assets, including those owned jointly by the Gippsland
More informationEmerging Subsea Networks
FIBRE-TO-PLATFORM CONNECTIVITY, WORKING IN THE 500m ZONE Andrew Lloyd (Global Marine Systems Limited) Email: andrew.lloyd@globalmarinesystems.com Global Marine Systems Ltd, New Saxon House, 1 Winsford
More informationDraft Myanmar Environmental Impact Assessment (EIA) Procedures: Comments 1 on aspects relevant to Offshore Oil and Gas Exploration and Production
Draft Myanmar Environmental Impact Assessment (EIA) Procedures: Comments 1 on aspects relevant to Offshore Oil and Gas Exploration and Production Appropriate EIA phasing for Petroleum E&P Activities According
More informationSubsea Field Development
Subsea Field Development Presented by Oseghale Lucas Okohue BEngr. Msc. CIPMP Course Instructor Name: Oseghale Lucas Okohue Position: Subsea Engineer Consultant Production Systems Drilling Systems Website:
More informationWNA Survey on Licensing. Christian Raetzke WNA CORDEL Director of Licensing 2 nd MDEP Conference, Paris, 16 Sept 2011
WNA Survey on Licensing Christian Raetzke WNA CORDEL Director of Licensing 2 nd MDEP Conference, Paris, 16 Sept 2011 2 WNA Licensing and Permitting Task Force Created in 2010 Jointly sponsored by WNA Working
More informationAccelerating the Deployment of Offshore Renewable Energy Technologies. IEA Implementing Agreement on Renewable Energy Technology Deployment
Accelerating the Deployment of Offshore Renewable Energy Technologies IEA Implementing Agreement on Renewable Energy Technology Deployment Background RETD The mission of RETD is to accelerate the large-scale
More informationMurchison and Beyond. John Allan Development and Decommissioning Projects Manager CNR International. Late Life and Decommissioning
Murchison and Beyond John Allan Development and Decommissioning Projects Manager CNR International Late Life and Decommissioning Murchison Decommissioning Update John Allan Development and Decommissioning
More informationHow To Draft Patents For Future Portfolio Growth
For the latest breaking news and analysis on intellectual property legal issues, visit Law today. www.law.com/ip Portfolio Media. Inc. 860 Broadway, 6th Floor New York, NY 10003 www.law.com Phone: +1 646
More informationFact Sheet IP specificities in research for the benefit of SMEs
European IPR Helpdesk Fact Sheet IP specificities in research for the benefit of SMEs June 2015 1 Introduction... 1 1. Actions for the benefit of SMEs... 2 1.1 Research for SMEs... 2 1.2 Research for SME-Associations...
More informationDraft executive summaries to target groups on industrial energy efficiency and material substitution in carbonintensive
Technology Executive Committee 29 August 2017 Fifteenth meeting Bonn, Germany, 12 15 September 2017 Draft executive summaries to target groups on industrial energy efficiency and material substitution
More informationOffshore Wind Risks - Issues and Mitigations
DNV Offshore Wind Soren Karkov DNV an independent foundation Our Purpose To safeguard life, property and the environment Our Vision Global impact for a safe and sustainable future 2 More than 145 Years
More informationRepresentation - Draft Modification Report UNC A 0636B 0636C 0636D Updating the parameters for the NTS Optional Commodity Charge
Representation - Draft Modification Report UNC 0636 0636A 0636B 0636C 0636D Updating the parameters for the NTS Optional Commodity Charge Responses invited by: 5pm on 14 June 2018 To: enquiries@gasgovernance.co.uk
More informationThe 45 Adopted Recommendations under the WIPO Development Agenda
The 45 Adopted Recommendations under the WIPO Development Agenda * Recommendations with an asterisk were identified by the 2007 General Assembly for immediate implementation Cluster A: Technical Assistance
More informationThe use of a tailored stakeholder management tool in an O&G Project
Oil industry and stakeholders The use of a tailored stakeholder management tool in an O&G Project Emanuele Bobbio, Sara Valentini, Roberto Mezzalama, Francesco Belfiore, Vito Bretti IAIA 2015, Firenze
More informationNAGOYA PROTOCOL ON ACCESS TO GR AND BENEFIT SHARING (ABS): CHALLENGES AND OPPORTUNITIES FOR MICROBIOLOGY DR. ALEJANDRO LAGO CANDEIRA
NAGOYA PROTOCOL ON ACCESS TO GR AND BENEFIT SHARING (ABS): CHALLENGES AND OPPORTUNITIES FOR MICROBIOLOGY DR. ALEJANDRO LAGO CANDEIRA Outline 1. About Access to genetic resources and Benefit- Sharing (ABS)
More informationPROJECT LOCATION PROJECT DESCRIPTION
APPLICATION: Environmental Authorisation for Prospecting Activities REF NO: NW 12443 PR APPLICANT: Khuma Mining and Exploration (Pty) Ltd MINERALS: Gold, Silver and associated precious metals LOCATION:
More informationOffice for Nuclear Regulation Strategy
Office for Nuclear Regulation Strategy 2015 to 2020 Office for Nuclear Regulation page 1 of 12 Office for Nuclear Regulation page 2 of 12 Office for Nuclear Regulation Strategy 2015 to 2020 Presented to
More informationSubmission to the Productivity Commission inquiry into Intellectual Property Arrangements
Submission to the Productivity Commission inquiry into Intellectual Property Arrangements DECEMBER 2015 Business Council of Australia December 2015 1 Contents About this submission 2 Key recommendations
More informationPan-Canadian Trust Framework Overview
Pan-Canadian Trust Framework Overview A collaborative approach to developing a Pan- Canadian Trust Framework Authors: DIACC Trust Framework Expert Committee August 2016 Abstract: The purpose of this document
More informationHerts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution
Herts Valleys Clinical Commissioning Group Review of NHS Herts Valleys CCG s constitution Agenda Item: 14 REPORT TO: HVCCG Board DATE of MEETING: 30 January 2014 SUBJECT: Review of NHS Herts Valleys CCG
More informationRepsol E&P T&T Ltd is one of the upstream Repsol YPF Group of companies currently operating in more than 20 countries around the world.
1 INTRODUCTION 1.1 Background Repsol E&P T&T Ltd is one of the upstream Repsol YPF Group of companies currently operating in more than 20 countries around the world. Repsol E&P has become one of the major
More informationCaroline Thomas Chief Counsel, Exploration, Property & Aboriginal Affairs, Vale. Paul MacLean President, EEM Sustainable Management
Speaker Panel Nalin Sahni, B.Sc. (Eng.), M.E.M., J.D. Associate, FMC Law Practice focused on litigation and commercial transactions with complex environmental, energy, Aboriginal, and mining issues Geological
More informationINDONESIA DEEPWATER INVESTMENT
INDONESIA DEEPWATER INVESTMENT SUBSEA ASIA 23-24 NOVEMBER 2015 @ DHARMAWANGSA HOTEL - JAKARTA PRESENTED BY DINAR INDRIANA KHOIRIAH HEAD PROJECT COMMUNICATIONS INPEX CORPORATION AGENDA Supply Chain Investment
More informationAppendix-1. Project Design Matrix (PDM)
Appendix-1 Project Design Matrix (PDM) Appendix-I Project Design Matrix (PDM) Version 1 PDM: Electric Power Technical Standards Promotion Project in Vietnam Duration: 3 Years (March in 2010 to January
More informationThe Next Wave in Flow Assurance Technology. NEPTUNE Advanced Subsea Flow Assurance Insulation System. Winner of OTC Spotlight Award
The Next Wave in Flow Assurance Technology NEPTUNE Advanced Subsea Flow Assurance Insulation System Winner of 2013 OTC Spotlight Award The Simple, Robust Choice for Offshore Oil and Gas Production The
More informationSUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value
SUBSEA 7 AND GRANHERNE ALLIANCE Viable Solutions Operators are seeking novel and reliable concepts to overcome industry challenges such as complex reservoirs, cost, growth and schedule creep and to optimise
More informationDeep Panuke Project Update CORE 2009 Dave Kopperson, Vice President, Atlantic Canada
Deep Panuke Project Update CORE 2009 Dave Kopperson, Vice President, Atlantic Canada Halifax, Nova Scotia October 7, 2009 Future Oriented Information In the interest of providing EnCana Corporation ( EnCana
More informationFor personal use only
Range Resources Limited ( Range or the Company ) 24 September Trinidad Operations Update Range is pleased to provide the following update with respect to its Trinidad operations, with the following highlights:
More informationGuidance on design of work programmes for minerals prospecting, exploration and mining permits
MINERALS GUIDELINES JUNE 2017 CROWN MINERALS ACT 1991 MINERALS PROGRAMME FOR MINERALS (EXCLUDING PETROLEUM) 2013 CROWN MINERALS (MINERALS OTHER THAN PETROLEUM) REGULATIONS 2007 Guidance on design of work
More informationNCS Prospects Conference
NCS Prospects Conference OGA Strategy & Plans Gunther Newcombe Director Operations November 2016 OGA OGA became a GOVCO on 1 st October 2016 Progressive regulation Role of the OGA OGA Approach MER UK Strategy
More information